Text
- _.
r; g
I ATTACIMENT III PROPOSED TECHNICAL SPECIFICATION CHANGES 8907310028 890725 ADOC.K 050004@2 PDR FDL p
w,?V
= - - - - - - - -
ng m.
<I' t
,e
'/1 -
REFUELING OPERATIONS
&-)..
i JSURVEILLANCE?RIQUIREl4ENTS (Continued)'
the movement of fuel assemblies in th ' rea esse
- to y performing a load test of at.least 125E of. the. secondary automatic overloadLcutof f :and. demonstrating an automatic load icutoff when the refueling machine load exceeds'the Setpoints of Specification z
3.9.6a.2) and by demonstrating 'an automatic: load reduction trip when the load reduction exceeds-the Setpoint of. Specification 3.9.6a.3).
. '4.9.6.2. Each Lauxiliary hoist and assnciated load indicator used for raovement
,4.
, of: drive rods within the reactor vessel shall bw demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior tog;;= 1 cf the r ::t r venel '.::d by performing a load test' of at least 1250 gounds.
e the movement of ' drive rods within the reactor vessel V
i i
l i
iJ f '
WCF CREEK - UNIT 1 3/4 9-7 I
i
!