Forwards IE Insp Rept 50-458/83-03 on 830228-0304.No Noncompliance Noted
ML20024C287
Person / Time
Site: River Bend 
Issue date: 05/16/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20024C288 List:
References
NUDOCS 8307120486
Download: ML20024C287 (2)


See also: IR 05000458/1983003

Text

_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _

_ _ _ _ _ _ _ _

. _ _

_ _ _ _ - _ _

_ _ _ _ _ - _

__

_.

_ _ _ _ _ _ _ _ _ _ _

oms

-

.

NAY 101N3

Docket:

50-458/83-03

Gulf States Utilities

ATTN: William Cahill, Jr.

Senior Vice President -

River Bend Nuclear Group

P. O. Box 2951

Beaumont, TX 77704

Gentlemen:

This refers to the environmental protection inspection conducted by Mr. R. E. Baer

of this office during the period February 28-March 4,1983, of the activities

authorized by NRC Construction Permit CPPR-145 for River Bend Unit 1, and to the

discussion of our findings held with Mr. J. E. Booker, and other members of your

staff.

Areas examined during the inspection included:

(1)organizationandadministration,

(2) audits, (3) training, (4) procedures, (5)'preoperational and proposed opera-

tional nonradiological and radiological environmental monitoring programs, and

(6) site historical landmarks. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the requirements

of2.190(b)(1).

I

h

TPBh

RPS-B

R

FRPS

FRPS

R,Baerj/83

pMurray

GBrown

WCross

Gi

dsen

-j d

5 /g/83

'n/g/83

jf/g/83

3 /p/83

6/6

l

DRRP&EP

DV

JGaglia do 1 M

RB

i

g p/83

J/N/83

'N

N

'

l

8307120486 830516

PDR ADOCK 05000458

i

?

.

.-.,

PDR

__

_

__

__

l{l

TkOf.

_ _ _ _ _ - _ _ _ _

_ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _

_ _ _

_ _ . _ _ _ - _ _ _ _

_ -

_ ,

.

.

Gulf States Utilities

-2-

-

Should you have any questions concerning this letter, we will be pleased to

discuss.them with you.

Sincerely,

M

G. L. Madsen, Chief

LReactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-458/83-03

cc:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

Engineering, Nuclear Fuels

& Licensing

P. 0. Box 2951

Beaunont, TX 77704

bec: c/o DMB(IE01)

bcc's distributed by RIV:

Resident ~ Inspector

SectionChief(RPS-B)

Inspector

J. Collins, RA

R. Bar.gart, DV&TP

Info. Systems.

RPB1

~.RPB2

TPB

RIV File

C.-Wisner, PA0

. Department

-