Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032C606 + (16:39:56, 20 December 2024)
- ML20032C605 + (16:39:57, 20 December 2024)
- ML20032C603 + (16:39:58, 20 December 2024)
- ML20032C602 + (16:39:59, 20 December 2024)
- ML20032C601 + (16:40:00, 20 December 2024)
- ML20032C596 + (16:40:06, 20 December 2024)
- ML20032C595 + (16:40:08, 20 December 2024)
- ML20032C594 + (16:40:09, 20 December 2024)
- FVY-81-151, Forwards Addl Info Re Retran Analysis for Cycle 9 Reload Calculations.Retran Output Listing Withheld (Ref 10CFR2.790).Affidavit Encl + (16:40:15, 20 December 2024)
- ML20032C590 + (16:40:29, 20 December 2024)
- ML20032C589 + (16:40:31, 20 December 2024)
- ML20032C587 + (16:40:32, 20 December 2024)
- 05000348/LER-1981-069-03, /03L-0:on 810929,charging Pump 1B Determined Electronically Aligned to Bus W/No Available Emergency Power Supply & Declared Inoperable.Caused by Personnel Error When Pump Aligned to Wrong Train.Personnel Trained + (16:40:33, 20 December 2024)
- ML20032C585 + (16:40:35, 20 December 2024)
- ML20032C584 + (16:40:35, 20 December 2024)
- ML20032C583 + (16:40:37, 20 December 2024)
- ML20032C581 + (16:40:38, 20 December 2024)
- ML20032C579 + (16:40:40, 20 December 2024)
- 05000339/LER-1981-075-03, /03L-0:on 811003,during Hot Standby,Containment Isolation Trip Valve Failed to Close Upon Receipt of Phase a Containment Isolation Signal.Cause Unknown.Valve Cycled Properly & Penetration Returned to Normal + (16:40:42, 20 December 2024)
- 05000339/LER-1981-075, Forwards LER 81-075/03L-0 + (16:40:45, 20 December 2024)
- ML20032C574 + (16:40:46, 20 December 2024)
- ML20032C573 + (16:40:53, 20 December 2024)
- 05000339/LER-1981-074-03, /03L-0:on 811004,during Mode 2,12-h Surveillance Procedure Radiation Monitoring Equipment Check Not Performed within Required Interval.Caused by Personnel Error Due to Heavy Work Load from Safety Injection on Previous Shift + (16:40:55, 20 December 2024)
- ML20032C571 + (16:40:58, 20 December 2024)
- ML20032C570 + (16:41:01, 20 December 2024)
- 05000339/LER-1981-074, Forwards LER 81-074/03L-0 + (16:41:03, 20 December 2024)
- 05000339/LER-1981-076-99, /99L-0:on 811003,safety Injection & Reactor Trip Occurred Due to Inadvertent Opening of Steam Dump Valves. Safety Injection Caused by Hi Steam Flow & Lo Lotemp Average Due to Steam Header Pressure Controller High Signal + (16:41:05, 20 December 2024)
- ML20032C566 + (16:41:09, 20 December 2024)
- 05000339/LER-1981-076, Forwards LER 81-076/99L-0 + (16:41:11, 20 December 2024)
- 05000244/LER-1981-015-01, During Containment Atmosphere Sampling & Analysis,Nonautomatic Primary Containment Isolation Valve Opened.Caused by Procedure Inadequacy.Procedure PC-23.2 Revised + (16:41:13, 20 December 2024)
- ML20032C561 + (16:41:15, 20 December 2024)
- ML20032C559 + (16:41:20, 20 December 2024)
- ML20032C557 + (16:41:21, 20 December 2024)
- 05000244/LER-1981-015, Forwards Updated LER 81-015/01X-1 + (16:41:22, 20 December 2024)
- ML20032C554 + (16:41:24, 20 December 2024)
- ML20032C552 + (16:41:25, 20 December 2024)
- ML20032C551 + (16:41:26, 20 December 2024)
- ML20032C550 + (16:41:27, 20 December 2024)
- ML20032C548 + (16:41:28, 20 December 2024)
- ML20032C547 + (16:41:29, 20 December 2024)
- ML20032C546 + (16:41:30, 20 December 2024)
- ML20032C545 + (16:41:31, 20 December 2024)
- ML20032C544 + (16:41:32, 20 December 2024)
- ML20032C543 + (16:41:33, 20 December 2024)
- ML20032C542 + (16:41:34, 20 December 2024)
- ML20032C541 + (16:41:36, 20 December 2024)
- ML20032C540 + (16:41:37, 20 December 2024)
- ML20032C539 + (16:41:38, 20 December 2024)
- ML20032C537 + (16:41:39, 20 December 2024)
- ML20032C536 + (16:41:40, 20 December 2024)
- ML20032C535 + (16:41:42, 20 December 2024)