Forwards Objectives & Limitations for Trojan Emergency Plan 1993 Annual Exercise
ML20058L158
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/26/1993
From: Cross J
PORTLAND GENERAL ELECTRIC CO.
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 9312160161
Download: ML20058L158 (34)


Text

L %.

u RECEiVtm HRC Pbriland Generd BectricConpary REGION y C

James E. Cross Vice President and Chief Nuclear Officer 93 AUS 30 All:24 August 26, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 Bobby H.

Faulkenberry Regional Administrator, Region V U.

S. Nuclear Regulatory Commission 1450 Maria Lane Walnut Creek, CA 94596-5368

Dear Sir:

Trojan Radiological Emergency Plan Obiectives and Limitations for the 1993 Annual Exercise Attached for your review, please find two copies of the Objectives and Limitations for the Trojan Emergency Plan 1993 Annual Exercise.

These are being submitted in accordance with Federal Emergency Management Agency guidance as presented in Table 2 of FEMA-REP-14, " Radiological Emergency Preparedness Exercise Manual," for the exercise ~ scheduled for November 17, 1993.

The States of Oregon and Washington; Columbia County, Oregon and Cowlitz County, Washington have concurred with the enclosed objectives and limitations.

Portland General Electric (PGE) has submitted to the NRC a request for exemption from certain Title 10 of the Code of Federal Regulations, Part 50 (10 CFR 50) requirements for emergency planning.

PGE has also submitted a proposed Permanently Defueled Emergency Plan (PDEP) to the NRC and the State of Oregon for approval.

PGE currently anticipates NRC and State approval to occur on or before September 17, 1993. -Upon-receipt of these approvals, PGE will work with the appropriate I

state and county agencies to develop a set of objectives applicable to the PDEP.

J l

l 1500'7

~l 9312160161 930826 i~

)$

/

PDR ADOCK 05000344 i

F PDR

[;

j/

121 s W s:ron sneet Pomard. Ore;nn 97204 (503)464-8897

(

t j'

1 j

i

  • s.

v f-

~

Mr. Bobby H. Faulkenberry August 26, 1993 Pace 2 1

1 In the event that the approvals are'not received'as anticipated, PGE intends to request a. schedular' exemption from the requirements of 10 CFR 50, Appendix E, Section (IV) (F) (2),

requiring each licensee at each site to annually exercise its emergency plan.

Sincerely, l

S. M. Quennoz for l

J. E. Cross I

Attachment c:

Mr. David Stewart-Smith State of Oregon Department of Energy Mr. J.

F. Melfi NRC Resident I7spector Trojan Nuclear Plant Mr. Richard Donovan (2)

Federal Emergency Management Agency Region X Mr. Phil Qualls Reactor Inspector NRC, Region V i

Mr. Richard Bullock Emergency Management Cowlitz County Mr. John DeFrance Director, Emergency Services Columbia County j

Mr. Joe Murray Washington EMD

\\w U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington DC 20555 l

'.s I

a

-)

-i Trojan Nuclear Plant.

Document Control Desk Docket 50-344 August 26,-1993

~

License NPF-1

' Attachment -

14 Pages j

Trojan Radiological Emergency Plan Objectives and Limitations for the 1993 Annual Exercise f

i h

1 i

l 1

l

j

.s

)

e 1

PORTLAND GENERAL ELECTRIC l

TROJAN NUCLEAR PLANT 1993 EVALUATED EXERCISE 1.0 PARTICIPATING ORGANIZATIONS l

The following organizations and facilities will participate in the Exercise:

Orcanization and Facility PGE Control Room, Operational Support Center (OSC),

Technical Support Center (TSC), Emergency Operations Facility (EOF), Joint Information Center (JIC), PGE Field Team, and PGE EOC Representatives.

STATE OF OREGON:

State Emergency Operations Center (EOC),

l Columbia County EOC, Field Team, and EOF Representatives.

STATE OF WASHINGTON:

State EOC, Cowlitz County EOC, Field i

Team, and EOF Representatives.

i 2.0 PURPOSE The purpose of the 1993 Evaluated Exercise is to demonstrate the ability of PGE, state and county emergency response personnel to adequately protect the health and safety of the i

public during a simulated nuclear incident at the Trojan Nuclear Plant.

In addition, the conduct of this exercise is to satisfy the requirements of Title 10, code of Federal Regulations, l

Part 50, Appendix E, and guidance contained within NUREG 0654/ FEMA REP-1, Revision 1.

3.0 OVERALL PARTICIPANT SCOPE This is the overall participant scope of play for the November 1993 Trojan Exercise.

3.1 Initial Notification - PGE will classify the event and initiate the notification process.

3.2 Activation - Activation of utility personnel and facilities will be carried out per the Trojan Emergency Plan.

State and county responders and facilities will activate'per their emergency plans as described in the. objectives and limitations section 4.7.

1 I

4

1 3.3 Field Monitorina - Field team operations will'be; conducted

-l during the exercise.

One PGE team and state' teams _will i

participate.-

Activities will' include:'

(1) Communications between-the field teams and' EOF j

personnel to include obtaining survey instructions.

and reporting team radiation. exposures.

1

'(2) Radiation surveys.

j

~l EOF _ personnel will demonstrate'their. ability to direct

'l and control field teamLoperations.

)

3.4 Dose Assessment - EOF representatives from-PGE and the:

i states of Oregon and Washington.will determine off site-l doses based on available release data.

l 3.5 Plant Assessment - PGE and Oregon' Department of. Energy will monitor and evaluate Plant conditions on site.

3.6 Public Information - PGE, state, rand ~ local participants will,

develop and disseminate public information.- Key.information will be coordinated whenever possible.

