ML19309G787
| ML19309G787 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/01/1980 |
| From: | Mclendon G LOUISIANA POWER & LIGHT CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19309G788 | List: |
| References | |
| Q-3-A35.07.14, NUDOCS 8005070569 | |
| Download: ML19309G787 (1) | |
Text
.
6005070 M S
LOUISIANA 24a c a,cNea s neer POWER & LIGHT p o.ecxsoca a NEW CALEANS. LcU:SIANA 70174. (5c41366-2345 Nui$s'ts4IA G D McLENDON May 1,1980 sena vcemecent LPL 13857 Q-3-A35.07.14 Mr. K. V. Seyfrit, Director, Region IV U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
Subject:
Waterford SES Unit No. 3, Docket No. 50-382 Final Report of Significant Construction Deficiency No.14 " Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4" Referenca: LP&L Letter 2 2361 to NRC dated November 8,1979 (Interim Report)
Dear Mr. Seyfrit:
In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Final Report of dignific~nt Construction Deficiency No.14,
" Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 and 4. "
Yours very tn11y, GDMcL/LLB/mc Enclosures cc: Director, Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 15 copies of report)
Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Wa.shington, D. C.
20555 (with I copy of report) 6%(S
(
\\
i