ML20024C242

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-382/83-10 on 830228-0303.No Noncompliance Noted
ML20024C242
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/23/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maurin L
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20024C243 List:
References
NUDOCS 8307120440
Download: ML20024C242 (2)


See also: IR 05000382/1983010

Text

..

_

_

DmB

-

,

'

' ,

'

"

4

s

MAY 2 31983

Docket:

50-382/83-10:

Louisiana Power and Light Company

ATTN:

L. V. Maurin, Vice President

Nuclear Operations

142 Delaronde Street

New Orleans, LA' 70174

Gentlemen:

This refers to a preoperational inspection of your Chemistry / Radiochemistry

Program conducted by Mr. R. Wise and Dr. J. B. Nicholas of this office during

the period of February 28-March 3,1983, of the activities authorized by

NRC Construction Permit CPPR-103 for Waterford 3 and to the discussion of our

findings held with Mr. S. A. Alleman and other members of your staff.

Principal areas examined during this routine preoperational inspection of your

chemistry / radiochemistry program included:

(1) organization; (2) staffing and

staff qualifications, (3) training program, (4) radiochemistry program;

(5) secondary chemistry program; (6) chemical inventcry program; (7) primary

chemistry sampling system, (8) secondary chemistry sampling system; (9) post-

accident sampling system; (10) effluent releases; (11) facilities and equipment;

(12) laboratory instrument calibration and quality control, (13) audits and

review of chemistry / radiochemistry activities; (14) administrative and analytical

procedures; and (15) confirmatory measurements. Within these areas, the inspec-

tion consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspectors.

The inspection

findings are documented in the enclosed inspection report.

,

l

l

Within the scope of the inspection, no violations or deviations were identified.

l

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will-be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

app?ication to withhold information contained therein within 30 days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

FRP

FRPS

FRPS

TPB

RPS-B g

BNi

olas:jd

RWisE

BMurray

GBr n

WCrossman

7

5/f/83

5/f /83 f

5/ /83

5/ /83

5/lI/83

h

(

RPB-lh

DRRP&E

DV

y

'

GMadsen

JGagliardo

R

6mrt

5/p/83

5/f3/83

Sq/83.

3

f

C307120440 830523

PDR ADOCK 05000382

l

!

._

.

_ . .

//l

1 68I

!

"

,

__

_.

.

_

_

._.

.

. .

.

.-_ _ ._ _

>

-

,

4

MAY 2 31933

'

. Louisiana Power and Light

-2-

Should you have any-questions concerning this letter, we will be pleased to

discuss them with you.

,

.

.

Sincerely,

,

,

I

- G. L. Madsen, , Chief

Reactor-Project' Branch 1

.

3

Enclosure:

~

Appendix-- NRC Inspection Report 50-382/83-10 ,

[

>

c"

.

'

Louisiana Power and Light Company

.

ATTN:

R. P. Barkhurst, Plant Manager.

'-..

,

-

P. O. Box B

Killona, LA 70066

-

'

Louisiana Power.and Light Company

-

'

P'

ATTN:

F. J. Drummond, Project Manager, Nuclear

142 Delaronde Street

New Orleans, LA 70174

,

' Louisiana Power and

'ght Company

'

ATTN: Tom Gerrets, QA Manager

142 Delaronde Street '

,

.

New Orleans, LA 70174

bec:

c/o DMB(IE01)

j

bec's distributed by RIV:

'

Resident Inspector-

'

Section Chief-(RPS-B)

Accompanying Personnel

J. T. Collins

R. L. Bangart

Info Systems

RPB1

RBP2

TPB

RIV File

  • LouisianaLDiv of Radiation Control-

- *

J

4

l

5

g

9.,

,.-,-i

- - , , - , , .

, . - -

w

9-

,aw-.4

y

-,

,--,-e-e,,,er-

1.

4

-c,-

wv--,

,c-

, ev

..mw -

,,,_,yye.

- <

v

-

---,e,

w