1 4.0 EXERCISE OBJECTIVES AND LIMITATIONS 4.1

SUMMARY

The primary objective of the 1993' Evaluated Exercise is toi test the Trojan, state and county-emergency responsa j

organizations.

i 1l 4.2 CONTROL ROOM

)

i 1.

Demonstrate the ability-to recognize symptoms and j

parameters indicative of degrading Plant conditions.

-i 2.

Demonstrate the ability to classify. emergencies ini

?

accordance with EALs.

3.

Demonstrate the capability to make. Security land Nuclear Regulatory Commission (NRC); notifications in a-timelyL manner.

4.

Demonstrate the ability to communicate technical information to the EOF, OSC, and TSC.

5.

Demonstrate the timely.and systematic transfer of Emergency Coordinator duties.

2

-l 1

,--,-~,l

l...

i 4.3 OPERATIONAL SUPPORT CENTER (OSC)'

1.

Demonstrate the capability to activate and staff the OSC within 30 minutes of a declaration of an Alert.

1 2.

Demonstrate the capability to maintain appropriate radiological controls in the Protected' Area _throughout the course of the event.

3.

Demonstrate the ability to respond to and analyze simulated airborne and direct' radiation measurements in the Protected Area environment.

1 4.

Demonstrate the ability to provide respiratory protection and contamination. control in the Protected Area.

Limitation:

Use of self-contained breathing apparatus (SCBA) will be simulated.

5.

Demonstrate the ability to monitor OSC habitability.-

6.

Demonstrate the ability to assemble, brief, dispatch.

I and communicate with OSC emergency teams.

7.

Demonstrate the ability to conduct and maintain accountability.

8.

Demonstrate the ability to conduct periodic briefings.

i 9.

Demonstrate the ability of the OSC Director to command and coordinate OSC activities with the CR and TSC.

10.

Demonstrate the ability to communicate technical information to the TSC and Control Room.

i 4.4 TECHNICAL SUPPORT CENTER (TSC)

~

1.

Demonstrate the capability to activate and staff the TSC within 30 minutes of a declaration of an Alert.

2.

Demonstrate the ability to provide technical assistance to the control Room.

3.

Demonstrate the capability of the Duty Plant General Manager to make timely and effective decisions and demonstrate command and control of the TSC and onsite response effort.

i 4.

Demonstrate the capability to maintain appropriate i

radiological controls throughout the_ course of the. event.

'l 3

i S.

Demorstrate the ability to communicate technical information to the Control Room, OSC, and EOF.

6.

Demonstrate the ability to conduct snd maintain accountability.

7.

Demonstrate the ability to conduct periodic briefings.

4.5 EMERGENCY OPERATIONS FACILITY (EOF) 1.

Demonstrate the capability to activate and staff the EOF within 30 minutes of a declaration of an Alert.

2.

Demonstrate the timely and systematic transfer of Emergency Coordinator duties.

3.

Demonstrate.the ability of the Emergency Response Manager to make timely and effective decisions and demonstrate command and control of the EOF and overall response effort.

4.

Demonstrate the capability to provide facility access control.

5.

Demonstrate the ability to conduct periodic briefings.

6.

Demonstrate the ability to evaluate the source term and make dose projections based on Plant parameters, onsite or offsite field survey information, meteorological data and other simulated information.

7.

Demonstrate the ability to notify state, local and federal government agencies.

8.

Demonstrate the ability to communicate technical information to the TSC and other offsite agencies.

9.

Demonstrate the capability to perform offsite airborne radiation monitoring and collect field samples (water, vegetation, soil, and air).

10.

Demonstrate the ability to provide coordination and control of the field teams.

11.

Demonstrate the ability to communicate protective actions, event data, and Plant status to the field teams.

12.

Demonstrate the capability to transmit emergency classification, Plant status, dose assessment data, and PARS to offsite agencies.

4

\\

.s 13.

Demonstrate the ability to gather and transmit information to the JIC, draft releases,-and support JIC-requests for information.

l 4.6 SECURITY 1.

Demonstrate the capability to notify the following organizations within fifteen minutes after the declaration of an emergency:

Columbia County Cowlitz County State of Washington 4

State of Oregon U.S. Coast Guard 3

2.

Demonstrate the capability to alert and notify the Trojan Emergency Response Organization after.the declaration of an emergency.

4.7 OFFSITE OBJECTIVES Snecific Offsite Obiectiv.gg Objectives along with associated facility / location to be evaluated and any applicable limitation or exception are listed below.

Note that Objectives 10, 14, 15, 17, 18, 19, 20, 21, 22, 23, 28, 29, 30, 31, 32, and 33 will-not be demonstrated at any facility or location during this drill.-

As a general limitation, in the event of an actual emergency.

the exercise will be canceled or terminated-1.

MOBILIZATION OF EMERGENCY PERSONNEL Demonstrate the capability to alert and fully mobilize personnel for both emergency facilities and field operations.

Demonstrate the capability to activate and 4

staff emergency facilities for emergency operations, j

Particination Oregon EOC, Columbia County EOC, Washington EOC, Cowlitz County EOC, Oregon Field Team, Washington State Field Team, State Responders to EOF, JIC and Oregon News Center.

5

~.s

(

l l

Limitations l

Washington State -

The Washington State'EOC will be partially staffed to provide the capability to accomplish the r'

objectives stated herein, within the limitations established.

Washington' State PIO and MUDAC staff will be pre-staged in Portland and Kelso.

Cowlitz County -

The Cowlitz County EOC will be r

partially staffed to provide the capability to accomplish the objectives stated herein,~within the limitations established.

