Responds to NRC Re Violations Noted in IE Insp Repts 50-352/81-11 & 50-353/81-09.Corrective Actions: Training Session Given on 810813 to Contractor QC Receipt Insp Personnel Re Pipe Spool Spec & Drawing Requirements
ML20031D027
Person / Time
Site: Limerick  
Issue date: 09/25/1981
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Haynes J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20031D014 List:
References
NUDOCS 8110090222
Download: ML20031D027 (3)


Text

- -

5, PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 1881 -1981 PHILADELPHI A. PA.19101

(

SEP 251981

<2isi e4i.4 so2

,o-s ome VICE PH ESt0ENT E N(.thE E Nf MG AN D N E SE A g.C N Mr. Ronald C.

Haynes United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 9

631 Park Avenue j

King of Prussia, PA 19406 I

I

Subject:

USNRC IE Region Letter dated August 27, 1981 RE: Site Inspection of July 1-24, 1981 l

l Inspection Report Nos. 50-352/81-11 & 50-353/81-09 j

Limerick Generating Station - Units 1 and 2 s

File:

QUAL-1-2-2 (352/81-11 & 353/81-09) f l

Dear Mr. Haynes:

In response to the subject letter regarding items identified f

during the subject inspection of construction activities authorized I

by NRC License Nos. CPPR-106 and -107, we transmit herewith the following:

i Attachment I - Response to Appendix A Also enclosed as required by the Notice of Violation, is an affidavit relating to the response.

Should you have any questior.s concerning these items, we would be pleased to discuss them with you.

Sincerely, YE f

JPF/gra j

Attachment Copy to:

Director of Inspection and Enforcement i

United States Nuclear Regulatory Commission i

ashington, D.C.

20555

}

J.

P.

Durr, USNRC Resident Inspector i

k l

8110090222 810730 gDRADOCK 05000352 PDR

~~ __._ _ _ _ _.

, ". ~ ('

ATTACHMENT 1 RESPONSE TO APPENDIX A Violation 10CFR50, Appendix B,

Criterion IX, states in part, that:

" Measures shall be established to assure that... welding... (is) controlled and accomplished...in accordance with applicable codes, standards, specifications, criteria, and other special requirements."

The Limerick PSAR, Appendix D, paragraph D.4.3,

" Control of Special l

Processes, Tests and Inspections", states, in part, that:

"The vendor shall operate under a controlled manufacturing system and 3

shall have written procedures or instructions for control of...

I welding..."

l l

The pipe drawing DBB-203-1, Revision 3, Note 4.B, states " Grind ID of buttweld flush (where accessible) and OD per detuil

'D'."

Contrary to the above, on July 14, 1981, vendor shop weld No.

3, on pipe spool DBB-203-1, was not ground flush on the inside diameter.

l Response to Violation NCR 4923 was issued to document the nonconforming ceadition on pipe spool DBB-203-1.

The nonconforming condition was reworked and reinspected in accordance with approved procedures.

The NCR was closed on September 4, 1981.

i A review of all pipe spools subject to PSI /ISI requirements that have been receipt inspected but not installed (130 pipe spools) was performed by the Concractor for identification of similar conditions.

NCR 4971 was issued to document the nonconforming conditions identified during this review.

Actions to resolve this NCR will be completed by November 2, 1981.

Similar conditions that i

exist in pipe spools already installed are being documented as ID reflectors as a result of pre-service ultrasonic inspections now in progress.

Actions Taken to Prevent Recurrence Were:

1.

A training session was given to the Contractor Quality Control Receipt Inspectic" personnel on August 13, 1981 regarding pipe spool specification and drawing requirements.

2.

A letter was sent to the responsible vendor on September 18, 1981, informing him of the nonconforming shop welds and reminded him that specification requirements must be adhered to and requested closer inspection of completed pipe spools.

I 1/1 50-352/81-11 50-353/81-09

i n'

COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF PHILADELPHIA J 0llN S.

KEMPER, being first duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric Company, the holder of Construction Permits CPPR-106 and CPPR-107 for Limerick Generating Station Units 1 and 2; that he has read the foregoing Response to Inspection Report Nos.

50-352/81-11 and 50-353/81-09 and knows the contents thereof; and that the statements and mat ~ers set forth therein are true and correct to the best of his knowledge, information and belief.