ML20032C537

From kanterella
Jump to navigation Jump to search
Application to Amend Provisional License DPR-45,changing Tech Spec Sections 5.2.1.2(d) & 5.2.1.3(d) for Type B & C Leakage Rate Testing.Class II Amend Fee Encl
ML20032C537
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/26/1981
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML20032C538 List:
References
LAC-7896, NUDOCS 8111100551
Download: ML20032C537 (2)


Text

.

~

d D DA/RYLAND h

[k COOPERAT/VE

  • PO BOX 817
  • 2615 EAST AV SOUTH
  • LA CROSSE. WISCONSIN 54601 (608) 788 4 000 October 26, 1981 4

In reply, please refer to LAC '7896 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation O

g ATTN:

Mr. Dennis M. Crutchfield 8

F } f *

) Tfl Operating Reactors Branch #5 3

Division of Operating Reactors E

}"g TL-U. S. Nuclear Regulatory Commission

-s t

g id NOVO 9 B81"" L '

Washington, D. C.

20555

"# gjcttAt IIO&

cc#*"

30 '

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

V

,Nj PROVISIONAL OPERATING LICENSE NO. DPR-45 42 N.Si APPLICATION FOR AMENDMENT TO LICENSE I

References:

(1) 10CFR50, Section 50.90 (2)

LACBWR Technical Specifications (3) 10CFR50, Appendix J l

(4) 10CFR170, Section 170.22 Gentlemen:

In accordance with the provisions of Reference (1), an application to amend Provisional Operating License No. DPR-45 for the La Crosse Boiling Water Reactor is hereby filed with three (3) signed original applications, together with thirty-seven (37) copies.

The license change requested would modify the testing frequency specified in LACBWR Technical Specifications Sections 5.2.1.2(d) and

5. 2.1. 3 (d) for Type B and C leakage rate testing.

Granting of the requested change would result in greater correlation between LACBWR Technical Specifications and 10CFR50, Appendix J.

Appendix J requires the testing frequency of Type B tests, except for airlocks, "be per-formed during reactor shutdown for refueling or other convenient intervals, but in no case at intervals greater than 2 years", and the Type C tests "shall be performed during each reactor shutdown tor refueling but in no case at intervals greater than 2 years".

1 1

It is our desire to comply in these aspects with the requirements of 10CFR50, Appendix J, as much as praticable, and therefore this submittal requests the testing frequency for Type B and C tests be changed from the present wording to the frequency specified in Appendix J, Sections III.D.2(a) and III.D.3.

Prompt action on this request will be greatly appreciated.

k O

01111005518b b' \\

9 PDR ADOCK 0 PDR P

Mr. Dennis M. Crutchfield LAC-7896 Operating Reactors Branch #5 October 26, 1981 Please find attached to this letter proposed revised pages to the LACBWR Technical Specifications.

This change has been determined to be a Class Il Amendment as defined in Reference (4), since it is deemed to involve a pro-forma consideration for compliance with an existing rule, and a check for

$1,200.00 will follow in a few days.

The information submitted in this application for license amendment has been reviewed by the LACBWR Committees as prescribed in Tech-nical Specifications.

If there are any questions concerning this submittal, please contact us.

Very truly yours, DAIRYLAND POWSK COOPERATIVE 75

/,

b 3

Frank Linder, General Manager FL:LWK:af

Enclosure:

Proposed Revised Technical Specifications cc:

J. G.

Keppler, Dir., NRC-DRO III NRC Resident Inspector STATE OF WISCONSIN )

)

COUNTY OF LA CROSSE)

Personally came before me this 6 23 day of November, 1981, the above named Frank Linder, to me known to be the person who executed the foregoing instrument and acknowledged the same.

m

,?pn /

L i

Notary Public,pLa Crosse County, Wisconsin.

My Commission Expires 2/26/84.