Text

-_

~,

'JUN 171983 Docket No.

99900521/83-01 Bechtel Power Corporation Los Angeles Power Division ATTN:

Mr. L. G. Hinkleman Vice President and General Manager P. O. Box 60680, Terminal Annex Los Angeles, CA 90060 Gentlemen:

This-refers to the inspection conducted by Mr. J. R. Costello of this office on March 28-April 1 and April 11-15, 1983, at your facilities at Norwalk, California, and Houston, Texas, and to the discussions of our findings with members of the Bechtel staff at the conclusion of each inspection.

These inspections included followup covering the following items:

(1) conflicting requirements in Bechtel specification 13-M-037A regarding use of class "R" equipment h 1E systems; (2) conflicting QA requirements in purchase. order and equipment specification issued to Midland Ross; (3) heating, ventilation, and air conditioning design, South Texas Project (STP); (4) Hilti anchor bolt problem, STP; (5) discrepancies in the seismic qualification of cable trays and a Crane Deming horizontal pump, STP; and (6) the status of three Brown & Root 10 CFR Part 21 reports, STP.

Areas examined during this inspection and o'ur findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During this inspection it was found that you failed to meet certain NRC requirements.

The specific findings and references to the pertinent require-ments are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written state-ment containing:

(1) a description of steps that have been or will be taken to correct this item; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed.

Consideration may be given to extending your response time for good cause shown.

5 8307120453 830617 PDR GA999 EECBECH

~_g 99900521 PDR s

,Un t

RIV

  • [

RSS $C-

'SC:RS BC:VP8

-D:q

/

.J JRCostello/ mas CJHale UPotapo s LBangart 6 / 9 /83

[O g /83 (o //

83 h y /p

r,

/

Bechtel Power Corporation Los Angeles Power Division j l

LThe response requested by;this letter is not subject to 'the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

InaccordancewithIdCFR2.790oftheCommission'sregulations,acopyofthis letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.. If this ' report contains any information.that you believe to be exempt' from disclosure under 10 CFR.9.5(a)(4), it is necessary that you (a). notify.this office by telephone within 10 dejs-from the date of.this letter.

of your intention -to_ file a request. for withholding; and (b) submit within 25 days from the date of this letter a written application to this' office to-withhold such information.

If your receipt of this letter has been delayed

'such that less than-7, days-are available for your review, please notify

.this office promptly-so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document'or part sought to be withheld, and which contains'a full statement of the reasons on the basis which it is claimed that~ the information should be withheld from public disclosure.

This_section further. requires the statement'to address with specificity.the considerations listed in 10 CFR 2.790(b)(4). -The information sought to be withheld shall be incor-porated as far as possible into a separate part.of the affidavit.

If we do_not hear from you in this regard within the specified periods noted above, the report will be placed in the_Public-Document Room.

~

~

Should you have any questions concerning this(inspection, we will be pleasdd to discuss them with you.

L:

r g

Sincerely,

,[

a te 9

W ys.pt bs LLD/'8

- (

U. PO7AFO/S" Uldis"Potapovs,1 Chief.

Vendor Program Branch-7l.

Enclosures:

~

~

' ~ ~

-1.

Appendix A - Notice of Nonconformance 2.

Appendix B - Inspection Report No. 99900521/83-01 3.

Appendix C -' Inspection Data Sheets (18 pages) bcc:

JTCollins,.RIV RLBangart,'RIV F

JEGagliardo, RIV EHJohnson, RIV.

MIS Section (J. Perry)-

VPB Branch Chief' VPB Section Chiefs

'VPB Inspector DMB-TE:09-w,

-n

-m,

,m,--.,-+,n

,r-v....-,

~....., _. - - -.., - - -. - -. - -.. -. - -

-,