Forwards Addl Info Requested by NRC on 800310 to Complete Evaluation of Mgt & Technical Resources
ML19309G770
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 04/28/1980
From: Widner W
GEORGIA POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8005070546
Download: ML19309G770 (8)


Text

_ _ _ _ _ _ _ _ _ _

Gecria Pcwer Comcany m e m,ee s"

O 800

%s: cue e,4s45 807o$g a

c'a. Gw;a 30302 TeNerona 404 522 6060 7

m Power Generation Department Georgia Power tv" u>utrern eecinc system S0-33-/

April 28, 1980 Mh W/

'tw Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Georgia ower Company received a request on March 10, 1980, for additional information which the NRC required to complete their evalu-ation of our management and technical resources. The requested infor-nation will be found in the enclosures to this letter.

A copy of this letter and enclosures has also been sent to Glenn Podonsky, Teknekron Research, Inc.

{

Sincerely yours,

}//' Y. h O'

W. A. Widner l

Vice President and General Manager Nuclear Generation i

DLT/mb

Enclosures:

Information Required to Review Corporate Capabilities xc: Ruble A. Thomas George F. Trowbridge, Esquire R. F. Rogers, III Glenn Podonsky

(

i

(

o TABLE 1 Indicate whether your onsite short-term management meets each qualification listed below.

(Short-term is defined as from time of accident until one hour following it.)

Asst.

Plant Plant All ON-SITE SHORT TERM MANAGEMENT Manager Manager Shift Supervisors and Foreman BS e

B.S. in Engineering BME Physics 14

,B e

2 yrs of operating experience 5 yrs.

5 yrs.

2-at a nuclear power plant School 2 - 10 yrs.

e 1 yr experience at the specific 9 yrs.

9 yrs.

4 - 10 yrs.

plant e

An NRC Senior Operator's yes yes yes License e

4 yrs supervisory experience 11 yrs. 5 yrs.

b - 10 yrs.

r

g TABLE 2

~'

State whether your current plant etaff includes at least one individual with the qualifications listed for each position or area of expertise.

Pcsitior/ Area of Excertise GPC Resources Reactor Engineer

- 3.5. in Engineering or Science BSNE

- Minimum of 5 years total exoerience 4 yrs.

- Minimum 1 year nuclear operations (including 5 4 yrs.

mon:ns.nsite)

- Six mon:ns reactor transien analysis No

. Simulator training Yes Thermal Hycraulics Soecialist

- 3.5. in Engineering or Science BSME/MNE

- Minimum of 5 years total excerience 5 yrs.

- Minimum i vear nuclear operations (includino o months ensite) 5 yrs.

- Six months of hydraulics transi.ent analysis No

- Simulator training No Instruments: ion and Contr:1 Engineer

- 3.5. in Engineering or Science BEE

- Minimum of 5 years total experience 7 yrs.

. Minimum 1 year nuclear ocerations (including o m:n:ns onsize) 6 yrs.

- Simula:ce trainin:

No Cnemistry anc kac1 cnem1s ry

- 3.5. in Engineering or Science BCE

- Minimum of 5 years Octal excerience 30 yrs.

- Minimum of 1 year nuclear operations (including 6 yrs.

5 man ns onsite)

- Simuit:cr training No

TABLE 2 (Continued)

Position / Area of Expertise GPC Resources Racia-icn Protection Specialis:

- Associate degree or equivalen:

2 yrs.

- Minimum of 3 years total experience 13 yrs.

- Mini.wm of 1 year nuclear operaticns 6 yrs.

- Simulater training No Mecnanical Engineering BSME/MNE

- 3.5. in :..ngineering

- Minimum of 5 years to al excerience 5 yrs.

- 1 year in operations 5 yrs.

- 6 men-hs in hydraulic transient design No

-.Simula:cr training No Overall Plan: Design and Engineering

- 3.5. in Scienca or Engineering BSNE/BSEE

- Minimum of 10 years total experienca Sh yrs.

- 5 years of operations 5 yrs.

- Simula:cr training Yes Plan or Uni: Manager

- 5.5. in Engineering or Science BME

- Mini =um of 10 years total excerience 20 yrs.

- Minimum of 3 years in a key pcsition in nuclear 9 yrs.

operating plan:

- Minimum of a years supervising experience 11 yrs.

- Qualify fer, hold,or held RO or SRO Yes Ocera: ions Manager

- 3.5. in Engineering or Science H.S.D.

- Minimum of 3 years :ctal excerience 15 yrs.

- Minimum of 3 years nuclear coerating plan-6 yrs.

- Two yecrs in a sucervising role 6 yrs.

- Hold an SRO license Yes Tecnnical Manager

- 3.5. in Engineering or Science BSNE/BSEE

- Minimum of 3 years total experience Sh yrs.

- Minimum cf 3 years nuclear ocerating plan:

Sh yrs.

- Two year in a supervisory rols 2 yrs.

TABLE 3 State whether your present offsite staff includes at least one individual with the listed qualifications for each position or area of expertise below.

Position / Area of Expertise GPC Resources Engineering Suppor: Manager

- B.S. in Science or Engineering BSME

- Minimum cf 10 years total ex:erience 27 yrs.

- Minimum of 5 years nuclear power ex:erience 8 yrs.

Transient Analyses

' - B.S. in Science or Engineering MSNE/BS Physics

- Minimum of 10 years :stal ex:erience 85 yrs.

