ML20030C379
| ML20030C379 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 07/21/1981 |
| From: | Leddick R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| GO3-81-2262, IEB-79-02, IEB-79-2, NUDOCS 8108260045 | |
| Download: ML20030C379 (1) | |
Text
Docket No. 50-509,_50-509/79-02 gdiPug.
j>,
49 s
a*e* * *@
P Washington Public Power Supply System f(,n g
A JOINT OPERATING AGENCY
,S r,,
Q Y
'*/ b S
y S
l ' rgv.>
P O 80X 1223 ELMA. W ASHINGTON 98541 PHONE (206) 482-4428 Docket Nos. 50-508 and 50-509 Mr. R. H. Engleken July 21,1981 U. S. Nuclear Regulatory Commission G03-81-2262 Suite 202, Walnut Creek Plaza 1990 N. California Boulevard Walnut Creek, California 94596
Dear Mr. Engleken:
Subject:
PROJECT NOS. 3 AND 5 IE BULLETT: NO. 79-02, REVISION N0. 2
" PIPE SUPPCRT BASE PLATE DESIGNS USING CONCPETE EXPANSION ANCHCR BOLTS" Reference
- 1) Letter, D. L. Renberger to R. H. Engleken, same subject, dated May 14,1981, G03-81 -1069.
The referenced letter advised the NRC that the Supply System was conducting an assessment of concrete expansion anstor utilization on the UNP-3/5 Projects.
The results of that survey, which were expected by mid-July, are now being compiled.
Present indications confirm f.h.it where expansion anchor instal-lations are utilized, the criteria containej in IE Bulletin 79-02 are satisfied.
The complete assessment of expi.nsion anchor utilization is now expected to be complete by August 31, 1981, at which the NRC will be advised of the res ul ts.
Very truly yours, R. S. Leddick Program Director, WNP-3/5 cc:
D. Smithpeter (BPA)
J. A. Adams (PPL)
I!6 3/5 Files, Richland
.'W
/
x f~
4.N
-?
\\
N b
%e h
scal
~%s 2,
r s
hp,$
,lO 2
U
'9 a
8108260045 810721
\\ q, 3
PDR ADOCK 05000508 G
PDR sl-OL