Interim Deficiency Rept Re Bostrom Bergen Metal Products Welded Assemblies,Initially Reported on 801208.Final Rept Cannot Be Completed by 810501 Due to Complex Configuration of Test Specimens,But Will Be Submitted by 810717
ML20030C386
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/09/1981
From: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, GO-1-81-167, NUDOCS 8108260052
Download: ML20030C386 (2)


Text

50.55(e) Report 9

g U

~/

Docket Nos. 50-460/513 ju P

W shingtOn Public Power Supply System A JOINT OPERATING AGENCY SS

y. y,oi., 3 7 s soco o.oo...e 3000 c o w...

.o.

w.,

,<. o w...

ero~ m s2

,qs A'

),

An.

/

G 'n ' o, l8-b si c

&jq r

f 'k#fs

-- I fluclear Regulatory Commission June 9, 1981 b

M b

Y Region V G0-1-81-167

'T T^ s '

4 Suite 202 Walnut Creek Plaza 1990 fl. California Boulevard Walnut Creek, California 94596 Attention:

Mr. B. H. Faulkenberry Chief, Reactor Construction Projects Branch

Subject:

PROJECTS 1 AND 4 DOCKET fl0S. 50-460 Afl0 50-513 POTEllTIALLY REPORTABLE CONDITI0fl 10CFR50.55(e)

BOSTROM BERGEfi METAL PRODUCTS WELDED ASSEMBLIES

Reference:

1)

Telecon TJ Houchins, Supply System to DF Kirsch, Region V fluclear Regulatory Commission dated December 8, 1980 2)

G0-1-81-03, dated January 7, 1981, DW Mazur to RH Engelken, Director In reference 1) the Supply System informed your office of a potentially reportable deficiency under 10CFR50.55(e) and reference 2) was an in-terim report on the subject condition.

Attachment A to our interim response (reference 2 above) indicated that l

a schedule for final resolution could not be provided, but it was anti-I cipated that a final report should be completed by May 1,1981. Because of the complex configuration of the test specirrens, testing is taking i

longer than what was originally estimated.

Based on current information it is anticipated that the testing will be completed by mid June 1981, l

with a final test report by July 1,1981, therefore we should be able to l

transmit a final report to the Region V office by July 17, 1981.

3dD J

/f/

8108260052 810609

{DRADOCK 05000460 PDR 9HI

?

.t

( )

v lir. B. H. Faulkenberry Bostrom Bergen Metal Products Page 2 If you have any qunstions or desire further information please aavise.

Very truly yours,

^

M C/l D. W. f1 ur r' rogram Director WflP-1/4 Attachments DWM:MER:lm cc:

CR Bryant, Bonneville Power Administration /399 EW Edwards, Bechtel Power Corporation l

.