50.55(e) Report 9
g U
~/
Docket Nos. 50-460/513 ju P
W shingtOn Public Power Supply System A JOINT OPERATING AGENCY SS
- y. y,oi., 3 7 s soco o.oo...e 3000 c o w...
.o.
w.,
,<. o w...
ero~ m s2
,qs A'
),
An.
/
G 'n ' o, l8-b si c
&jq r
f 'k#fs
-- I fluclear Regulatory Commission June 9, 1981 b
M b
Y Region V G0-1-81-167
'T T^ s '
4 Suite 202 Walnut Creek Plaza 1990 fl. California Boulevard Walnut Creek, California 94596 Attention:
Mr. B. H. Faulkenberry Chief, Reactor Construction Projects Branch
Subject:
PROJECTS 1 AND 4 DOCKET fl0S. 50-460 Afl0 50-513 POTEllTIALLY REPORTABLE CONDITI0fl 10CFR50.55(e)
BOSTROM BERGEfi METAL PRODUCTS WELDED ASSEMBLIES
Reference:
1)
Telecon TJ Houchins, Supply System to DF Kirsch, Region V fluclear Regulatory Commission dated December 8, 1980 2)
G0-1-81-03, dated January 7, 1981, DW Mazur to RH Engelken, Director In reference 1) the Supply System informed your office of a potentially reportable deficiency under 10CFR50.55(e) and reference 2) was an in-terim report on the subject condition.
Attachment A to our interim response (reference 2 above) indicated that l
a schedule for final resolution could not be provided, but it was anti-I cipated that a final report should be completed by May 1,1981. Because of the complex configuration of the test specirrens, testing is taking i
longer than what was originally estimated.
Based on current information it is anticipated that the testing will be completed by mid June 1981, l
with a final test report by July 1,1981, therefore we should be able to l
transmit a final report to the Region V office by July 17, 1981.
3dD J
/f/
8108260052 810609
{DRADOCK 05000460 PDR 9HI
?
.t
( )
v lir. B. H. Faulkenberry Bostrom Bergen Metal Products Page 2 If you have any qunstions or desire further information please aavise.
Very truly yours,
^
M C/l D. W. f1 ur r' rogram Director WflP-1/4 Attachments DWM:MER:lm cc:
CR Bryant, Bonneville Power Administration /399 EW Edwards, Bechtel Power Corporation l
.