ML20058L113

From kanterella
Jump to navigation Jump to search
Responds to 931130 Request Re Arrangement for Industry to Participate in 931214 & 15 Meeting on SG Issues
ML20058L113
Person / Time
Site: Ginna 
Issue date: 12/03/1993
From: Rich Smith
ROCHESTER GAS & ELECTRIC CORP.
To: Stronsnider J
NRC
References
NUDOCS 9312160151
Download: ML20058L113 (2)


Text

.

s

~

ROCHESTER GAS AND ELECTRIC CORPOR ATION

  • 89 EAST AVENUE, ROCHESTER, NX 14649 0001 l

?

wwn r mn n a rw wa i

v,.,, m,,,-

.m

  • wot m 546-2700 t

vun,,u n.

  • u j

December 3, 1993 gf'h Mr.

J.

R.

Strosnider i

Materials & Chemical Engineering Branch Division of Engineering US Huclear Regulatory Commission Mail Station P1-137 Washington, DC 20555

Dear Mr. Strosnider:

In response to your request of November 30, 1993, I would be l

pleased to arrange for the industry to participate in your December 14 and 15 meeting on steam generator issues.

Based on your proposed agenda plus my understanding of discussions between personnel on your staff and John Blomgren of Commonwealth Edison and Chuck Welty of EPRI, we have prepared the draft agenda attached hereto.

Please work directly with Chuck Welty at 415-855-2821 to develop the final agenda.

We welcome this opportunity to provide you with an update of the industry perspective on steam generator issues.

l Ver ' truly yours, M

f

/

r ob $k E. Smith Executive Committee Chairman Steam Generator Reliability Project (SGRP) c:

C.

Welty W.

Conway l

J.

Blomgren

~

1300.'i

[00 i

fjf21601en828883, hl

~i 1

e roo r-

.ess au

1 o* 200'39ed 7eloi **

I

)

DRAIT AGENDA Industry Briefing to NRC Staff on the Status of Steam Generators December 14-15,1993 Tueday December 14.1993 Utility Perspective on SG Economic Decision CECO /RG&E Analysis (about I hr.)

Wednesday Dommber 15,1993 Steam Generator Strategic Management Program (SGMP) Update 8:00 Introduction and Program Overview W. Conway (APS) 8:30 Steam Generator Status C. Welty (EPRI)

  • NDE/ISIStatus

). Smith (RG&E)/

M. Behravesh (EPRI) w 10:15 BREAK 10:30 Steam Generator Inspection and Repair (C >nt'd)

  • Repair Options / Techniques D. Goetcheus (TVA)
  • Welded Tube Repair Research C. Welty (EPRD 12:00 LUNCH 1:00 SGDSM Initiative
  • Industry Management Structure J. Blomgren (CECO)
  • Status of SGMP Technical Work D. Steininger (EPRD 2:15 Secondary Water Chemistry Control P. Paine (EPRI)
  • Ratio Chemistry Control / Water Chemisiry Guidelines
  • Inhibitor Development 3:00 Primary-to-Secondary Irakage Monitoring D. Goetchens (TVA)/

SGMP Utilities 3:30 Concluding Discussion NRC 200*3DOd 81.I1 CG. C 330