All field activities for Cowlitz 7

County will be simulated.

Oregon -

The Columbia County EOC will be fully. set up prior to initial notice.

s Communications equipment in the Oregon EOC will be set up prior to initial notice.

All other facilities and personnel will activate upon notificat'.an.

Notification in Columbi

.U'ty will be limited to those wet.cies and personnel C-COM notifies and l

any other persons needed to staff the EOC.-

i At a minimum, the Oregon EOC will-

-i demonstrate a limited activation.

Additional emergency responders'may-be called in as needed.

i l

6 i

L-

1 d

2.

FACILITIES - EQUIPMENT, DISPLAYS, AND WORK ENVIRONMENT-t j[

Demonstrate the adequacy of facilities, equipment, displays and other materials:to support emergency operations; i

Participation Oregon EOC, Columbia County EOC, Washington EOC,^

Cowlitz County EOC, Oregon Field Team,' Washington State Field Team, JIC and Oregon News-Center.

.[

Limitations Washington State -

No Emergency Worker Centers or

[

Assistance: Centers will be activated.

Once controlled access to the Washington State EOC is i

~ demonstrated, the WSP guard will be:

'i dismissed

'i Cowlitz' County -

The Cowlitz County EOC.will be. set i

up prior initial notice.z i

Oregon -

The Columbia County-EOC will be~ set.

l up prior to initia11 notice.

3.

DIRECTION AND CONTROL Demonstrate the capability to direct and control I

emergency operations.

~

Particinati2D Oregon EOC, Washington EOC,fColumbia County EOC, Cowlitz County EOC.

?

Limitations i

i General Limitation -

-In the event of an actual 3

emergency, the exercise will be l

canceled or terminated.

J J

l 4.

COMMUNICATIONS i

Demonstrate the capability to communicate with all appropriate emergency personnel at facilities and in the field.

j 7

.s Particination Oregon EOC, Columbia County EOC, Washington EOC, Cowlitz County EOC, Oregon Field Team, Washington State Field-Team, State Responders to EOF, JIC and Oregon News Center.

Limitations Washington State -

Communications will be exercised only to the extent needed to t

accomplish the objectives within the limits herein established.

Cowlitz County -

Communications equipment in the EOC will be_used/ tested during the play of the exercise.

Cowlitz County EOC will communicate with those facilities / organizations activated.

Communications may be simulated with facilities / organizations not activated.

Oregon -

Communications equipment in the Columbia County EOC will be used and/or tested during the play of the exercise.

f 5.

EMERGENCY WORKER EXPOSURE CONTROL Demonstrate the capability to continuously monitor and control radiation exposure to emergency workers.

Particination Oregon Field Team Limitations Oregon will demonstrate dose control but not tracking

~

for emergency workers.

i t

8 i

m

6.

FIELD RADIOLOGICAL MONITORING - AMBIENT RADIATION MONITORING i

Demonstrate the appropriate use of-equipment and procedures for determining field radiation measurements.

Particination Oregon Field Team, Washington State Field Team and State Responders to EOF Limitations - None 7.

PLUME DOSE PROJECTION Demonstrate the capability to develop dose projections and protective action-recommendations regarding evacuation and sheltering.

Particination Oregon EOC, Columbia County EOC, Washington EOC, Cowlitz County EOC, and State Responders to. EOF.

9 Limitations General Limitations -

PAR's regarding sheltering and evacuation will not be demonstrated.-

8.

FIELD RADIOLOGICAL MONITORING - AIRBORNE RADIOIODINE AND PARTICUIATE ACTIVITY MONITORING Demonstrate the appropriate use of equipment and procedures for the measurement of airborne radiciodine concentrations as low as 10" (0.0000001) 'microcuries per cubic centimeter in the presence of noble gases and obtain samples of particulate activity in the airborne

~

plume.

l ParticiDation Oregon Field Team and Washington State Field Team.

Limitations General Limitation-Monitoring for radiciodine will not be' demonstrated 9

.. ~. -. - _.. - -

Washington State -

Negative verification willibe done~

by one field team.'

{

Oregon -

The field' team will' demonstrate

-preparation of the sample (for, transport to-the lab.

Actual-transport of'the sample to the lab.

j will'not~be demonstrated. - The lab

'j analysis will~beLsimulated..-The-controllers will provide-.

appropriate. sample-analysisj results.-

9.

PLUME PROTECTIVE ACTION DECISION MAKING l

d Demonstrate the capability to mak'e-timely-and' l

appropriate protective action decisions :(PAD)..

j

.i Particination-

l't l

Oregon EOC, Columbia' County EOC, Washington EOC and i

Cowlitz County EOC.

-i i

Limitations f

.L i

General Limitation-Only. PAD's-affeg)ing_Goble School' l

and the river apply.;

j l

L!

1 Washington State -

Decision making process"will be.

l demonstrated which:may: showithat no j

l protective actions are necessary.

c Cowlitz' County -

Plume protective action 1 decision-j making isLnot applicablelgiven the I

hazards relating lto the plant's; l

current' status. ~

l l

11.

PUBLIC INSTRUCTIONS AND: EMERGENCY-INFORMATION i

l Demonstrate the capability-tolcoordinate the)

)

formulation and dissemination of._ accurate ^information g

and instructions to.the'public..

'j l

Particioation Oregon EOC, Columbia County EOC,:JIC.

.10 I

~

1 i

1.

Limitations Oregon Implementation of off-site

]

protective' actions will be simulated.

Notification of a

farmers, dairies and food

{

processors will-be' simulated.- Food;

- j safety instructions will1be prepared-butLnot actuallyfprovided.

