ML19309G787

From kanterella
Jump to navigation Jump to search
Forwards Final Rept of Significant Const Deficiency 14 Re Unsatisfactory Impact Tests on Pipe Penetration Assemblies
ML19309G787
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/01/1980
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19309G788 List:
References
Q-3-A35.07.14, NUDOCS 8005070569
Download: ML19309G787 (1)


Text

.

6005070 M S

LOUISIANA 24a c a,cNea s neer POWER & LIGHT p o.ecxsoca a NEW CALEANS. LcU:SIANA 70174. (5c41366-2345 Nui$s'ts4IA G D McLENDON May 1,1980 sena vcemecent LPL 13857 Q-3-A35.07.14 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

Subject:

Waterford SES Unit No. 3, Docket No. 50-382 Final Report of Significant Construction Deficiency No.14 " Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4" Referenca: LP&L Letter 2 2361 to NRC dated November 8,1979 (Interim Report)

Dear Mr. Seyfrit:

In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Final Report of dignific~nt Construction Deficiency No.14,

" Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 and 4. "

Yours very tn11y, GDMcL/LLB/mc Enclosures cc: Director, Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 15 copies of report)

Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Wa.shington, D. C.

20555 (with I copy of report) 6%(S

(

\\

i