Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247H528 + (01:25:47, 2 December 2024)
- ML20247H527 + (01:25:48, 2 December 2024)
- ST-HL-AE-3172, Responds to NRC Re Violations Noted in Insp Repts 50-498/89-16 & 50-499/89-16.Corrective Actions:Procurement Document Quality Checklist Developed & Procurement Personnel Trained Re Checklist Criteria + (01:25:48, 2 December 2024)
- ML20247H525 + (01:25:49, 2 December 2024)
- ML20247H522 + (01:25:49, 2 December 2024)
- ML20247H521 + (01:25:51, 2 December 2024)
- ML20247H518 + (01:25:52, 2 December 2024)
- ML20247H520 + (01:25:52, 2 December 2024)
- ML20247H517 + (01:25:53, 2 December 2024)
- ML20247H514 + (01:25:54, 2 December 2024)
- ML20247H513 + (01:25:55, 2 December 2024)
- ML20247H512 + (01:25:55, 2 December 2024)
- ML20247H510 + (01:25:56, 2 December 2024)
- ML20247H511 + (01:25:56, 2 December 2024)
- ML20247H507 + (01:25:57, 2 December 2024)
- ML20247H506 + (01:25:58, 2 December 2024)
- ML20247H504 + (01:25:58, 2 December 2024)
- ML20247H500 + (01:26:02, 2 December 2024)
- ML20247H498 + (01:26:03, 2 December 2024)
- ML20247H497 + (01:26:03, 2 December 2024)
- ML20247H495 + (01:26:04, 2 December 2024)
- PNO-V-89-056, on 890911,SMUD Board Rejected Golden State Energy Proposal to Purchase Plant + (01:26:04, 2 December 2024)
- ML20247H492 + (01:26:05, 2 December 2024)
- JPN-89-029, Forwards Application for Amend to Tech Specs Revising Tech Spec 4.7.A.3, Continuous Leak Rate Monitoring, to Remove Misleading Ref to Continuous Leak Rate Monitoring Sys + (01:26:10, 2 December 2024)
- RBG-31271, Clarifies 890714 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Addl Actions to Improve Instrument Air Sys Scheduled for Completion by 900401 + (01:26:10, 2 December 2024)
- NOC-AE-0156, Provides Background Info Re Use of W Retran Methodology for Replacement SG Project.Nrc Will Be Requested to Complete Review by Nov 1999 + (01:26:11, 2 December 2024)
- IR 05000498/1989018 + (01:26:12, 2 December 2024)
- ML20247H478 + (01:26:12, 2 December 2024)
- ML20247H477 + (01:26:13, 2 December 2024)
- ML20247H473 + (01:26:14, 2 December 2024)
- ML20247H474 + (01:26:14, 2 December 2024)
- ML20247H472 + (01:26:15, 2 December 2024)
- ML20247H470 + (01:26:16, 2 December 2024)
- ML20247H471 + (01:26:16, 2 December 2024)
- JPN-89-024, Proposed Tech Specs 3.11.A.1 & 3.11.A.3 & Bases 3.11.A, Placing More Restrictive Limiting Conditions for Operations on Main Control Room Emergency Ventilation Sys (JPTS-89-024) + (01:26:17, 2 December 2024)
- ML20247H467 + (01:26:18, 2 December 2024)
- ST-HL-AE-3106, Responds to NRC Re Violations Noted in Insp Rept 50-499/89-02.Corrective Actions:Schedule Being Developed to Cover Preparation of Formal Training Program for Procedure Writers & Personnel Responsible for Procedure Performance + (01:26:18, 2 December 2024)
- ML20247H461 + (01:26:19, 2 December 2024)
- ML20247H464 + (01:26:19, 2 December 2024)
- ML20247H460 + (01:26:20, 2 December 2024)
- ML20247H459 + (01:26:21, 2 December 2024)
- ML20247H458 + (01:26:22, 2 December 2024)
- ML20247H454 + (01:26:22, 2 December 2024)
- ML20247H453 + (01:26:23, 2 December 2024)
- ML20247H452 + (01:26:24, 2 December 2024)
- ML20247H451 + (01:26:24, 2 December 2024)
- ML20247H449 + (01:26:28, 2 December 2024)
- ML20247H447 + (01:26:29, 2 December 2024)
- ML20247H446 + (01:26:29, 2 December 2024)
- ML20247H445 + (01:26:30, 2 December 2024)
- 05000327/LER-1988-047, :on 881225,erratic Feedwater Controls Caused Feedwater Isolation on hi-hi Steam Generator (S/G) Level & Resulted in Reactor Trip.Caused by Difficulty in Controlling S/G Levels.Valve Controllers fine-tuned + (01:26:32, 2 December 2024)
- ML20247H443 + (01:26:33, 2 December 2024)