Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009G149 + (13:09:07, 21 December 2024)
- 05000335/LER-1981-032, Forwards LER 81-032/03L-0 + (13:09:08, 21 December 2024)
- ML20009G145 + (13:09:09, 21 December 2024)
- ML20009G144 + (13:09:10, 21 December 2024)
- ML20009G143 + (13:09:10, 21 December 2024)
- 05000259/LER-1981-033, Forwards LER 81-033/03L-0.Supersedes + (13:09:13, 21 December 2024)
- 05000311/LER-1981-039-03, /03L-0:on 810608,determined post-accident Monitoring Instrumentation Had Not Been Completed Since 810422.Caused by Personnel Failure to Enter New Procedure Info Notification Sys.Personnel Counseled + (13:09:15, 21 December 2024)
- ML20009G138 + (13:09:16, 21 December 2024)
- IR 05000352/1981009 + (13:09:17, 21 December 2024)
- IR 05000029/1981006 + (13:09:28, 21 December 2024)
- 05000311/LER-1981-043, Forwards LER 81-043/03L-0.Detailed Event Analysis Encl + (13:09:29, 21 December 2024)
- ML20009G132 + (13:09:31, 21 December 2024)
- 05000311/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl + (13:09:33, 21 December 2024)
- 05000311/LER-1981-042-03, /03L-0:on 810609,RCS Allowed to Decrease to Less than 541 F.Caused by Overfeeding Steam Generators & Inserting Control Rods.Control Rods Withdrawn & Personnel Counseled on Plant Procedures & Practices + (13:09:34, 21 December 2024)
- ML20009G127 + (13:09:36, 21 December 2024)
- ML20009G128 + (13:09:36, 21 December 2024)
- ML20009G126 + (13:09:37, 21 December 2024)
- 05000311/LER-1981-041-03, /03L-0:on 810612,leakage of 13 Gpm Into Pressurizer Relief Tank Identified.Caused by RHR Suction Piping Relief Valve (2RH3) Actuating at Less than Design Lift Setting & Failing to Reseat.Lift Setting Readjusted + (13:09:38, 21 December 2024)
- ML20009G122 + (13:09:40, 21 December 2024)
- ML20009G123 + (13:09:40, 21 December 2024)
- 05000311/LER-1981-042, Forwards LER 81-042/03L-0.Detailed Event Analysis Encl + (13:09:42, 21 December 2024)
- 05000261/LER-1981-016-03, /03L-0:on 810611,during Startup,Motor Driven Auxiliary Feedwater Pump a Tripped Due to Low Discharge Pressure While Feeding Steam Generators.Event Reoccurred on 810716.Caused by Backleakage Through Discharge Valve AFW-40 + (13:09:44, 21 December 2024)
- ML20009G115 + (13:09:45, 21 December 2024)
- 05000369/LER-1981-090-03, /03L-0:on 810530,while Entering Mode 3,S/G 1B Wide Range Level Instrumentation Pegged High.Caused by Equalizer Valve on Transmitter 1CFLT5620 Valving Open,Resulting in Drained HP Ref Leg.Valve Closed & Leg Filled + (13:09:46, 21 December 2024)
- 05000311/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Encl + (13:09:48, 21 December 2024)
- 05000311/LER-1981-037-03, /03L-0:on 810608,paper Filter Drive for Containment Particulate Channel 2R11A Failed.Caused by Failure of Racket Arm Link on Filter Drive Mechanism.Link Replaced + (13:09:49, 21 December 2024)
- 05000261/LER-1981-016, Forwards LER 81-016/03L-0 + (13:09:51, 21 December 2024)
- BSEP-80-1263, RO 2-84-55:anchor Bolt Testing Required by IE Bulletin 79-02 Not Performed on Control Rod Drive Piping.Caused by Unusual Arrangements for Installation of Piping.Anchor Bolt Repairs & as-built Verifications Table Done + (13:09:52, 21 December 2024)
- 05000324/LER-1981-055-03, /03L-0:on 810614,during Test,Diesel Generator 1 Started,Then Immediately Tripped W/Concurrent Opening of Diesel Generator Output Breaker.Caused by Resistor AE8 Shorting to Ground.Resistor Replaced + (13:09:54, 21 December 2024)
- 05000369/LER-1981-090, Forwards LER 81-090/03L-0.Detailed Event Analysis Encl + (13:09:56, 21 December 2024)
- ML20009G103 + (13:09:57, 21 December 2024)
- BSEP-81-1259, Clarifies Event Previously Reported as LER (2-81-56)per 810618 Telcon.Facility in Compliance W/Ieee 279-1971.No Reportable Event Determined.Ler Number Referenced Will Be Reassigned as Appropriate + (13:09:58, 21 December 2024)
- ML20009G100 + (13:10:00, 21 December 2024)
- ML20009G099 + (13:10:01, 21 December 2024)
- ML20009G098 + (13:10:02, 21 December 2024)
- ML20009G097 + (13:10:03, 21 December 2024)
- ML20009G095 + (13:10:03, 21 December 2024)
- 05000324/LER-1981-055, Forwards LER 81-055/03L-0 + (13:10:04, 21 December 2024)
- 05000311/LER-1981-037, Forwards LER 81-037/03L-0.Detailed Event Analysis Encl + (13:10:06, 21 December 2024)
- ML20009G090 + (13:10:07, 21 December 2024)
- 05000324/LER-1981-056-01, /01T-0:on 810624,notification Received That 38 Pipe Supports Would Have Failed During Design Basis Seismic Event.Caused by Higher than Normal Slenderness Ratio. Identified Supports Upgraded + (13:10:08, 21 December 2024)
- 05000369/LER-1981-081-03, /03L-0:on 810508,while in Mode 5,control Room Received High Groundwater Alarm.Caused by Localized Temporary High Groundwater Level at 0.25 Ft Above Slab Elevation.Level Checked & Alarm Cleared + (13:10:10, 21 December 2024)
- 05000287/LER-1981-013-03, /03L-0:on 810528,1-inch Breach Discovered in 3-h Fire Barrier in Floor of Control Room Outside Shift Supervisor Ofc.Cause Undefined Due to Breach Being Covered Since Const of Control Room + (13:10:12, 21 December 2024)
- ML20009G086 + (13:10:13, 21 December 2024)
- ML20009G085 + (13:10:14, 21 December 2024)
- 05000309/LER-1981-081, Forwards LER 81-081/03L-0.Detailed Event Analysis Encl + (13:10:15, 21 December 2024)
- 05000324/LER-1981-056, Forwards LER 81-056/01T-0 + (13:10:17, 21 December 2024)
- ML20009G080 + (13:10:18, 21 December 2024)
- 05000287/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl + (13:10:20, 21 December 2024)
- 05000369/LER-1981-080-03, /03L-0:on 810508,while in Mode 5,initial Fuel Loading,Both Trains of RHR Sys Were Inoperable.Caused by Failure of Personnel to Prevent Entering of Mode 5 W/O RHR Train B Operable.Operating Procedure Will Be Written + (13:10:21, 21 December 2024)
- ML20009G076 + (13:10:24, 21 December 2024)