Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309G790 + (07:26:52, 2 January 2025)
- ML19309G789 + (07:26:53, 2 January 2025)
- ML19309G787 + (07:26:53, 2 January 2025)
- ML19309G786 + (07:26:54, 2 January 2025)
- ML19309G784 + (07:26:55, 2 January 2025)
- ML19309G783 + (07:26:56, 2 January 2025)
- ML19309G782 + (07:26:57, 2 January 2025)
- ML19309G780 + (07:26:58, 2 January 2025)
- ML19309G777 + (07:26:59, 2 January 2025)
- ML19309G779 + (07:26:59, 2 January 2025)
- ML19309G776 + (07:27:00, 2 January 2025)
- ML19309G774 + (07:27:01, 2 January 2025)
- ML19309G773 + (07:27:01, 2 January 2025)
- ML19309G772 + (07:27:04, 2 January 2025)
- ML19309G770 + (07:27:05, 2 January 2025)
- ML19309G771 + (07:27:05, 2 January 2025)
- ML19309G769 + (07:27:06, 2 January 2025)
- ML19309G767 + (07:27:06, 2 January 2025)
- ML19309G765 + (07:27:07, 2 January 2025)
- ML19309G766 + (07:27:07, 2 January 2025)
- ML19309G763 + (07:27:08, 2 January 2025)
- ML19309G764 + (07:27:08, 2 January 2025)
- ML19309G761 + (07:27:09, 2 January 2025)
- 05000259/LER-1980-037-03, /03L-0:on 800402,w/unit at Steady Power of 34%, Reactor Core Isolation Cooling Turbine Tripped Due to High Rupture Disc Pressure.Caused by Failure of Teflon Sheet Portion of Disc.Rupture Disc Replaced + (07:27:10, 2 January 2025)
- 05000259/LER-1980-037, Forwards LER 80-037/03L-0 + (07:27:12, 2 January 2025)
- ML19309G757 + (07:27:13, 2 January 2025)
- 05000327/LER-1980-023-03, /03L-0:on 800402,during Surveillance Testing, Diesel Generator 2A-A Feedbreaker Failed to Close.Caused by Power Contacts Being Dirty.Power Contacts Cleaned + (07:27:14, 2 January 2025)
- ML19309G755 + (07:27:15, 2 January 2025)
- ML19309G754 + (07:27:16, 2 January 2025)
- 05000327/LER-1980-023, Forwards LER 80-023/03L-0 + (07:27:17, 2 January 2025)
- 05000259/LER-1980-028-03, /03L-0:on 800403,while Performing Procedure RTI-5 & After Exceeding 40% Power,Discovered That Reactor Pressure During Scram Timing Tests Had Been 950 Psia Rather than Required 950 Psig.Caused by Personnel Error + (07:27:19, 2 January 2025)
- ML19309G750 + (07:27:20, 2 January 2025)
- 05000259/LER-1980-028, Forwards LER 80-028/03L-0 + (07:27:21, 2 January 2025)
- ML19309G747 + (07:27:22, 2 January 2025)
- ML19309G746 + (07:27:23, 2 January 2025)
- ML19309G745 + (07:27:23, 2 January 2025)
- ML19309G744 + (07:27:24, 2 January 2025)
- ML19309G742 + (07:27:25, 2 January 2025)
- ML19309G743 + (07:27:25, 2 January 2025)
- ML19309G740 + (07:27:26, 2 January 2025)
- ML19309G738 + (07:27:27, 2 January 2025)
- ML19309G736 + (07:27:28, 2 January 2025)
- ML19309G737 + (07:27:28, 2 January 2025)
- ML19309G735 + (07:27:29, 2 January 2025)
- ML19309G734 + (07:27:29, 2 January 2025)
- ML19309G732 + (07:27:30, 2 January 2025)
- ML19309G733 + (07:27:30, 2 January 2025)
- 05000312/LER-1980-024-03, /03L-0:on 800409,during Performance Test,A Generator Failed to Meet Time Criteria to Reach Full Voltage.Caused by Uncoupled Governor Accumulator Booster Pump.New Coupling Fabricated & Installed + (07:27:32, 2 January 2025)
- ML19309G730 + (07:27:33, 2 January 2025)
- ML19309G729 + (07:27:33, 2 January 2025)
- TAC:42054 + (07:27:34, 2 January 2025)