ML20076J571
| ML20076J571 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 06/24/1983 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 4250-L, U-10069, NUDOCS 8307060020 | |
| Download: ML20076J571 (1) | |
Text
4250-L ILLINDIS POWER COMPANY fyy y_znogg CLINTON POWER STATION. P.C. BOX 678 CLINTON, ILLINOls 61727 June 24, 1983 Docket No. 50-461 Mr. James G. Keppler hilliQ et ST(_
_13 i
Regional Administrator
~8 r
Region III Fil kiEJ_._.!
U. S. Nuclear Regulatory Commission WOJ fD' L--..? i.-
799 Roosevelt Road tQ." N+'4 Glen Ellyn, Illinois 60137
+i b 3 w _l yL t - }:
Subject:
Stop Work Order No. 016 f.- -fg Electrical Conduit Installation
Dear Mr. Keppler:
On June 28, 1982 a Stop Work Order was initiated on electrical conduit installation.
A recovery plan was developed to correct the deficiencies associated with the Stop Wo-k Order.
Illinois Power Company has completed the portions of the re-covery plan which were necessary to lift the Stop Work Order.
The appropriate procedures and instructions have been revised and train-ing has been accomplished and documented.
It is requested that you review Illinois Power Company's actions and concur in lifting the Stop Work Order on electrical conduit in-stallation.
Sincerely yours, D.
. Hall Vice President REC /cbs cc:
NRC Senior Resident Inspector Manager - Quality Assurance Director - Office of I&E USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety 8307cdOO20 830624 PDR ADOCK 05000461 A
h*
PDR il
. _ -.