ML19309G737

From kanterella
Jump to navigation Jump to search
Advises That Kw Cook Is Now Licensing Engineer at WNP-3/5. Mailing Address Is Post Office Box 1223,Elma,WA
ML19309G737
Person / Time
Site: Satsop
Issue date: 04/30/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
ELE-GCS-80-123, NUDOCS 8005070475
Download: ML19309G737 (1)


Text

8006070475 PP W shingt n Public Power Supply System A JOINT OPERATING AGENCY P o. som see sooo oso. waswimatom war

$4eew6amo. wasmeneroa sess:

Puoas (sos) 37s sooo April 30,1980 ELE-GCS-80-123 Docket Nos.

50-508 and 50-50?

Mr. H. R. Denton Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

ASSIGNtiENT OF WPPSS LICENSIt!G ENGINEER--WNP-3/5

Dear Mr. Denton:

The purpose of this letter is to advise you and members of your staff of a recent change in the assigned licensing engineer at our WPPSS nuclear projects 3 and 5 (WNP-3/5).

Mr. K enneth W. Cook has been assigned the responsibility cf Licensing Engineer at WNP-3/5 and will provide the point of contact with your personnel for that project.

In order to assure that all communications from your office receive prompt attention at the WNP-3/5 site, it is requested that Mr. Cook be placed on copy coverage for all correspondence from your staff relative to WNP-3/5.

Mr. Cook's mailing address is:

Mr. Kenneth ',1.

Cook Washington Public Power Supply System P. O. Box 1223 Elma, Washington 98541 Your favorable action on this request is appreciated.

Ver truly yours, if

. RENB. RGEP

/ Assistant Dire or, Technology

/

DLR:GCS:crw cc: Mr. Anthony Bournia, NRC g

Mr. D. G. Eisenhut, NRC oO

% 0 I

.