i
.
.
o
UNITED STATES
g
!
NUCLEAR REGULATORY COMMISSION
o
$
9f
REGION 1
631 PARK AVENUE
0,
j
%
,e
KING OF PRUSSIA, PENNSYLVANIA 19406
Docket No. 50-333
JUL 161981
'
Power Authority of the State of New York
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. R. J. Pasternak
Resident Manager
j
P. O. Box 41
Lycoming, New York
13093
Gentlemen:
I
l
Subject:
Inspection 50-333/81-14
This refers to the routine, safety inspection conducted by Mr. J. Linville of
this office on June 1-30, 1981 of activities authorized by NRC License No.
DPR-59 and to the discussions of our findings held by Mr. Linville with
Mr. Baker and other members of your staff at the conclusion of the inspection.
,
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
!
l
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
,
letter and the enclosed inspection report will be placed in. the EC's Public
'
Document Room.
If this report contains any information that you (or our
contractors) believe to be exempt from disclosure under 10 CFR 9.5(a) 4), it
is necessary that you (a) notify this office by telephone within ten 10) days
from the date of this letter of your intention to file a request for withholding;
and (b) submit within 25 days from the date of this letter a written application
to this office to withhold such infomation.
Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the infomation which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the consider-
ationslistedin10CFR2.790(b)(4). The informatiLn sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Document Room. The telephone
notification of your intent to request withholding, or any request for an
extension of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
$ 0l
s
8108o30376 810716
/ [
DR ADOCK 05000333
.
.
-
. _ _ _ _ , _ , -
.
_ _ _ _ _ ,
.
.
.
JUL16 bbl
Power Authority of the State
2
of New York
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
m
ldo
.Brunner,ChieT
Pro ects Branch #1, Division of
Resident and Project Inspection
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 81-14
cc w/ enc 1:
George T. Berry, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Site Quality Assurance Engineer
J. F. Davis, Chaiman, Safety Review Comittee
C. M. Pratt, Assistant General Counsel
G. M. Wilverding, Manager-Nuclear Licensing