ILLINOIS POWER 00MPANY 4250-L M
U-10070 CLINTON POWER STATION P.O. BOX 678, CLINTON. ILLINOIS 61727 June 24, 1983 f
- l m
Docket No. 50-461 3m,
- w,
T/Ri
@d, Mr. James G. Keppler Regional Administrator gS,k\\
s hK- '~,
f
'-1 Region III EA U. S. Nuclear Regulatory Commission as i
i 799 Roosevelt Road AL 1
i i / i Glen Ellyn, Illinois 60137 LL I
NTEjTJ1
Subject:
Stop Work Order No. 007 Electrical Cable Tray and Tray Attachment Installation
Dear Mr. Keppler:
On January 18, 1982 a Stop Work Order was initiated on electrical cable tray and tray attachment installation.
A recovery plan was developed to correct the deficiencies associated with the Stop Work Order.
Illinois Power Company received a Confirmatory Action Letter dated January 27, 1982 which documented problems identi.fied during the Nuclear Regulatory Commission's ongoing inspection in the area of the safety related electrical work at the Clinton Power Station.
The letter also stated their understanding of what action Illinois Power has taken and/or will take to resolve those problems.
Illinois Power Company has completed the actions stated in the January 27, 1982 Confirmatory Action Letter and the portions of the recovery plan which are necessary to lift the Stop Work Order.
The appropriate procedures and instructions have been revised and training has been accomplished and documented.
It is requested that you review Illinois Power Company's actions and concur in lifting the Stop Work Order on electrical cable tray and tray attachment installation.
l S
erely yours, O
D.
1*. Hal Vice President l
REC /prh
)[
$$ g60 8307060073 830624 PDR ADOCK 05000461 Q
A PDR
3 n.
Mr.-. James G. Keppler Page 2 cc:
NRC Senior Resident Inspector Manager-Quality Assurance Director-Office of I&E, USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety
}
l 1