Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20024C289 + (05:02:29, 21 December 2024)
- ML20024C287 + (05:02:30, 21 December 2024)
- ML20024C286 + (05:02:32, 21 December 2024)
- ML20024C285 + (05:02:32, 21 December 2024)
- ML20024C284 + (05:02:33, 21 December 2024)
- ML20024C282 + (05:02:33, 21 December 2024)
- ML20024C281 + (05:02:34, 21 December 2024)
- ML20024C279 + (05:02:37, 21 December 2024)
- ML20024C277 + (05:02:38, 21 December 2024)
- ML20024C278 + (05:02:38, 21 December 2024)
- AECM-83-0363, RO 83-049/0:on 830526,halon Bottle 2 in Panel P936 Discharged Until Empty.Hourly Fire Watch Established Pending Bottle Replacement.Limiting Condition for Operation to Be Maintained.Next Rept Will Be Submitted by 830731 + (05:02:39, 21 December 2024)
- PLA-1706, Supplements 830328 & 0524 Responses to Violations Noted in IE Insp Rept 50-387/83-02.Vendor Procedures for Performing Gross Alpha,Tritium,Iron & Strontium Analyses of Effluent Samples Will Be Reviewed & Approved + (05:02:41, 21 December 2024)
- IR 05000482/1983004 + (05:02:43, 21 December 2024)
- 05000309/LER-1982-009-03, Control Room Ventilation Motor Operator Valve Failed to Close.Caused by Motor Failure Due to Oil & Dirt Accumulation in Motor Housing.Valve Motor Replaced.Valve Operators Will Be Reoriented + (05:02:48, 21 December 2024)
- ML20024C270 + (05:02:50, 21 December 2024)
- PLA-1658, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-02.Corrective Actions:Review of Specific Procedures for Effluent Analyses Cited in Violations Will Be Performed.Reg Guide 1.33,Rev 2 Does Not Apply + (05:02:51, 21 December 2024)
- ML20024C269 + (05:02:51, 21 December 2024)
- IR 05000334/1983008 + (05:02:53, 21 December 2024)
- ML20024C265 + (05:02:56, 21 December 2024)
- AECM-83-0368, Updated RO 83-027/1:on 830321,during Seismic Monitoring Sys Functional Test,Operation of Chart Recorders & Spectrum Analyzers Unacceptable.Caused by Faulty Circuit Card.Card Replaced.Sys Restored on 830519 + (05:02:57, 21 December 2024)
- ML20024C262 + (05:02:57, 21 December 2024)
- 05000395/LER-1983-054-03, /03L-0:on 830601 Plant Auxiliary Relay Rack XPN-6034 Balance Declared Inoperable Due to Power Failure. Caused by Loose Fuse Holder on Power Supply Module Grounding Supply.Module Replaced + (05:03:00, 21 December 2024)
- ML20024C259 + (05:03:01, 21 December 2024)
- IR 05000387/1983002 + (05:03:02, 21 December 2024)
- ML20024C256 + (05:03:03, 21 December 2024)
- ML20024C254 + (05:03:05, 21 December 2024)
- IR 05000285/1983008 + (05:03:14, 21 December 2024)
- IR 05000382/1983010 + (05:12:20, 21 December 2024)
- ML20024C248 + (05:12:21, 21 December 2024)
- ML20024C247 + (05:12:22, 21 December 2024)
- 05000387/LER-1983-084-03, /03L-0:on 830524,during Surveillance Testing, Control Room Emergency Outside Air Supply Sys Fan Tripped. Caused by Out of Tolerance of Time Delay Relay for Heater Differential Temp.Relay Reset + (05:12:23, 21 December 2024)
- 05000387/LER-1983-086-03, /03L-0:on 830525,reactor Bldg Door Opened While Maint Performed on Turbine Bldg Side of Air Lock to Reactor Bldg.Caused by Personnel Error.Individual W/Radio Communication Will Be Posted + (05:12:28, 21 December 2024)
- ML20024C244 + (05:12:29, 21 December 2024)
- ML20024C242 + (05:12:30, 21 December 2024)
- IR 05000373/1983022 + (05:12:31, 21 December 2024)
- ML20024C240 + (05:12:32, 21 December 2024)
- ML20024C239 + (05:12:34, 21 December 2024)
- ML20024C236 + (05:12:37, 21 December 2024)
- AECM-83-0385, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Incorrect Wipe Setting on Normally Closed Contacts Converted from Normally Open Contacts on Hfa Relays.Also Reportable Under Part 21 for Unit 1 + (05:12:38, 21 December 2024)
- ML20024C234 + (05:12:38, 21 December 2024)
- A03272, Responds to NRC Re Violations Noted in IE Insp Repts 50-245/83-06 & 50-336/83-08.Corrective Actions:Logging Requirement Implemented for Periodic Verification of Computer Updating + (05:12:40, 21 December 2024)
- ML20024C231 + (05:12:42, 21 December 2024)
- IR 05000382/1983019 + (05:12:43, 21 December 2024)
- IR 05000245/1983006 + (05:12:44, 21 December 2024)
- ML20024C226 + (05:12:48, 21 December 2024)
- ML20024C225 + (05:12:52, 21 December 2024)
- ML20024C223 + (05:12:54, 21 December 2024)
- 05000251/LER-1983-004-03, /03L-0:on 830526,valve MOV-4-1405 Failed to Open During Routine Test of Auxiliary Feedwater Pump B.Caused by High Resistance Across Contacts Inside Motor Operator. Contacts Cleaned & Valve Tested + (05:12:55, 21 December 2024)
- 05000327/LER-1983-077-03, /03L-0:on 830531,auxiliary Feedwater Automatic Valve 1-PCV-3-122 Declared Inoperable.Caused by Clogged Hydraulic Moog Valve & Hydraulic Pump Motor Failure Due to High Amperage.Valve,Pump & Motor Replaced + (05:12:58, 21 December 2024)
- 05000327/LER-1983-083-03, /03L-0:on 830607,flow Rate Measuring Device for Shield Bldg Declared Inoperable Due to Sense Lines Becoming Clogged W/Dirt from Stack Discharge.Line Blown Out & Flow Monitor Declared Operable + (05:13:00, 21 December 2024)
- ML20024C217 + (05:13:01, 21 December 2024)