ML20009G122

From kanterella
Jump to navigation Jump to search
Telcon W/D McGuire Re Temporary Loss of Power to Security Sys on 810511.Power Loss Caused Inability to Monitor Security Alarms in CAS & Secondary Alarm Station.Sys Back on Line & Fully Operational.Written Rept Submitted by 810815
ML20009G122
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/11/1981
From: Hatcher W
CAROLINA POWER & LIGHT CO.
To:
References
NUDOCS 8108030350
Download: ML20009G122 (1)


Text

_ _..

l JSNRC R~

(D

' D TE,En,E'P.H 0 N E REP 0RT

/cfg % r

j,oc,p ass f / - g g. 7 d I 6 c l M M 1 1 A 8
Si 25~- 324 FACILITY Brunswick 1 and 2 DOCKET NUMBER 48 % i b (i 5/11/81 8:15 a.m-i

-3 TELECON DATE TIME LIC OCC. NO.

~

.-,,m h v.v u o A ~ -

. a l

LME

\\

INSPECT PER MC DW gu lb L W

!!. Hatcher CALLED at 8:15 this date WITH THE FOLLOWING:

t Temocrary Loss of Power to. Security Systems

SUBJECT:

On May 11,1981 at 7:1{a.m. a temporary loss _ of. oower occurred.while This' loss of nower

~

switchina froni one emergencv power buss to another.

caused the inability to monitor seciarity alarms in the CAS'and SAS.

~

The system was back on-line at 7:13 c.m. and fully operational at 7:17 a.m. A written report will be submitted to his office within five (5)

~

days.

O 5/15/81 A WRIiTEN REPORT IS DUE:

AITS NUMBER:

ffh 8108030350 810511 PDR ADOCK 05000324 l

S pop