Proposed Tech Spec Page 3/4 9-7,changing Time When Surveillances Must Be Performed
ML20247H464
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/25/1989
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20247H457 List:
References
NUDOCS 8907310028
Download: ML20247H464 (2)


Text

- _.

r; g

I ATTACIMENT III PROPOSED TECHNICAL SPECIFICATION CHANGES 8907310028 890725 ADOC.K 050004@2 PDR FDL p

w,?V

= - - - - - - - -

ng m.

<I' t

,e

'/1 -

REFUELING OPERATIONS

&-)..

i JSURVEILLANCE?RIQUIREl4ENTS (Continued)'

the movement of fuel assemblies in th ' rea esse

to y performing a load test of at.least 125E of. the. secondary automatic overloadLcutof f :and. demonstrating an automatic load icutoff when the refueling machine load exceeds'the Setpoints of Specification z

3.9.6a.2) and by demonstrating 'an automatic: load reduction trip when the load reduction exceeds-the Setpoint of. Specification 3.9.6a.3).

. '4.9.6.2. Each Lauxiliary hoist and assnciated load indicator used for raovement

,4.

, of: drive rods within the reactor vessel shall bw demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior tog;;= 1 cf the r ::t r venel '.::d by performing a load test' of at least 1250 gounds.

e the movement of ' drive rods within the reactor vessel V

i i

l i

iJ f '

WCF CREEK - UNIT 1 3/4 9-7 I