- Minimum of 5 years nuclear pcwer ex:erience 85 yrs.

- Simular:r : raining No Nuclear Fuel Characteristics anc Managemen

- E.S. in Science or Engineering MSNE/BS Physics

- Mimimum of 10 years total ex:erienca 85 yrs.

- Minimum of 5 years nuclear pcwer excerienca 85 yrs.

e

~

TABLE 3 (Continued)

?csitien/ Area of Expertise GPC Resources Fire Prc sc icn

- 1 year specific training in Fire Scienca 1

- Minimum of 5 years Octal excerienca 20

- Minimum of 2 years nuclear pcwer excerienca Engineering Meenanics of Pcwer Plant Systems and Cc=penents

- 3.5. in Mecnanical Engineering BSME

- Minimum of 5 years total experience 27 yrs.

- Minimum of 3 years nuclear power experienca 8 yrs.

- 5 years in cesign 4 yrs.

Plan 5tructure and Containment Design

- 3.5. in Mechanical or Civil Engineering BSME or ecuivaient

- Minimum of 5 years total experience 27 yrs.

- Minimum of 4 years nuclear pcwer excerience 8 yrs.

Chemistry and Radiccnemistry

- 3.5. in Chemistry or Equivalent

- 1 year Raciochemistry NO

- Minimum of 5 years total experienca

- Minimum cf 3 years nuclear pcwer excerience Radia

n Centrol and Heti
n Physics

- 3.5. in Scienca er Engineering er Ecuivalent MS Physics /BS Math Physics /

BS Nautical Science

- 1 year scecializec trainin9 No

- Minimum of e years 0c:21 experience 28 yrs.

- Minimum of 3 years nuclear power excerience 9 yrs.

e

TABLE 3 (Continued)

Positi:n/ Area of Expertise GPC Resources Reac:Or Physics Design and C:ntr:1 T'necry

. 5. "... :.., d... a. c. r d... -..Cd.=.."..

MSdE/BS Physics 3

- Minimum of 10 years :::01 ex:arianca 8h yrs.

- Minimum Of 5 years nuclear :0..,er ax:arien a Bh yrs.

- 3 years in design 8h yrs.

i s.,..e. i

.,1 p.wo.r.e,..=.~...

.v.

2...e. i n.r i s.... d...$ i :.. "...s....

BSEE

~

- M i. i.."..,. ~ #.

.v a..= -... -.. '.'a....=...s.....s.

14 yrs.

..g $.,. 4. _.... - e.

j. c. 3............s..

s.x - a rd. a.n c.=

9 yrs.

=. v a. s.. '. n.=..e. :.-

4 yrs.

- 5 years in ::ers-icn 5 yrs.

r e.,,

.o.e. s............

4 B.S. Ph sics M i r. '....".,.. #.

. v s...--.. -.., '.

s..v.. =.
d. s.....=

11 yrs.

M.inimum

.-.: years nuclear pcwer ex:erience 10 yrs.

Instrumentation anc Con: ci Systems

i. n.i s. e... 4...' l.:.. 3i n ea.r1 ng B.S. Math r

...C..

Minimum Of 5 years

a'. ex:erience 26 yrs.

Minimum 0 4 years nuclear pcwer ex:erience 12 yrs.

3

- 2 years in :e s i ;r.

16 yrs.

i I

I l

4 0**

~9 1

d @'

J 1

2

TABLE 3 (Continaed)

,as-4=
  • -++

GPC Resources R.= #.d..a.. i v a.

'J a a-.s

.'d.a.q = ; e...a.".

4... C.'. a.... '...' 'i :
i... a. a d... - - :.u i v.a. l =...

BMC

}

,f a..s. e g a a. r. i..s. '. 4.

.s.a. =. = s 4. 3 s. 64a-fl0 4......

.'A.1 3...

m.: *. m.o..aa = = =..s ]

a_X.a. a..,.4. a. g e s 6If yrs.

y

.'4inimum of a.vears nuclear cwer ex:erience 5 yrs.

e e

I i

I e

o

~

TABLE 4 DO YOUR ADVANCED PLANNING, PREPARATION, AND PROCEDURES INCLUDE THE FOLLOWING AREAS Recuired Areas i:r Soecial P cecuras Yes/No ORGANIZATION Exis:s and can be promotly activated e

es Has direct ac:ess. su:por. services Yes e

Organi:a:icnal r:les cefined and a::r:ved Plant roles complete e

Corporate roles await approval J t?.UNICATIONS V ice link be-e (Dedicated line) ween :nsite/offsite rescur:e Yes va:a linn Oe: ween ensite/Offsite resour:es e

No e

Recuncan: ::=unica:icn ca:atilities Yes Mobile c:=unications availability Yes e

C = uni:ation general ac:essibility Yes e

C:=unicatien network testing Yes e

SUPPORT SERVCIES i

Desicna:ec work areas f:r rescur:es e

(Review gr:u: es:eci ally) i.es 1

e Back u: rescu :es (cnsite personnel, corrmunica-tions)

Yes RESOURCE ' ILIZATION PROCECUPd3 5

Pr:cecures assu-ing availability cf resources Working On e

P ::scures assuring assignment of rescur:as e

Working On ACCIDENT DIAGNOSI3 AND MITIGATION Organi:a:icn of accident D&M tean (offsite) e Yes Sele:-icn, training, testing, cuties e

In Process e