50.55(e) Report Docket Nos. 50-528/529/530 3
w Y,
- -. =.
A33EFN1A EFEMEC SWJN78Kai @@T2TfdiiSM t-og P. O. BO X 216 6 6 PHOENIX, ARl2ON A 85034 g
August 11, 1981 E,
!?
U. S. Nuclear Regulatory Commission Region V
\\
II/g(C)
Walnut Creek Plaza - Suite 202 Sk 1990 North California Boulevard
/
[S [
i M P'Q-Walnut Creek, California 94596
--p ([d'" "!) 1c)
Attention:
Mr. B. H. Faulkenberry, Chief
~
.O Reactor Construction and Engineering Support Branch
- j. u.5 I N
I D
b;'
'N/
Subject:
Interim Report - DER 81-22 A 50.55(e) Potentially Reportable Deficiency tLihgI.h' to a Premature Time-Out Condition with Agastat PnetimaEic Timing Relays Date Coded 7740 through 7840 File: 81-019-026 D.4.33.2
Reference:
Telephone Conversation between J. Eckhardt and J. E. Cook on July 15, 1981
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by October 30, 1981, at which time a complete report will be submitted.
Very truly youra, C.C.b :
E. E. Van Brunt, Jr.
APS Vice President Nuclear ?rojects ANPP Project Director EEVBJr/GHD:ske g f/
I Attachment
,b B108260036 810011" gDRADOCK 05000528 SH%
4 U. S. Nuclear Regulatory Cona16; ion Attention:
Mr. B. H. Faulkenberry, Chief ANPP-?.8632-GHD/BSK Augur,t 11, 1981 Page 2 cc:
Victor Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 A. C. Gehr Snell & Wilmer D. B. Fasnacht W. E. Ide B. S. Kaplan A. C. Rogers J. M. Allen J. A. Brand W. H. Wilson W. G. Bingham W. J. Stubblefield R. L. Patterson R. W. Welcher D. R. Hawkinscn Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 i
l i
i 1
1
(
l 1
1
~.
A s
INTEREH REPORT - DER 81-22 POTENTIAL REPORTABLE DEFICIENCY ART'ONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 1 AND 2 4
I.
Por-. 1 Problem I
Amerace Corporation has identified a premature time-out condition with Agastat Model 7012D Pneumatic Timing Relays date coded 7740 through 7840. Bechtel's Supplier Quality Information Bulletin (SQIB) 80-5, Revision 1, includes all Model 7000 Series Timers in their surveillance inspection effort. PVNGS jobsite quality assurance conducted a surveillance of Units 1 and 2 Diesel Generator Control l
Panels 1-J-DGA<B01, 1-J-DGB-B01, 2-J-DGA-B01 and 2-J-DGB-B01.
A total of nineteen (19) timing relays with the suspect date codes were recorded. These include Models 7012 and 7022.
Additional surveillance activity so far has indicated this problem is limited to the equipment supplied by Cooper Energy Services as part of the Diesel Generator Purchase Order 13-MH-l 018.
l l
II.
Approach To and Status Of Proposed Resolution Bechtel has corresponded with Cooper Energy Services regarding these conditions, but has not yet received their evaluation and corrective action plan.
III.
Projected Completion of Corrective Action and Submittal of the Final Report i
The evaluation, resolution and final report are forecast to be completed by October 30, 1981.