gg -
50.55(e) Report Docket Nos. 50-460/513 Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashington Way Richland, Washington 99352 (509)372-5000 July 17, 1981 G0-1-81-209
,g7Q, fY, fr$.%-$
s Q JUL o,:T!l d
- e. % ! C; j'
- v Nuclear Regulatory Commisrion g
I8 Region V Suite 202 Walnut Creek Plaza
'>)
1990 'l. California Boulevard
/,/
Walnut Creek, California 94596 9
m n
- ~
i
,g@y,r Attention:
Mr. R. H. Faulkenberry
, c,
Chief, Reactor Construction gy 11 Projects Branch gj i
r kV,.
o.5-
"/
'x 5
Subject:
PROJECTS 1 AND 4
N/jj.. \\ \\
DOCKET NOS. 50-460 AND 50-513 j
POTENTIALLY REPORTABLE CONDITION 10CFR50.55(e)
BOSTR0M BERGEN METAL PRODUCTS WELDED ASSEMBLIES
Reference:
1)
Telecon TJ Houchins, Supply System to DF Kirsch, Region V Nuclear Regulatory Commission dated December 8, 1980 2)
G3-1-81-03, dated January 7, 1981, DW Mazur to RF Engelken, Director 3)
G0-1-81-167, dated June 9, 1981, DW Mazur to RH Faulkenberry, Chief, Reactor Construction reportable Jeficiency under 10CFR50.55(e) and references 2) potentially In reference 1) the Supply System informed your office of a and 3) were interim reports on the subject condition.
Our letter of June 9,1981 (reference 3 above) indicated that the test-ing program described in Attachment "A" of our January 7,1901 (reference 2 above) interim report, would be completed by mid June 1981, with a final report following by July 17, 1981. The testing has been completed by the testing laboratory and the test results have been transmitted to UE&C Engineering, Philadelphia for evaluati<.n; however, since the test-ing took longer than previously anticipated, a final engineering report will not be available until the end of July 1981. Therefore, this is an interim report with a final report to follow by August 14, 1981.
TO
s 1/0 S!ASPo88PoS$8$8 S
$l-kl
Mr. R. H. Faulkenberry GO.1-81-209 Bostrom Bergen Metal Products Page 2 If you have any question or desire further information, please advise.
Very truly yours,
. W.
Program Director WNP-1/4 DWM:MER:lm cc: