UNITED STATES
8
g
NUCLEAR REGULATORY COMMISSION
7.
j
REGION I
c
631 PARK AVENUE
,o'
KING OF PRUSSIA, PENNSYLVANIA 19406
Docket No. 50-213
JUI.16 1981
Connecticut Yankee Atomic Power Company
ATTN:
Mr. W.G. Counsil
,
Vice President - Nuclear Engineering
and Operations
P.O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/81-07
This refers to the routine safety inspection conducted by Mr. T.H. Smith of
this office on May 16 - June 21, 1981 at the Haddam Neck Plant, Haddam,
Connecticut, of activities authorized by NRC License No. DPR-61, and to the
discussions of our findings held by Mr. T.H. Smith with Mr. R.H. Graves of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by
the inspector.
Within the scope o+' this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or your
contractors) believe to be exempt from disclosure under 10 CFR 9.5 a)(4), it is
necessary that you (a) notify this office by telephone within ten 10) days from
the date of this letter of your intention to file a request for withholding; and
(b) s9bmit within 25 days from the date of this letter a written application to
this office to withhold such information. Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the considera-
tionslistedin10CFR2.790(b)(4). The information sought to be withheld shall
TEo/
s
8108030299 810716
PDR ADOCK 05000213
G
.
- - _ _ - _ _ _ _ _ _ _ _ _ _
.
.
.
.
Connecticut Yankee Atomic
Power Company
2
JUL 16 1981
.
be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
extension of the 10-day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Ed
J.
runner, Chief, Projects
Br_ ch #1, Division of Resident
and Project Inspection
Enclosure:
Office of Inspecticn and Enforcement
Inspection Report Number 50-213/81-07
cc w/ encl:
R. Graves, Plant Superintendent
D.G. Diedrick, Manager of Quality Assurance
J.R. Himmelwright, Licensing Safeguards Engineer
J.F. Opeka, System Superintendent, Nuclear Operations