Requests Review of Util Actions & Concurrence in Lifting Stop Work Order 16 Issued on 820628 Re Electrical Conduit Installation.Necessary Portions of Recovery Plan Completed
ML20076J571
Person / Time
Site: Clinton 
Issue date: 06/24/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
4250-L, U-10069, NUDOCS 8307060020
Download: ML20076J571 (1)


Text

4250-L ILLINDIS POWER COMPANY fyy y_znogg CLINTON POWER STATION. P.C. BOX 678 CLINTON, ILLINOls 61727 June 24, 1983 Docket No. 50-461 Mr. James G. Keppler hilliQ et ST(_

_13 i

Regional Administrator

~8 r

Region III Fil kiEJ_._.!

U. S. Nuclear Regulatory Commission WOJ fD' L--..? i.-

799 Roosevelt Road tQ." N+'4 Glen Ellyn, Illinois 60137

+i b 3 w _l yL t - }:

Subject:

Stop Work Order No. 016 f.- -fg Electrical Conduit Installation

Dear Mr. Keppler:

On June 28, 1982 a Stop Work Order was initiated on electrical conduit installation.

A recovery plan was developed to correct the deficiencies associated with the Stop Wo-k Order.

Illinois Power Company has completed the portions of the re-covery plan which were necessary to lift the Stop Work Order.

The appropriate procedures and instructions have been revised and train-ing has been accomplished and documented.

It is requested that you review Illinois Power Company's actions and concur in lifting the Stop Work Order on electrical conduit in-stallation.

Sincerely yours, D.

. Hall Vice President REC /cbs cc:

NRC Senior Resident Inspector Manager - Quality Assurance Director - Office of I&E USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety 8307cdOO20 830624 PDR ADOCK 05000461 A