ML20024C242
| ML20024C242 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/23/1983 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Maurin L LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20024C243 | List: |
| References | |
| NUDOCS 8307120440 | |
| Download: ML20024C242 (2) | |
See also: IR 05000382/1983010
Text
..
_
_
DmB
-
,
'
' ,
'
"
4
s
MAY 2 31983
Docket:
50-382/83-10:
Louisiana Power and Light Company
ATTN:
L. V. Maurin, Vice President
Nuclear Operations
142 Delaronde Street
New Orleans, LA' 70174
Gentlemen:
This refers to a preoperational inspection of your Chemistry / Radiochemistry
Program conducted by Mr. R. Wise and Dr. J. B. Nicholas of this office during
the period of February 28-March 3,1983, of the activities authorized by
NRC Construction Permit CPPR-103 for Waterford 3 and to the discussion of our
findings held with Mr. S. A. Alleman and other members of your staff.
Principal areas examined during this routine preoperational inspection of your
chemistry / radiochemistry program included:
(1) organization; (2) staffing and
staff qualifications, (3) training program, (4) radiochemistry program;
(5) secondary chemistry program; (6) chemical inventcry program; (7) primary
chemistry sampling system, (8) secondary chemistry sampling system; (9) post-
accident sampling system; (10) effluent releases; (11) facilities and equipment;
(12) laboratory instrument calibration and quality control, (13) audits and
review of chemistry / radiochemistry activities; (14) administrative and analytical
procedures; and (15) confirmatory measurements. Within these areas, the inspec-
tion consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
The inspection
findings are documented in the enclosed inspection report.
,
l
l
Within the scope of the inspection, no violations or deviations were identified.
l
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will-be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
app?ication to withhold information contained therein within 30 days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
FRPS
FRPS
TPB
RPS-B g
BNi
olas:jd
RWisE
BMurray
GBr n
WCrossman
7
5/f/83
5/f /83 f
5/ /83
5/ /83
5/lI/83
h
(
RPB-lh
DRRP&E
DV
y
'
GMadsen
JGagliardo
R
6mrt
5/p/83
5/f3/83
Sq/83.
3
f
C307120440 830523
PDR ADOCK 05000382
l
!
._
.
_ . .
//l
1 68I
!
"
,
__
_.
.
_
_
._.
.
. .
.
.-_ _ ._ _
>
-
,
4
MAY 2 31933
'
. Louisiana Power and Light
-2-
Should you have any-questions concerning this letter, we will be pleased to
discuss them with you.
,
.
.
Sincerely,
,
,
I
- G. L. Madsen, , Chief
Reactor-Project' Branch 1
.
3
Enclosure:
~
Appendix-- NRC Inspection Report 50-382/83-10 ,
[
>
c"
.
'
Louisiana Power and Light Company
.
ATTN:
R. P. Barkhurst, Plant Manager.
'-..
,
-
P. O. Box B
Killona, LA 70066
-
'
Louisiana Power.and Light Company
-
'
P'
ATTN:
F. J. Drummond, Project Manager, Nuclear
142 Delaronde Street
New Orleans, LA 70174
,
' Louisiana Power and
'ght Company
'
ATTN: Tom Gerrets, QA Manager
142 Delaronde Street '
,
- .
New Orleans, LA 70174
bec:
c/o DMB(IE01)
j
bec's distributed by RIV:
'
Resident Inspector-
'
Section Chief-(RPS-B)
Accompanying Personnel
J. T. Collins
R. L. Bangart
Info Systems
RPB1
RBP2
TPB
RIV File
- LouisianaLDiv of Radiation Control-
- *
J
4
l
5
g
9.,
,.-,-i
- - , , - , , .
, . - -
w
9-
,aw-.4
y
-,
,--,-e-e,,,er-
1.
4
-c,-
wv--,
,c-
, ev
..mw -
,,,_,yye.
- <
v
-
---,e,
w