ML20024C239

From kanterella
Jump to navigation Jump to search
Discusses QA Program Insp Rept 99900521/83-01 Re Brown & Root Anchor Bolt Problem.Problem Reported as Part 21 Deficiency & Being Processed by Bechtel
ML20024C239
Person / Time
Issue date: 07/07/1983
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mills W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-QA-99900521 VITS-81-152, NUDOCS 8307120437
Download: ML20024C239 (1)


Text

r yt. 0 71983 NEMORANDUM FOR:

W. R. Mills, Chief Events Analysis Branch, Division of Engineering and Quality Assurance, IE FROM:

U. Potapovs, Chief, Vendor Program Branch, Division of Vendor and Technical Programs, Region IV

SUBJECT:

AITS'NO. H0700372 - PART 21, BROWN & ROOT - ASCERTAIN IF BROWN & ROOT ANCHOR BOLT PROBLEM IS PROPERLY RESOLVED (VITS81-152)

During the 99900521/83-01 inspection at Bechtel Power Corporation, Houston, Texas, office, actions and responsibilities relative to the subject item were evaluated.

The purpose of this inspection was to determine the present-status of this problem.

This problem had been reported as a 10 CFR Part 21 deficiency by Brown & Root and is now being processed by Bechtel Power Corporation.

The results of the Region IV inspection are presented in Section E.4 of the attached report.

We consider this item closed.

Please contact us if you have any questions.

aatetche en U. extrrraarc Uldis'Potapovs,-Chief Vendor Program Branch

'bec: R. L. Baer, IE R. F. Heishman, IE J. T. Collins, RIV R.-

L. Bangart, RIV BC:VPh/

SC:RSS D:DV&TP JRCos llo/ mas CJHale UPotapo 4 RLBangart CN 6 //4/83

~h/((/83 fo/[y/83

/ /83 Q

8ao712o427

3o70, AUM PDR GA999 EECBRRT 7

99900521 PDR