Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058L170 + (13:20:22, 17 December 2024)
- ML20058L168 + (13:20:23, 17 December 2024)
- ML20058L167 + (13:20:23, 17 December 2024)
- ML20058L166 + (13:20:24, 17 December 2024)
- ML20058L164 + (13:20:25, 17 December 2024)
- ML20058L165 + (13:20:25, 17 December 2024)
- ML20058L163 + (13:20:26, 17 December 2024)
- ML20058L162 + (13:20:27, 17 December 2024)
- ML20058L160 + (13:20:28, 17 December 2024)
- PY-CEI-NRR-1196, Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan + (13:20:28, 17 December 2024)
- ML20058L158 + (13:20:30, 17 December 2024)
- ML20058L157 + (13:20:30, 17 December 2024)
- 05000498/LER-1990-016, :on 900616,reactor Trip Initiated When 2 of 4 Coincidence Satisfied on Over Temp/Delta Temp.Caused by Less than Adequate Attention to Decreasing Margin to Over Temp/ Delta Temp Trip Setpoint.Procedures Revised + (13:20:32, 17 December 2024)
- TXX-9027, Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required + (13:20:33, 17 December 2024)
- ML20058L152 + (13:20:34, 17 December 2024)
- ML20058L151 + (13:20:36, 17 December 2024)
- ML20058L149 + (13:20:37, 17 December 2024)
- ML20058L145 + (13:20:38, 17 December 2024)
- ML20058L147 + (13:20:38, 17 December 2024)
- B13603, Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps + (13:20:39, 17 December 2024)
- 05000213/LER-1990-008, :on 900709,engineering Evaluation Determined That Design Deficiency Existed That Could Disable Both Centrifugal Charging Pumps During Hypothetical Loca.Check Valves Installed in Each Charging Pump + (13:20:41, 17 December 2024)
- PNO-I-90-058, on 900727,cooling Water Supply Valve to Offgas Recombiner Condenser Failed & Closed.Reactor Power Reduced & Manual Reactor Scram Initiated.Plant Will Remain Shutdown Pending Completion of Licensee post-event Investigation + (13:20:42, 17 December 2024)
- A08881, Responds to NRC Re Violations Noted in Insp Rept 50-423/90-08.Corrective Action:Operators Directly Involved W/Event Removed from Licensed Duties & Counseled by Operations Manager on Causes of Event + (13:20:43, 17 December 2024)
- PNO-I-90-057, on 900727,restart Authorized for Facility. Util Agreed to Perform Self Assessments of Performance & Inform NRC Restart Assessment Panel of Self Assessment Results + (13:20:43, 17 December 2024)
- ML20058L137 + (13:20:44, 17 December 2024)
- ML20058L136 + (13:20:45, 17 December 2024)
- ML20058L135 + (13:20:46, 17 December 2024)
- 05000382/LER-1990-008-01, :on 900703,Tech Spec 3.0.3 Entered Due to Svcs Chill Water Trains Being Declared Inoperable.Caused by Reduction of Chill Water Loads Following Dropped Control Element Assembly.Event Discussed W/Personnel + (13:20:47, 17 December 2024)
- ML20058L129 + (13:20:49, 17 December 2024)
- ML20058L126 + (13:20:50, 17 December 2024)
- 05000219/LER-1990-009, :on 900703,reactor Isolation Signal Inadvertently Initiated During Surveillance Test.Caused by Design Deficiency.Mods to Facilitate Testing Scheduled to Be Performed During Next Outage + (13:20:51, 17 December 2024)
- ML20058L124 + (13:20:52, 17 December 2024)
- 05000414/LER-1990-010-03, :on 900619,control Room Received Loss of Containment Sample Flow Alarm from Radiation Monitors.Caused by Personnel Error & Lack of Clear Procedure Guidance. Personnel Counseled + (13:20:54, 17 December 2024)
- ML20058L122 + (13:20:55, 17 December 2024)
- RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting + (13:20:56, 17 December 2024)
- 05000344/LER-1990-030, :on 900729,containment Ventilation Isolation Occurred Due to Electronic Signal Spike on Process Radiation Monitor 1B.Caused by Loose Connection Between High Voltage Cable & Connector Assembly.Connector Repaired + (13:20:57, 17 December 2024)
- ML20058L119 + (13:20:58, 17 December 2024)
- ML20058L117 + (13:20:59, 17 December 2024)
- ML20058L116 + (13:20:59, 17 December 2024)
- ML20058L113 + (13:21:01, 17 December 2024)
- ML20058L114 + (13:21:01, 17 December 2024)
- ML20058L111 + (13:21:02, 17 December 2024)
- ML20058L110 + (13:21:02, 17 December 2024)
- ML20058L108 + (13:21:03, 17 December 2024)
- ML20058L107 + (13:21:04, 17 December 2024)
- ML20058L106 + (13:21:04, 17 December 2024)
- ML20058L105 + (13:21:05, 17 December 2024)
- 05000482/LER-1993-014, :on 900501,essential Svc Water Low Flow Prior to Refueling Outage Occurred.Cause Unknown.Reportability Determination Process Revised,Rers Logged & Entered Into Tracking Database + (13:21:07, 17 December 2024)
- ML20058L099 + (13:21:09, 17 December 2024)
- ML20058L096 + (13:21:09, 17 December 2024)
- BSEP-93-0185, Application for Amends to Licenses DPR-62 & DPR-71, Correcting TS Pages Issued for Amend 166 for Unit 1 & Amend 197 for Unit 2 Re Numac Steam Leak Detection Equipment + (13:21:12, 17 December 2024)