ML20009G085

From kanterella
Jump to navigation Jump to search
Requests Deletion of License Conditions 2.C.(12)(a) & 2.C.(10)re Seismic Design Margins & Interim Operation
ML20009G085
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/27/1981
From: Broehl D
PORTLAND GENERAL ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8108030313
Download: ML20009G085 (1)


Text

'

/>QQ x/ <gWg#

q'

-4 Portland General ElectricCompany 2 (Sy e

[

j

~

~

V

,s)

Dodd J. Bror+d Amstant Vce PreWent

'eg,

P y

July 27, 1981 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reactor Regulation ATTN:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Clark:

In accordance with License Condition 2.C.(12)(a), the originally intended seismic design margins have been substantially restored by completion of the modifications to the Trojan Control Building author-ized by Amendment 47 to the facility operating license.

Since License Condition 2.C.(10) relating to interim operation is now cancelled, and License Condition 2.C.(12) relating to modification of the Control Building has served its purpose, we hereby request that these two conditions be deleted from License NPF-1.

Sincerely, f

/?V W

/v Subscribed and sworn to before me this 27th day of July 1981.

/ / t /.

den Notary Public of Ordgen My commission expires: August 9, 1983 c:

Mr. R. H. Engelken, Director U. S. Nuclear Regulatory Commission Region V Director, Office of Inspection and Enforcement,

Mr. Lynn Frank, Director J

f'g$l

/

State of Oregon I

Department of Energy 8108030313 810727 fg h

PDR ADOCK 05000344 P

PDR

,, amn < : c vo o em 9m

.