e-TENNESSEE ALLEY ALITHORITY CH ATTANOOGA. TENNESSEE 374of 400 Chestnut Street Tower II i
October 2, 1981 BLED-50-439/81-28 fb$1 i
-9 (L t.b ~'
OL Mr. a.mme P. O'Reilly, Director
- /
Office or Inspection and Enforoement.
007 8 1981 y
U.S. Nuclear Regulatory t'* maion Regica II - Suite 3100 ccmaisses y'N p
101 Marietta Street Y'["-
Atlanta, Georgia 30303'
) Ql'
/
Dear Mr. O'Reilly:
BELLEFWTE NUCLEAR PLANT UNIT 2 - Q)RROSION & DIESEL GENERATOR CONTROL PANEL - BLED-50-439/81 THIRD INTERIN REPORT The subject deficiency was initially reported to NRC-0IE Inspector J. Crlenjalt on March 20, 1981, in accordance with 10 TR 50.55(e) as NCR 1380. This was followed by our interim reporta dated April 20 and-June 25, 1981. Enclosed la our third interim report. We expect to submit our next. A-4 by December 21,. 1981.
If you.have any questions concerning this matteer please get in touch with D. L. Lambert at FTS 857-2581.
Very truly yours, TENNESSEE VALLET AUTHORITT Mp 3 M s
A I ty.
s.
1,. M. Mills, Manager Nuclear Regulation and Safety 2nolosure 00:
Mr. Victor Stallo, Jr., Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Coimaission Washington,.DC ':20555 t
8110090295 811002 DR ADOCK 05000439 PDR
.-c
?'
o e
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNIT 2 CORROSION OF DIESEL GENERATOR CONTROL PANEL BLRD-50-439/81-28 THIRD INi 3 IM EEPORT Description of Deficiency One of tlie Bellefonte diesel generator s. control panels. was. improperly r
stored. onsite. by TVA.. As a result, the ferrous mataI parts of the subcoaponent voltage regulatiort panel have rnetdized-to the extent that the component. is not capable of performing the functiotr for which. it was intended' In addition,, corroaf nn: of' other components irr the control panel,.
plates,. nuts,. and bolts,. etc.,. of the diesel hava rendered' it inoparabla in its present condition
~
Interin Progress TYK has deterwirrid' thatr the diesel's damaged. voltage regulation panel mist be repairect and recalibrated. by-the vendor (Tracsamerica Delstral). TVA has contacted-the vendor,. and. ther vendor has agrext. to perform the repairs.
The-diesel"s damaged: voltage regulation. panel, which was reteored from control panel 2RT-ELCE-2-B,. was shipped' to the vendor for repair orr June 15,,1198T This panel is still at the vendoe and-the site has not r
received' any iMia= tion as to as possible date of return. The mining refurbishing:-car control paner 2RT<.ELCF-2-B' is ire process in accordance witir woric release Nb 23,447 ed O
O O
g e-i a
4 g
w-
-