ML20031D074

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1100/81-08 on 810825-28.No Noncompliance Noted
ML20031D074
Person / Time
Site: 07001100
Issue date: 09/22/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lichtenberger
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20031D075 List:
References
NUDOCS 8110090259
Download: ML20031D074 (2)


Text

f f

r.,

SEP 2 2 M Docket No. 70-1100

' h,

[' J -

k Combustion Engineering, Inc.

M ATTN: Mr. H. V. Lichtenberger Vice President - Nuclear Fuel E

OCT 8 1981-Ti Nuclear Power Systems - Manufacturing P. O. Box 500 c== * =

J y

Windsor, Connecticut 06095 e

ct Gentlemen:

u / (q \\D

Subject:

Inspection 70-1100/81-08 This refers to the routine safety inspection conducted by Mr. J. Roth of this office on August 25-28, 1981, of activities authorized by NRC License No.

SNM-1067 and to the discussions of our findings held by Mr. Roth with yourself and Mr. Johnstone of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were :bserved.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

Consistent with section 2.790(b)(i), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document

" f O"7 RI:FFPS RI:FFPS RI:P 8 {mjd C

r Kei ig

/g/81 9 # /81

/l$/81

/

elPD',

0FFICIAL RECORD COPY

t3c4, oakt K, 6 MI W MToEI'j,k C

SEP 2 ? i981 Combustion Engineering, Inc.

2 Room. The telephone notification of your intent to request withholding, or any request for an extension of the 10 day period which you believe necessary, should be made to the Supervisor, Files, Nil and Records, USNRC Region I, at (215) 337-5223.

No reply to this letter is required; however, should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, original sigued B :

/ fjwc R.R.Keimig,Chiefy Projects Branch #2, Division of Resident and Project Inspection

Enclosure:

Office of Inspection and Enforcement Inspection Report Numbe-70-1100/81-08 cc w/ encl:

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) t State of Connecticut bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encl)

I 0FFICIAL RECORD COPY