Text
7
-
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-373/83-22(DRMSP)
Docket No. 50-373 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 l
Facility Name: LaSalle County Nuclear Station, Unit I Inspection At: LaSalle County, IL Inspection Conducted: May 23-25, 27, and June 1-3, 1983 Date of Last Physical Protection Inspection: January 1-14, 1983 Type of Inspection:
Unannounced Physical Protection Inspectors:
h h
O g/.L.Relanger Da'te j (, Physical Protection Specialist Wm W. k hiin 60/73 T.J/Mgdeda Date Physt il Protection Specialist
.
bb
&
L G. M. Christoffer
'/
Date Physical Protection Specialist Approved By:
[
R. Cteed, Chief Dhte afeguards Section Inspection Summary Inspection on May 23-25, 27, and June 1-3, 1983 (Report No. 50-373/83-22(DRMSP)
Areas Inspected:
Included a review of Security Plan and Implementing Pro-cedures; Security Organization - Personnel; Security Organization - Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Physical Barriers - Protected Area; Physical Barriers
- Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control - Personnel; Access. Control - Packages; Access Control - Vehicles; Detection Aids - Vital Area; Alarm Stations; Communications; General Require-ments - Training and Qualification Plan; Additional Requirements - Power Enclosure Contnins SAFEGUARDS INF03W.T10i!
8307120439 830707 Upon Separation This PDR ADOCK 05000373 O
PDR Page is Decontrolled
..
.
>
.
.
.
- _
..
.
_
.1
.-.
~
.
,
,
1 Reactors; Safeguards-Contingency Plan; Safeguards Information; Independent Inspection Effort; and Previous' Items of Noncompliance. The inspectors also reviewed _two' allegations received by Region III'
The inspection involved 164
.
inspector-hours onsite by three NRC' inspectors of'which.49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> were accomp-
,lished during the off-shift periods. The inspection began during the day
. shift.
Results: Based on this inspection, five items of noncompliance were identi-
,
fied. The previous-items of noncompliance were closed out. Of the two
'
allegations, one-was substantiated and resulted in an item of noncompliance (Section 21); the second allegation-(Section 13) was not substantiated. The licensee was found to be in compliance with NRC. requirements within the areas examined during'the inspection, except for the following items:
.
1.
-Physical Barriers - Protected Area: The licensee failed to proviae an
'
adequate isolation zone.
(Section 12).
2.
Access Control - Personnel: The' licensee failed to implement an adequate screening program.
(Section 17)-
3.
Access Controls - Vehicles: The licensee failed to control a designated vehicle.. (Section 19)
4.
Alarm Stations: The licensee failed to provide an item of alarm station equipment. -(Section 21)
'
.- 5.
Safeguards Information: The licensee failed to adequately protect Safeguards Information.
(Section 26)
(Details - UNCLASSIFIED )
Enclosure Contains SAFEGUARDS lilFORtMTIO*l Upon Ecporaticn This Page is Decontrolled-2
..
..
.