') One First NitionIl Pina Chicsgo, uhnois Commonwealth Edison O
E' ' f Addrsss RIply to: Post Offica Box 767 j Chicago. Illinois 60690 June 28, 1983 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Quad Cities Station Unit 1 Response to IE Bulletin No. 83-03 Action Item 5 NRC Docket No. 50-254 Reference (a):
IE Bulletin No. 83 R. C. DeYoung letter to All OLs and cps dated March 10, 1983 (b):
P. L. Barnes to J. G. Keppler letter dated June June 7, 1983
Dear Mr. Keppler:
Reference (a) Action Item 5 requested that the Commonwealth Edison Company provide, within ninety (90) days of completion of Action Item 3, a written report of inspection results.
We have completed Action Item 3 for Quad Cities Unit 1.
The Attachment to this letter provides the results of our inspection.
To the best of my knowledge and belief, the statements contained in the Attachment are true and correct.
In some respects, these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees, consultants and contractors.
Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
lh 0
i]>
s
, Please address any questions that you or your staff may have concerning our response to IE Bulletin No. 83-03 to this of fice.
One (1) signed original with Attachment is being sent directly to the USNRC Document Control Desk in Washington, DC for reproduction and distribution as requested in the Bulletin.
Respectfully, h $ YW P. L. Barnes Nuclear Licensing Administrator Attachment cc:
U.S. NRC, Document Control Desk Washington, DC 20555 RIII Inspectors - D/QC/Z/LS i
SUBSCRIBED and SWORN to before me this n%'6/ day of Orm (
1983 tus.l( L ) -
[-'
a Notary Public 6850N L
,.,s ATTACHMENT COMMONWEALTH EDISON COMPANY Ninety (90) Day Response To IE Bulletin No. 83-03 Action Item 5 for Quad Cities Unit 1, NRC Docket No. 50-254 i
As required by Reference (a) the Quad Cities Unit 1 Diesel Generator Cooling Water Pump (DGCWP) discharge check valve 1-3999-86 was inspected during a maintenance outage on May 21, 1983.
The valve was found free to swing to fully open and fully closed positions, but the pin area was found to be worn.
A new check valve and gaskets were installed.
The DGCWP was tested for operability on the same day.