12.

EMERGENCY INFORMATION - MEDIA.

- i

. Demonstrate the capability to coordinate the j

l development and dissemination of clear, accurate and~

timely information to the-news. media.

a Particination l

Oregon EOC,= Columbia County EOC,' Washington EOC, Cowlitz County EOC, JIC and' Oregon News Center.

Limitations

?

Cowlitz county -

Press conferences willibe.

simulated.

i i

Oregon -

Oregon will conduct briefings in:

Salem.. Oregon:also will provide'a1 representative to the JIC.-

' Columbia County will issue news i

releases-but will noticonduct.

j briefings.

l

(

Washington -

Washington.will. activate a group of-PIOS in Olympia'and:will be on-l standby. operations per State Procedure 10.2 at the Alert Level..

No news briefings'will be j

conducted..

i r

I l

i 11 u-

\\

i 13.

EMERGENCY INFORMATION - RUMOR CONTROL l

Demonstrate the capability to establish and operate rumor control in a coordinated and timely-manner.

i Participation Oregon EOC, Columbia County EOC, Washington EOC and

.]

JIC.

Limitations I

Washington State -

A control cell will be staffed with sufficient personnel so that each rumorLcontrol staff member will i

respond to no less than six calls per hour for a two to three hour period.

j Cowlitz County -

Calls to Rumor Control Centers will ordinate from one control cell.

Cowlitz County will not staff rumor i

control.

Rumor control for Cowlitz County calls will be referred to.

l the JIC.

Oregon -

Calls to Rumor Control Centers will originate from one control cell.

Each operator will receive at least-six calls per hour.

16.

IMPLEMENTATION OF PROTECTIVE ACTIONS - SCHOOLS 1

Demonstrate the capability and resources necessary to implement protective actions for school children within the plume pathway emergency planning zone (EPZ).

Participation Columbia County EOC.

Limitations Oregon -

Decisions will be made and discussed with appropriate school

{

official, but school buses will not be activated.

Evaluator will visit appropriate school and bus facility and interview selected individuals.

12

)

24.

POST - EMERGENCY SAMPLING Demonstrate the use of equipment and procedures for the collection and transportation of samples from areas that received deposition from the airborne plume.

Particiaation Oregon Field Team Limitations Oregon'-

Sample collection w'ill be limited to vegetation, milk, water, and current field crops.

After the sampling team _is dispatched, the demonstration will be conducted without regard to the scenario timeline.

The controller will provide further directions for sampling collection to assure full demonstration of collection and processing of all necessary samples.

Transport of samples will i

be simulated.

25.

LABORATORY OPERATIONS Demonstrate laboratory operations and procedures for measuring and analyzing samples.

ParticiDation Oregon Health, Laboratory Limitations Oregon -

This objective is for training purposes only and will not be_part of the FEMA evaluation.

26.

INGESTION EXPOSURE PATHWAY--DOSE PROJECTION AND--

PROTECTIVE ACTION DECISION MAKING Demonstrate the capability to project dose to the

~

public for the ingestion exposure pathway and to recommend protective actions.

Particination EOF, Oregon EOC 13

I I

l i

Limitations - None i

27.

INGESTION EXPOSURE PATHWAY--PROTECTIVE ACTION IMPLEMENTATION i

Demonstrate the capability to implement protective actions for the ingestion exposure pathway.

Particination l

Oregon EOC, Columbia County EOC Limitations Oregon -

Protective actions will be simulated.

Each EOC will document the process needed to implement the State's protective action decisions.

l I

I I

14

^

)

s

,,0

  • ~

SEP131993 l'

Docket Number 50-344

+

f Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention:

Mr. James E. Cross Vice President and Chief Nuclear Officer

SUBJECT:

TROJAN 1993 EXERCISE OBJECTIVES AND LIMITATIONS-This letter refers to your August 26, 1993, letter which forwarded the objectives and limitations for the 1993 annual exercise scheduled for November.

17, 1993. Since this is a biennial year, objectives and limitations for. the offsite agencies were also included in your submittal.

We have completed our review of the exercise objectives and limitations. The results were discussed during a September 2,1993, = telephone conversation between Ms. G. Good, of my staff,'and Mr. J. Co9per, of your staff.

I understand that all of our questions were satisfactorily explained.

WecontactedtheFederalEmergencyManagementAgency.(FEMA),RegionX,during our review. Mr. R. Donovan had no comments for us.to relay to you.

As indicated in your letter, approval of Portland General Electric's

~

Permanently Defueled Emergency Plan (PDEP) is anticipated-in the near future.-

Once the appropriate approvals are received, it will be necessary for you modify the objectives to be consistcnt with the PDEP. Since any modifications -

will also affect FEMA, we request that you keep Mr. Donovan. apprised of changing conditions.

Based on the results of our review, and pending any further~ changes, the exercise objectives and limitations for the 1993' exercise appear to be consistent with current emergency plan requirements and plant conditions.

Sincerely, i

siginal signW by~

Robert J. Pate, Chief Safeguards, Emergency Preparedness, and l

Non-Power-Reactor Branch j

l cc:

T. D. Walt, General Manager, Technical Functions R. Donovan, FEMA, Region X l

y} [)A 0 00 S*

1 ff ^

s J. Cross bec:

j R. A. Erickson, NRR/PEPB P. Qualls

,EP_ File 5;2.1 m.

~

RV/cb i

UEST COPY REQUEST COPY S310 TO PDR TO DCS E NO YES/NO GENO NO j

GGood S Y RPat //

9/ 9 /93 9//J /93 i

.l t

f I

[

.. j t

i I

i 1

i i

.i l

1 i

l l

.I RECEL L i

NRC Portland General ElecbicCompany REGION y James E. Cross 93 AUG 30 A11:24 Vice President and Chief Nuclear Officer August 26, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 Bobby H.

