Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-81-017, Final Deficiency Rept Re HPCS Diesel Generator Air Start Motor & Piping Sys Not Protected by Relief Valves. Deficiency Not Reportable Because Failure of Air Starter Sys Represents Single Failure + (20:37:21, 20 December 2024)
- ML20030C396 + (20:37:24, 20 December 2024)
- GO2-81-203, Interim Deficiency Rept Re Quality Class I Hanger Details, Initially Reported on 810629.As-built Documents Are Being Completed on Sys Turnover Basis W/Completion Based on Final Sys Turnover.Final Rept by 811001 + (20:37:27, 20 December 2024)
- ML20030C394 + (20:37:29, 20 December 2024)
- ML20030C391 + (20:37:30, 20 December 2024)
- GO2-81-020, Interim Deficiency Rept Re Load Capacity Data Sheets, Initially Reported 810630.Stress Repts to Be Reviewed for Adequate Design.Next Rept by 810918 + (20:37:32, 20 December 2024)
- ML20030C389 + (20:37:34, 20 December 2024)
- ML20030C388 + (20:37:35, 20 December 2024)
- ML20030C387 + (20:37:36, 20 December 2024)
- ML20030C386 + (20:37:38, 20 December 2024)
- GO2-81-024, Interim Deficiency Rept Re Out of Calibr Torque Wrenches, Originally Reported on 801215.Checklist Is Being Inserted Into Work Packages & Completion of Packages Will Be Done on Sys Priority Basis.Final Rept by 811005 + (20:37:39, 20 December 2024)
- ML20030C384 + (20:37:42, 20 December 2024)
- ML20030C383 + (20:37:43, 20 December 2024)
- ML20030C382 + (20:37:45, 20 December 2024)
- ML20030C381 + (20:37:47, 20 December 2024)
- ML20030C380 + (20:37:48, 20 December 2024)
- ML20030C379 + (20:37:49, 20 December 2024)
- ML20030C378 + (20:37:50, 20 December 2024)
- ML20030C377 + (20:37:51, 20 December 2024)
- ML20030C375 + (20:37:53, 20 December 2024)
- ML20030C374 + (20:37:58, 20 December 2024)
- ML20030C373 + (20:37:59, 20 December 2024)
- ML20030C372 + (20:38:00, 20 December 2024)
- ML20030C371 + (20:38:02, 20 December 2024)
- ML20030C370 + (20:38:03, 20 December 2024)
- GO2-81-244, Updated Deficiency Rept Re Concrete & Grouting Work on Contract 215,initally Reported on 801114.Contractor Is Still Searching Records for Data on Grout in Question.Next Rept by 811023 + (20:38:04, 20 December 2024)
- W3P81-1835, Forwards Containment Purge & Vent Valve Operability Study, Per TMI Item II.E.4.2.Mods Being Made to Limit Valve Opening to 40 Degrees.Study Demonstrates Compliance W/Item II.E.4.2,Part 5 + (20:38:07, 20 December 2024)
- ML20030C367 + (20:38:09, 20 December 2024)
- ML20030C366 + (20:38:10, 20 December 2024)
- ML20030C365 + (20:38:12, 20 December 2024)
- ML20030C364 + (20:38:13, 20 December 2024)
- ML20030C363 + (20:38:14, 20 December 2024)
- AECM-81-308, Responds to Requests for Addl Info Re Instrumentation & Control Sys.Info Includes Discussion of IE Info Notice 79-22,IE Bulletin 79-27,FSAR Section 7.6 & TMI Items II.D.3, II.F.2,II.K.3.18 & II.K.3.21 + (20:38:15, 20 December 2024)
- ML20030C361 + (20:38:17, 20 December 2024)
- ML20030C360 + (20:38:19, 20 December 2024)
- TXX-3991, Forwards Upgraded Emergency Response Facilities Conceptual Design Description & Implementation Schedule Required by Generic Ltr 81-10,which Replaces Info in TMI Action Plan Response for Item III.A.1.2.NUREG-0696 Used for Guidance + (20:38:20, 20 December 2024)
- GO2-81-021, Interim Deficiency Rept Re Steel Design Details for Small Bore Design Work,Initially Reported on 810417.Evaluation of Basic Design Criteria Completed & Std Support Details Are Being Revised.Final Rept by 810921 + (20:38:22, 20 December 2024)
- ML20030C357 + (20:38:24, 20 December 2024)
- ML20030C356 + (20:38:25, 20 December 2024)
- ML20030C355 + (20:38:27, 20 December 2024)
- AECM-81-312, Forwards Proposed FSAR Changes & Additions,Response to Auxiliary Sys Branch Question 10.29 & Discussion of Perched Aquifer Recharging.Proposed FSAR Changes Will Be Incorporated in Next Available Amend + (20:38:28, 20 December 2024)
- ML20030C352 + (20:38:30, 20 December 2024)
- GO2-81-022, Interim Deficiency Rept Re Potentially Reportable Condition on Faz Logic Testability,Initially Reported 810708.Design Review Initiated.Next Rept by 811015 + (20:38:33, 20 December 2024)
- ML20030C349 + (20:38:36, 20 December 2024)
- ML20030C348 + (20:38:37, 20 December 2024)
- ML20030C347 + (20:38:38, 20 December 2024)
- ML20030C346 + (20:38:39, 20 December 2024)
- ML20030C345 + (20:38:40, 20 December 2024)
- ML20030C342 + (20:38:43, 20 December 2024)
- ML20030C341 + (20:38:43, 20 December 2024)
- ML20030C339 + (20:38:44, 20 December 2024)