ML20058L164

From kanterella
Jump to navigation Jump to search
Ro:On 740315,while Performing MSIV Closure Time Test During Scheduled Plant Shutdown,Msiv 2-80C Closed in 10 S,Exceeding 3-5 Interval Allowed by Tech Specs.Investigation Will Be Performed
ML20058L164
Person / Time
Site: Monticello 
Issue date: 03/15/1974
From: Larson C
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9105080337
Download: ML20058L164 (1)


Text

- - _.

  • 0.1l~,,,n3-Jr-W b $ l l b.b. 3 d Y

/,I. ;,,. -

L MORTHERN STATES POWER C O F4 P A N Y Mmticello, Minnesota 55362 March 15,1974 l

Mr. J. G. Kcppler, Regicaul Director l

Dirceterste of Regulatory Operations Regica_ III United States Atcmic Energy G:: mission 799 Poosevelt Rcad Glen Ellyn,. Illinois 61073

Dear Mr. Icppler:

10NTICELIO IUCLEAR CZNEPJTING PU.',T Ibcket Ib. 50-263 License No. DPR-22 On March 15, 1974, while performing an FsIV closure tim test during a scheduled plant shutdawn, LEIV 2-80C closed in 10 seconds.

This time is in excess of the 3-5 seconds closure tim allowed by the Technical Specifications.

The reactor is in a cold shutdom condition nnd an investigatien into tha occurrence will 'oe performed after general access to the pritnry contain:r.cnt is esta'olished.

Yours very tr 17,

c. a. u.rs(.

M Plant Manager CEI/sma i

cc: J P O'Laary, Directorate of Licensing G Charnoff Minnesota Pollution Control Agency Attn:

E A Pryzina File t

Copies sent by telecotsier to Kc:mler and O'Learv T.30 3-/5-71..prEhPEP

~ii/CCW 4S i

I 9105080357 740315 CF ADOCK 05000263

' ~ ~ ~ ~ ~...

CF j

..