Faulkenberry Regional Administrator, Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane Walnut Creek, CA 94596-5368

Dear Sir:

Trojan Radiological Emergency Plan Ob-lectives,and Limitations for the 1993 Annual Exercise Attached for your review, please find two copies of the Objectives and Limitations for the Trojan Emergency Plan 1993 Annual Exercise.

These are being submitted in accordance with Federal Emergency Management Agency guidance as presented in Table 2 of ?EMA-REP-14, " Radiological Emergency Preparedness Exercise Manual," for the exercise scheduled for November 17, 1993.

The States of Oregon and Washington; Columbia County, Oregon and Cowlitz county, Washington have concurred with the enclosed objectives and limitations.

Portland General Electric (PGE) has submitted to the NRC a request for exemption from certain Title 10 of the Code of Federal Regulations, Part 50 (10 CFR 50) requirements for emergency planning.

PGE has also submitted a proposed Permanently Defueled Emergency Plan (PDEP) to the NRC and the State of Oregon for approval.

PGE currently anticipates NRC and State approval to occur on or before September 17, 1993.

Upon -

receipt of these approvals, PGE will work with the appropriate state and county agencies to develop a set of objectives applicable to the PDEP.

'a 5 li Sav SNK P:n an1 O?gan 9'2'M (503)464-8897

)

i l

i i

I Mr. Bobby H. Faulkenberry j

l-August 26, 1993 Pace 2 i

In the event that the approvals are not_ received as anticipated, PG3 intends to request a schedular exemption from the

{

requirements of 10 CFR 50, Appendix E, Section - (IV) (F) (2),

requiring each licensee at each site to annually exercise its emergency plan.

l Sincerely, i

i S. M. Quennoz for l

J.

E. Cross Attachment c:

Mr. David Stewart-Smith State of Oregon Department of Energy Mr. J. F. Melfi l

NRC Resident Inspector Trojan Nuclear Plant l

Mr. Richard Donovan (2)

Federal Emergency Management Agency Region X Mr. Phil Qualls i

Reactor Inspector NRC, Region V 5

Mr. Richard Bullock Emergency Management Cowlitz County Mr. John DeFrance Director, Emergency Services I

Columbia County Mr. Joe Murray Washington EMD

\\

U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington DC 20555

l,

}

Trojan Nuclear Plant -

Document Control Desk Docket 50-344 August 26,1993

.l License NPF-1 Attachment

~i 14 Pages i

i h

Trojan Radiological Emergency Plan Objectives and Limitations for the 1993 Annual Exercise i

i l

-t I

l 1

i l

l l

PORTLAND GENERAL ELECTRIC TROJAN NUCLEAR PLANT 1993 EVALUATED EXERCISE 1.0 PARTICIPATING ORGANIZATIONS The following organizations and facilities will participate in the Exercise:

Oraanization and Facility PGE Control Room, Operational Support Center (OSC),

Technical Support Center (TSC), Emergency Operations Facility (EOF), Joint Information Center (JIC), PGE Field Team, and PGE EOC Representatives.

l STATE OF OREGON:

State Emergency Operations Center (EOC),

l Columbia County EOC, Field Team, and EOF Representatives.

STATE OF WASHINGTON:

State EOC, Cowlitz' County EOC, Field l

Team, and EOF Representatives.

2.0 PURPOSE The purpose of the 1993 Evaluated Exercise is to demonstrate l

the ability of PGE, state and county emergency response personnel to adequately protect the health and safety of the public during a simulated nuclear incident at the Trojan Nuclear Plant.

In addition, the conduct of this exercise is to satisfy the requirements of Title 10, Code of Federal Regulations, Part 50, Apperidix E, and guidance contained within l

NUREG 0654/ FEMA REP-1, Revision 1.

3.0 OVERALL PARTICIPANT SCOPE l

This is the overall participant scope of play for the November 1993 Trojan Exercise.

3.1 Initiet Hotification - PGE will classify the event and initiate the notification process.

l l

3.2 Activation - Activation of utility personnel and facflities will be carried out per the Trojan Emergency Plan.

State and county responders and facilities will activate per their emergency plans as described in the objectives and limitations section 4.7.

1

i

-t I

L j

3.3 Field Monitorina - Field team operations.will be conducted _

l during the exercise.

One PGE team and state teams will j

f participate.

Activities will include:

(1) Communications between the field teams and EOF.

personnel to include obtaining survey instructions and reporting team radiation exposures.

(2) Radiation surveys.

EOF personnel will demonstrate their ability.to direct and control field team operations.

3.4 Dose Assessment - EOF representatives from PGE and the states of Oregon and Washington _will determine off site

'i doses based on available release data.

3.5 Plant Assessment - PGE and Oregon Department of Energy will monitor and evaluate Plant conditions on site.-

'j 3.6 Public Information - PGE, state,7and local participants;will,

develop and disseminate public information.. Key information' will be coordinated whenever possible.

5 4.0 EXERCISE OBJECTIVES AND LIMITATIONS

)

4.1

SUMMARY

i The primary objective of the 1993' Evaluated Exercise.is to.

test the Trojan, state-and county emergency response l

organizations.

J l

4.2 CONTROL ROOM 1.

Demonstrate the ability to recognize symptoms and

. parameters indicative of degrading Plant conditions.-

2.

Demonstrate the ability to. classify emergencies in accoraance with EALs.

3.

