ML20024C287
| ML20024C287 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/16/1983 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20024C288 | List: |
| References | |
| NUDOCS 8307120486 | |
| Download: ML20024C287 (2) | |
See also: IR 05000458/1983003
Text
_ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
_ _ _ _ _ _ _ _
. _ _
_ _ _ _ - _ _
_ _ _ _ _ - _
__
_.
_ _ _ _ _ _ _ _ _ _ _
oms
-
.
NAY 101N3
Docket:
50-458/83-03
Gulf States Utilities
ATTN: William Cahill, Jr.
Senior Vice President -
River Bend Nuclear Group
P. O. Box 2951
Beaumont, TX 77704
Gentlemen:
This refers to the environmental protection inspection conducted by Mr. R. E. Baer
of this office during the period February 28-March 4,1983, of the activities
authorized by NRC Construction Permit CPPR-145 for River Bend Unit 1, and to the
discussion of our findings held with Mr. J. E. Booker, and other members of your
staff.
Areas examined during the inspection included:
(1)organizationandadministration,
(2) audits, (3) training, (4) procedures, (5)'preoperational and proposed opera-
tional nonradiological and radiological environmental monitoring programs, and
(6) site historical landmarks. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter, and submit written
application to withhold information contained therein within 30 days of the
date of this letter. Such application must be consistent with the requirements
of2.190(b)(1).
I
h
TPBh
RPS-B
R
FRPS
FRPS
R,Baerj/83
pMurray
GBrown
WCross
Gi
dsen
-j d
5 /g/83
'n/g/83
jf/g/83
3 /p/83
6/6
l
DRRP&EP
DV
JGaglia do 1 M
i
g p/83
J/N/83
'N
N
'
l
8307120486 830516
PDR ADOCK 05000458
i
?
.
.-.,
__
_
__
__
l{l
TkOf.
_ _ _ _ _ - _ _ _ _
_ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _
_ _ _
_ _ . _ _ _ - _ _ _ _
_ -
_ ,
.
.
Gulf States Utilities
-2-
-
Should you have any questions concerning this letter, we will be pleased to
discuss.them with you.
Sincerely,
M
G. L. Madsen, Chief
LReactor Project Branch 1
Enclosure:
Appendix - NRC Inspection Report 50-458/83-03
cc:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear Fuels
& Licensing
P. 0. Box 2951
Beaunont, TX 77704
bec: c/o DMB(IE01)
bcc's distributed by RIV:
Resident ~ Inspector
SectionChief(RPS-B)
Inspector
J. Collins, RA
R. Bar.gart, DV&TP
Info. Systems.
RPB1
~.RPB2
TPB
RIV File
C.-Wisner, PA0
- Louisiana State Div. of Radiation Control
- Louisiana State Univ., Gov't Documents
. Department
-