ML20030C361

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Broken Fiber Contact Base on Armature of Relay in 4.16 Kv Switchgear,Initially Reported on 810521.Broken Contact Base Will Be Replaced & Other Equipment Will Be Inspected.Final Rept by 811015
ML20030C361
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/18/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-18238-BSK, NUDOCS 8108260021
Download: ML20030C361 (3)


Text

.......

4 r m 50.55(e) Report y f.. ~

t :

Docket Nos. 50-528/529/530 M

bb I

bb b J

P.O. BOX 21666 PHOENIX, ARI2ON A 85036

.,ane 18, 1981 ANPP-18238-BSK/ JAR U. S. Nuclear Regulatory Commission Region V M,,i ' 7,.

'O Walnut Creek Plaza - Suite 202 Y,.'

h,;, ' '

A 1990 North California Boulevard Walnut Creek, California 94596 Attention:

Mr. B. H. Faulkenberry, Chief b [,'p'"y.,l,

a Reactor Construction and D.

%J M Ji+7Y$yg,s '

Engineering Support Branch

Subject:

Interim Report A 50.55(e) Potentially Reportable Deficiency Relating to a Broken Fiber Contact Base on the Armature of a Relay in the 4.16 KV Switchgear File:

81-019-026 D.4.33.2

Reference:

Telephone Conversation between J. Eckhardt and B. S. Kaplan on May 21, 1981 (DER 81-11)

Dear Sir:

The NRC.i's notified of a potentially reportable deficiency in the referenced celephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty l

(30) days.

l Due to the extensive investigation and evaluation required, an interim report is attached.

It is now expected that this information will be finalized by October 15, 1981, at which time a complete report will be submitted.

Very trul yours,

{(. 7' -

ctu i n u t, 'N.

c E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:ske s c >g f~

Attachment g

f7 8108260021

%8 PDR ADOCK PDR

\\

Bl 'k-

N M

,~

/~

)

V U. S. Nuclear Regulatory Commission Region V Attention: fir.

B. H. Falkenberry, Chief ANPr-18238-BSK/ JAR June 18, 1981 Pege 2 cc:

Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 A. C. Gehr Snell & Wilmer R. L. Robb D. B. Fasnacht W. E. Ide J. M. Allen A. C. Rogers J. A. Brand W. H. Wilson W. G. Bingham W. J. Stubblefield R. L. Patterson R. W. Welcher D. R. Hawkinson

)

/

(v)

(v~,)

  • ,r INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT #1 I.

Potential Problem During preparation for a start-up bench test of a General Electric relay supplied as a component of the 4.16 KV switch-gear, it was found that the relay had been delivered to the jobsite with the fiber contact base on the armature broken.

The relay is located in cubicle E-PBB-504N of the subject equipment, and is an essential part of a safety-related system.

A definitive reason for the breakage has not been determined.

The system has not yet been activited for testing or service.

II.

Approach To and Status Of Proposed Resolution The broken contact base will be replaced. The other equipment which has been delivared to the jobsite will be inspected.

Bechtel has requested General Electric's assistance in reviewing and dispositioning this condition.

III.

Projected Completion of Corrective Action and Submittal Date of the Final Report The evaluation, resolution and final report are forecast to be completed by October 15, 1981.