Demonstrate the capability to.make. Security and Nuclear j

Regulatory Commission (NRC) notifications in.a timely j

l manner.

.l 4.

Demonstrate the ability tx) communicate technical information to the-EOF, OSC, and TSC.

5.

Demonstrate the timely and systematic transfer of l

Emergency Coordinator duties.

1 i

2 l

i I

m

,,-f.

-,,,m

4 '.

4.3 OPERATIONAL SUPPORT CENTER (OSC) 1.

Demonstrate the capability to activate and staff the OSC within 30 minutes of a declaration of an Alert.

2.

Demonstrate the capability to maintain appropriate-radiological controls in the Protected Area throughout the course of the event.

3.

Demonstrate the ability to respond to and analyze simulated airborne and direct radiation measurements in the Protected Area environment.-

4.

Demonstrate the ability-to provide respiratory protection and contamination control in the Protected Area.

Limitation:

Use of self-contained breathing apparatus (SCBA) will be simulated.

5.

Demonstrate the ability to monitor OSC habitability.

6.

Demonstrate the abili';y to assemble, brief,: dispatch-and communicate with OSC emergency teame.

7.

Demonstrate the ability to conduct and maintain accountability.

8.

Demonstrate the ability to conduct periodic briefings.

9.

Demonstrate the ability of the OSC Director to command and coordinate OSC activities with the CR-and TSC.

10.

Demonstrate the ability to communicate-technical.

information to the TSC and Control Room.

4.4 TECHNICAL SUPPORT CENTER (TSC)

~

1.

Demonstrate the capability to activate and staff [the TSC within 30 minutes of a declaration of an Alert.

2.

Demonstrate the ability to provide technical. assistance to the Control Room.

3.

Demonstrate the capability of the Duty Plant General Manager to make timely and effective decisions and demonstrate _ command and control of the TSC and'onsite response effort.

4.

Demonstrate the capabilityLto maintain appropriate.

radiological controls throughout the course of theLevent.

3

l e

l i

5.

Demonstrate the ability to communicate technical' information to the Control Room, OSC, and EOF.

6.

Demonstrate the ability to conduct and maintain accountability.

i 7.

Demonstrate the ability to conduct periodic briefings.

4.5 EMERGENCY OPERATIONS FACILITY-(EOF)

-l 1.

Demonstrate the capability to activate _and staff the EOF within 30 minutes of a declaration of an Alert.

2.

Demonstrate the timely and systematic transfer of Emergency Coordinator duties.

3.

Demonstrate the ability of the Emergency Response Manager to make timely and effective decisions and l

demonstrate command and control of the EOF and overall response effort.

4.

Demonstrate the capability to provide facility access-control.

l l

5.

Demonstrate the ability to conduct periodic briefings.

6.

Demonstrate the ability to evaluate the source term and j

make dose projections based on Plant parameters, onsite I

or offsite field survey information, meteorological i

l data and other simulated information.

l 7.

Demonstrate the ability to notify state, local and federal government agencies.

8.

Demonstrate the ability to communicate technical information to the TSC and other offsite-agencies.

9.

Demonstrate the capability to perform offsite airborne-radiation monitoring and collect field samples (water, vegetation, soil, and air).

i l

10.

Demonstrate the ability to provide' coordination and l

control of the field teams.

11.

Demonstrate the ability to communicate protective l

actions, event data, and Plant status to_the field l

teams.

l 12.

Demonstrate the capability to transmit emergency j

classification, Plant status, dose assessment data, and 1

PARS to offsite agencies.

4 l

=,./ *,

s i

i 13.

Demonstrate the ability to gather and transmit l

information to the JIC, draft-releases, and support JIC j

l requests for information.

l 4.6 SECURITY j

i j

1.

Demonstrate the capability to notify 1the following organizations within fifteen minutes after the declaration of an emergency:

)

l Columbia County i

Cowlitz County j

l State of Washington j

l State-of Oregon.

U.S. Coast Guard l

2.

Demonstrate the capability to alert and notify.the Trojan Emergency Response. Organization after the declaration of an emergency.

>i l

4.7 OFFSITE OBJECTIVES Soecific Offsite Obiectives Objectives along with associated facility / location to be-evaluated and any applicable limitation or: exception are listed below.

Note that Objectives 10,J14,.15, 17, 18,.19, 20, 21, 22, 23, 28, 29, 30, 31,732, and'33 will1notlbe demonstrated at any facility or' location during this drill.

As a general limitation, in the event of an actual emergency.

l the exercise will be canceled or terminated..

1.

MOBILIZATION OF EMERGENCY PERSONNEL-Demonstrate the capability to alert:and fully mobilize personnel for both emergency facilities and fieldi operations.

Demonstrate the' capability to activate and staff emergency facilities for emergency operations.

Particioation Oregon EOC, Columbia County lEOC, Washington EOC,.

Cowlitz County EOC, Oregon Field Team,(Washington State!

F'eli Team, State Responders >to-EOF, JIC and Oregon itwa Center.

5

4 4

t Limitations j

Washington State -

The Washington State EOC will be~

l partially staffed:to provide the 1

capability.to accomplish the-objectives stated herein, within j

the limitations established.

Washington State PIO and MUDAC staff will be pre-staged in 1

' Portland and Kelso.

l Cowlitz County -

The Cowlitz County EOC will.be l

partially staffed to provide:the capability to accomplish'the

~

.objectiveF stated herein,;withinL the limitations established.

l

.All field activities for Cowlitz-'

-l l

County willybe' simulated.

. oregon -

The Columbia County EOC willibe-fully set up prior to initial.

notice.

