Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076J691 + (07:28:36, 15 December 2024)
- ML20076J681 + (07:28:37, 15 December 2024)
- ML20076J671 + (07:28:52, 15 December 2024)
- ML20076J669 + (07:28:53, 15 December 2024)
- ML20076J665 + (07:28:54, 15 December 2024)
- ML20076J660 + (07:29:01, 15 December 2024)
- ML20076J659 + (07:29:02, 15 December 2024)
- RC-94-0271, Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document + (07:29:02, 15 December 2024)
- ML20076J651 + (07:29:09, 15 December 2024)
- ML20076J649 + (07:29:10, 15 December 2024)
- PLA-1735, RO Re Failure of Startup Transformer T10.Cause Under Investigation.Transformer Will Be Disassembled for Repair at Which Time Evaluation of Failure Will Be Conducted. Transformer W/Automatic Tap Changer Will Be Installed + (07:29:11, 15 December 2024)
- ML20076J643 + (07:29:18, 15 December 2024)
- ML20076J641 + (07:29:21, 15 December 2024)
- ML20076J637 + (07:29:22, 15 December 2024)
- ML20076J640 + (07:29:22, 15 December 2024)
- ML20076J636 + (07:29:23, 15 December 2024)
- ML20076J632 + (07:29:24, 15 December 2024)
- ML20076J635 + (07:29:24, 15 December 2024)
- ML20076J630 + (07:29:25, 15 December 2024)
- ML20076J627 + (07:29:25, 15 December 2024)
- ML20076J622 + (07:29:26, 15 December 2024)
- ML20076J626 + (07:29:26, 15 December 2024)
- ML20076J621 + (07:29:27, 15 December 2024)
- ML20076J614 + (07:29:28, 15 December 2024)
- ML20076J619 + (07:29:28, 15 December 2024)
- ML20076J612 + (07:29:29, 15 December 2024)
- ML20076J608 + (07:29:30, 15 December 2024)
- ML20076J604 + (07:29:30, 15 December 2024)
- ML20076J601 + (07:29:31, 15 December 2024)
- ML20076J596 + (07:29:38, 15 December 2024)
- ML20076J589 + (07:29:40, 15 December 2024)
- ML20076J588 + (07:29:41, 15 December 2024)
- ML20076J584 + (07:29:48, 15 December 2024)
- ML20076J579 + (07:29:49, 15 December 2024)
- ML20076J583 + (07:29:49, 15 December 2024)
- ML20076J575 + (07:29:50, 15 December 2024)
- ML20076J571 + (07:29:51, 15 December 2024)
- NRC-94-0098, Forwards Nonproprietary Documents Re Turbine Generator Repairs & Restart from Fourth Refueling Outage + (07:29:51, 15 December 2024)
- ML20076J569 + (07:29:52, 15 December 2024)
- PLA-1798, Interim Deficiency Rept Re Electrical Separation Inside Multiple Div Junction & Pull Boxes.Initially Reported on 830721.Final Design Basis Criteria to Be Set.Next Rept by Sept 1983.Also Reportable Per Part 21 for Unit 2 + (07:29:52, 15 December 2024)
- ML20076J563 + (07:29:53, 15 December 2024)
- ML20076J567 + (07:29:53, 15 December 2024)
- ML20076J559 + (07:29:54, 15 December 2024)
- ML20076J558 + (07:29:54, 15 December 2024)
- ML20076J552 + (07:30:02, 15 December 2024)
- ML20076J551 + (07:30:03, 15 December 2024)
- ML20076J550 + (07:30:03, 15 December 2024)
- 05000333/LER-1983-024-03, /03L-0:on 830727,fire Barrier Penetration Seal in Reactor Bldg Opened & Remained Open Longer than 1 H W/O Establishment of Continuous Fire Watch.No Cause Stated.Watch Established Until Penetration Sealed + (07:30:10, 15 December 2024)
- ML20076J544 + (07:30:11, 15 December 2024)
- ML20076J542 + (07:30:12, 15 December 2024)
- 05000287/LER-1983-009-03, /03L-0:on 830727,HPI Pump 3A Tripped When Manual Start Attempted.Cause Unknown.Pump Reset + (07:30:13, 15 December 2024)