Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031D112 + (18:58:51, 20 December 2024)
- ML20031D110 + (18:58:54, 20 December 2024)
- ML20031D106 + (18:58:56, 20 December 2024)
- 05000327/LER-1981-114-03, /03L-0:on 810905,20 & 23,auxiliary Bldg Ventilation Radiation Monitor Declared Inoperable Due to High Radiation Alarm Initiating Ventilation Isolation.Caused by Incorrect hi-rad Relay in Analyzer Module + (18:59:01, 20 December 2024)
- ML20031D100 + (18:59:02, 20 December 2024)
- ML20031D098 + (18:59:04, 20 December 2024)
- ML20031D097 + (18:59:05, 20 December 2024)
- ML20031D096 + (18:59:06, 20 December 2024)
- ML20031D095 + (18:59:07, 20 December 2024)
- ML20031D094 + (18:59:08, 20 December 2024)
- ML20031D093 + (18:59:09, 20 December 2024)
- ML20031D089 + (18:59:10, 20 December 2024)
- ML20031D087 + (18:59:11, 20 December 2024)
- 05000327/LER-1981-114, Forwards LER 81-114/03L-0 + (18:59:13, 20 December 2024)
- ML20031D084 + (18:59:14, 20 December 2024)
- ML20031D080 + (18:59:20, 20 December 2024)
- ML20031D079 + (18:59:24, 20 December 2024)
- ML20031D077 + (18:59:25, 20 December 2024)
- ML20031D074 + (18:59:26, 20 December 2024)
- ML20031D072 + (18:59:27, 20 December 2024)
- ML20031D071 + (18:59:34, 20 December 2024)
- ML20031D067 + (18:59:40, 20 December 2024)
- 05000324/LER-1981-091-03, /03L-0:on 810902,RHR Relay Logic Power Failure Occurred,Making LPCI Function of RHR Subsystem a Inoperable. Caused by Blown F1A Power Fuse Due to Improper Sealing of Electrical Leads Penetration Following Maint + (18:59:46, 20 December 2024)
- ML20031D065 + (18:59:47, 20 December 2024)
- ML20031D064 + (18:59:48, 20 December 2024)
- ML20031D063 + (18:59:50, 20 December 2024)
- 05000461/LER-2019-004-01, Safety Relief Valve Wiring Issue Results in Condition Prohibited by Technical Specifications + (18:59:52, 20 December 2024)
- ML20031D056 + (18:59:55, 20 December 2024)
- ML20031D053 + (18:59:56, 20 December 2024)
- ML20031D055 + (18:59:56, 20 December 2024)
- ML20031D050 + (18:59:57, 20 December 2024)
- ML20031D049 + (18:59:59, 20 December 2024)
- ML20031D046 + (19:00:02, 20 December 2024)
- ML20031D045 + (19:00:02, 20 December 2024)
- ML20031D044 + (19:00:03, 20 December 2024)
- 05000328/LER-1981-116-03, /03L-0:on 810905,containment Sump Level Transmitter Declared Inoperable Due to Spurious High Readings.Caused by Leak in Fill Seal Valve at Transmitter End of Sense Line.Line Drained & Refilled + (19:00:04, 20 December 2024)
- ML20031D041 + (19:00:06, 20 December 2024)
- 05000324/LER-1981-091, Forwards LER 81-091/03L-0 + (19:00:07, 20 December 2024)
- ML20031D038 + (19:00:08, 20 December 2024)
- 05000317/LER-1981-068-03, /03L-0:on 810830,shut Letdown Isolation Valve 1-CV-515 Found to Have Leakage Rate Exceeding Tech Specs. Caused by Solenoid Valve 1-SV-515 Leaking Through Vent Port, Preventing Actuator Pressure to Seat Valve.Valve Replaced + (19:00:09, 20 December 2024)
- ML20031D035 + (19:00:10, 20 December 2024)
- ML20031D034 + (19:00:12, 20 December 2024)
- ML20031D033 + (19:00:12, 20 December 2024)
- ML20031D032 + (19:00:13, 20 December 2024)
- 05000328/LER-1981-116, Forwards LER 81-116/03L-0 + (19:00:15, 20 December 2024)
- ML20031D027 + (19:00:18, 20 December 2024)
- ML20031D026 + (19:00:19, 20 December 2024)
- ML20031D025 + (19:00:20, 20 December 2024)
- 05000317/LER-1981-068, Forwards LER 81-068/03L-0 + (19:00:21, 20 December 2024)
- ML20031D021 + (19:00:22, 20 December 2024)
- PNO-I-81-110, on 810925,Number 31 Steam Generator Insp Initiated After Tube Leak Was Discovered.Insp Identified Nine Defective Tubes,Including One Leaker Requiring Plugging.Press Release Re Extended Outage Issued by Util + (19:00:24, 20 December 2024)