Communications. equipment in the 1

l Oregon EOC will'be. set up prior to, t

initial notice..All othere facilities'.and personnel;will j

activate upon notification.-

Notification in Columbia-County.

i will be limited to those agencies and personnel C-COM notifies-and-l any.other persons needed_to staff the EOC--

At a minimum, the Oregon EOC will

~j demonstrate a' limited activation..

j

-Additional-emergency responders mayL j

be called in as needed.

I V

'. i j

i i

2.

FACILITIES. - EQUIPMENT, DISPLAYS, AND WORK ENVIRONMENT i

~

Demonstrate the adequacy of facilities, equipment, displays and other materials to support emergency

)

operations.

Participation Oregon EOC, Columbia County EOC, Washington EOC, Cowlitz County EOC, Oregon Field Team, Washington State Field Team, JIC and Oregon News Center.

Limitations Washington State -

No Emergency Worker Centers or Assistance Centers will be activated.

Once controlled access to the Washington State EOC is l

demonstrated, the WSP guard will be dismissed Cowlitz County -

The Cowlitz. County EOC will be set up prior initial notice.

Oregon -

The Columbia County EOC will be set up prior to initial notice.

3.

DIRECTION AND CONTROL Demonstrate the capability to direct and control emergency operations.

Participation Oregon EOC, Washington EOC, Columbia County EOC, Cowlitz County EOC.

Limitations General Limitation -

In the event of an actual emergency, the exercise will be canceled or terminated..

4.

COMMUNICATIONS Demonstrate the capability to communicate with all appropriate emergency personnel at facilities and in the field.

7 l

7 i

j i

i Particination Oregon EOC, Columbia County EOC, Washington'EOC,'

Cowlitz county EOC, Oregon Field Team, Washington State i

Field Team,-State Responders'to EOF,.._JIC and Oregon News Center.

Limitations

. i 2

Washington' state -

Communications will be' exercised only to the extent needed to-accomplish:theiobjectives;within:

- i the:11mits herein established.-

i Cowlitz county -

Communications'equipmentLin the EOC~

)

will be used/ tested _during the. play:

offthe' exercise.- Cowlitz county.

EOC will communicate with those-l facilities / organizations activated.-

Communications _may be simulated _

with~ facilities / organizations _not activated.

Oregon -

Communications _ equipment _in the.

Columbia County:EOCLwillibe usedi and/orttested'during the. play.of j

the exercise.

t 5.

EMERGENCY WORKER EXPOSURE CONTROL

~

Demonstrate the: capability toLeontinuously. monitor and-control radiation exposure.to' emergency workers.

l l

1

(

Earticination Oregon Field Team I

r l

Limitations i

l Oregon will denonstrate dose control but-not, tracking for emergency workers.

i g

A 9

0 8

I l

_ ~.. -_

..__;.,..-._cu.

9

. J 6.

FIELD RADIOLOGICAL MONITORING - AMBIENT RADIATION MONITORING Demonstrate the appropriate use of equipment and procedures for determining field radiation measurements.

Participation f

r i

Oregon Field Team, Washington State Field Team and l

State Responders to EOF I

Limitations - None 7.

PLUME DOSE PROJECTION l

Demonstrate the capability to develop dose projections and protective action recommendations regarding evacuation and sheltering, j

ParticiDation Oregon EOC, Columbia County EOC,. Washington EOC, Cowlitz County EOC, and State Responders to EOF.

i Limitations General

-j Limitations -

PAR's regarding sheltering and evacuation will not be demonstrated.

8.

FIELD RADIOLOGICAL MONITORING - AIRBORNE RADIOIODINE l

AND PARTICULATE ACTIVITY MONITORING

]

Demonstrate the appropriate use of equipment and procedures for the measurement of airborne radioiodine concentrations as low as 10~7 (0.0000001) microcuries per cubic centimeter in the presence of noble gases and obtain samples of particulate activity in the airborne plume.

ParticiDation Oregon Field Team and Washington State Field Team.

l Limitations l

l General Limitation-Monitoring for radiciodine will not be demonstrated 9

l l

e*.

a l

Washington State -

Negative verification will be'done, j

by one field team.

I Oregon -

The field team will demonstrate 4 preparation of the sample for j

transport to the lab.- Actual-transport of the sample to the lab l

will not be demonstrated.-.The. lab analysis will be simulated.

The.

controllers will. provide i

appropriate sample analysis results.-

l 4

3 9.

PLUME PROTECTIVE ACTION DECISION ~ MAKING Demonstrate the capabilityl o make timely'and t

appropriate protective action' decisions (PAD).'

Earticipation Oregon EOC, Columbia County EOC, Washington EOC.and

[

Cowlitz County EOC..

r Limitations General Limitation-Only PAD's affecting Goble School and the 2iver apply.-

Washington State -

Decision' making processfwill be:

demonstrated which~may show that no i

protective' actions are necessary.

Cowlitz County -

Plume protective action-decision-making is not applicable given the hazards relating'to-the plant's'

. current status..

4 11.

PUBLIC INSTRUCTIONS AND EMERGENCY INFORMATION l

Demonstrate the capability to coordinate the formulation and dissemination offaccurate information and' instructions.to the public.

l l

Participation I

Oregon EOC,. Columbia County EOC, JIC.

f i

10 l

i l

t

e*.

t

.'I Limitations Oregon -

Implementation of off-site l

protective actions will be simulated.

Notification of farmers, dairies and food processors will be simulated.

Food-safety instructions will be prepared but not actually provided.

12.

EMERGENCY INFORMATION - MEDIA Demonstrate the capability to coordinate the development and dissemination of clear, accurate and timely information to the news media.-

Particioation Oregon EOC, Columbia County EOC, Washington EOC, Cowlitz County EOC, JIC and Oregon News Center.

i Limitations y

Cowlitz County -

Press conferences will be L

simulated.

Oregon -

Oregon will conduct briefings in Salem.

Oregon'also will. provide a representative to the JIC.

Columbia County will issue news releases but will not: conduct l

briefings.

Washington -

Washington will activate a group of PIOS in Olympia.and will be on r

standby operations per. State Procedure 10.2 at the Alert Level.

No news briefings will be j

conducted.

)

i i

11 1

d' 13.

EMERGENCY INFORMATION - RUMOR CONTROL Demonstrate the capability to establish and operate ~

rumor control in'a coordinated and timely manner.

Particination Oregon EOC, Columbia County EOC, Washington EOC-and; JIC..

Limitations Washington State - A control cell will be staffed'with sufficient' personnel.so that each

. rumor' control staff member will respond to no lesc than-six calls a-r hour for a two to three hour period.

Cowlitz County -

Calls to Rumor Control Centers will ordinate from'one control cell.

Cowlitz County-will not staff rumor control.

Rumor control for Cowlitz County calle will'be referred to.

the JIC.

Oregon -

Calls to Rumor Control Centers will

~

originate from one' control cell.

i l

Each operator will receive at least

~

j six calls per hour.

l l

16.

IMPLEMENTATION OF. PROTECTIVE ACTIONS'- SCHOOLS.

Demonstrate the capability and resources necessary to implement protective actions for: school children within the plume pathway emergency planning zone (EPZ).

Particination Columbia County EOC.

Limitations Oregon -

Decisions will he made and discussed'with appropriate school official,.but school buses'will not

'be activated.

Evaluator will visit 1

appropriate school'and bus facility I

and interview selected individuals.

12 l

i i

o'.

(

24.

POST - EMERGENCY' SAMPLING J't Demonstrate the use of equipment and procedures for.the collection and transportation of samples from areas that received deposition from.the airborne plume.

Particination-Oregon Field Team Limitations

. Oregon -

Sample collection will be limited.

to. vegetation,; milk, water, and.

current field crops. 'After the-sampling team is dispatched,.the demonstration.will be conducted without-regard to the scenario timeline..The controller will

-5 provide further directions 1for,

sampling collection to assure full demonstration of collection and processing of all necessary:

samples.

Transport of. samples will be' simulated.

25.

LABORATORY OPERATIONS-Demonstrate laboratory operations and. procedures for measuring and analyzing samples.

Earticination Oregon Health Laboratory Limitations Oregon -

This objective is for trainings purposes only and'will not be part.

of the FEMA evaluation.

26.

INGESTION EXPOSURE PATHWAY--DOSE PROJECTION AND-PROTECTIVE ACTION DECISION MAKING Demonstrate the capability to project ~ dose to the; public for"the ingestion exposure pathway and txt recommend protective actions.

Earticination EOF, Oregon EOC 13

ll.; j.,

~

i Limitations - None 27.

INGESTION EXPOSURE PATHWAY--PROTECTIVE ACTION f

IMPLEMENTATION

' Demonstrate the' capability to implement protective ~

actions for the. ingestion expost?re pathway. -

l i

l Particination Oregon EOC, Columbia County EOC-l Limitations r

Oregon -

Protective' actions will be simulated.- Each-EOC'will' document-

- F

{

-the process.needed.to' implement the.

State's-protective. action

decisions, j

l l

..q e

P I

i 1

E I

5 l

r h

' ?

i i

14 E

-=.

?

~

S-SEP131993 Docket Number 50-344 2

Portland General Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Attention:

Mr. James E. Cross Vice President and Chief Nuclear Officer

SUBJECT:

TROJAN 1993 EXERCISE OBJECTIVES AND LIMITATIONS This letter refers to your August 26, 1993, letter which forwarded the objectives and limitations for the 1993 annual exercise scheduled for November 17, 1993. Since this is a biennial year, objectives and limitations for the offsite agencies were also included in your submittal.

We have completed our review of the exercise objectives and limitations. The results were discussed during a September 2,1993, telephone conversation between Ms. G. Good, of my staff, and Mr. J. Cooper, of your staff.

I understand that all of our questions were satisfactorily explained.

We contacted the Federal Emergency Management Agency (FEMA), Region X, during our review. Mr. R. Donovan had no comments for us to relay to you.

As indicated in your letter, approval of Portland General Electric's Permanently Defueled Emergency Plan (PDEP) is anticipated in the near future.

Once the appropriate approvals are received, it will be necessary for you modify the objectives to be consistent with the PDEP. Since any modifications will also affect FEMA, we request that you keep Mr. Donovan apprised of changing conditions.

Based on the results of our review, and pending any further changes, the exercise objectives and limitations for the 1993 exercise appear to be consistent with current emergency plan requirements and plant conditions.

Sincerely, uhnal sgacc t,y Robert J. Pate, Chief Safeguards, Emergency Preparedness, and Non-Power Reactor Branch cc:

T. D. Walt, General Manager, Technical Functions R. Donovan, FEMA, Region X j y, g

.~.

. -. = _ _.

s.

a.-

i J. Cross ;

i bec:

R. A. Erickson, NRR/PEPB P. Qualls' EP File 5.2.1.

t i

RV/cb UEST COPY REQUEST COPY D TO PDR-S D T0 DCS :

E NO YES/NO NO ES NO GGood M RPat I

'9/ 9 /93 9/L5 /93 I

.r l

i i

.b i

i;i i

. r i

.1 l

i I

l

.i 4

.[

i

.c

.[

.