Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000389/LER-1983-030-03, /03L-0:on 830610,channel D Low Component Cooling Water Reactor Coolant Pumps Spuriously Started Causing Timing to Trip.Caused by Spikes from Flow Transmitter. Transmitter Vented + (07:00:06, 15 December 2024)
- ML20077B050 + (07:00:07, 15 December 2024)
- ML20077B043 + (07:00:08, 15 December 2024)
- 05000259/LER-1983-034-03, /03L-0:on 830613,standby Gas Treatment Sys Train B Inoperable Due to Heaters Being Unavailable in Automatic. Caused by Incorrect Damper Adjustment.Damper Readjusted + (07:00:14, 15 December 2024)
- ML20077B029 + (07:00:15, 15 December 2024)
- 05000293/LER-1983-035-03, /03L-0:on 830610,three of Four Motor Operator Mounting Cap Screws Found Backed Out of Core Spray Test Valve MOV 1400-4A.Caused by Insufficient Cap Screw Torque. Screws Coated & Torqued + (07:00:21, 15 December 2024)
- ML20077A998 + (07:00:22, 15 December 2024)
- 0CAN068317, Responds to Request for Addl Info Re Violation Noted in IE Insp Rept 50-313/83-03 Concerning Failure to Follow Requirements for Changes to Refueling Shuttle Procedure. Procedure Modified to Detail Sequence Changes + (07:00:23, 15 December 2024)
- ML20077A978 + (07:00:29, 15 December 2024)
- ML20077A974 + (07:00:34, 15 December 2024)
- AECM-83-0165, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-416/82-78.Corrective Actions:Surveillance Conducted on 821125,w/independent Verification.Valves Positioned & Locked Per Instructions.Training Scheduled + (07:00:51, 15 December 2024)
- ML20077A954 + (07:00:51, 15 December 2024)
- AECM-83-0330, Submits Supplemental Response to NRC Re Violations Noted in IE Insp Rept 50-416/82-78.Corrective Actions:Security Post Established to Conduct Insps of Control Room Cabinets Every 4 H & All Activities Logged + (07:00:52, 15 December 2024)
- ML20077A946 + (07:00:52, 15 December 2024)
- ML20077A938 + (07:00:53, 15 December 2024)
- ML20077A939 + (07:00:53, 15 December 2024)
- ML20077A919 + (07:00:54, 15 December 2024)
- ML20077A926 + (07:00:54, 15 December 2024)
- NG-94-3575, Request for TS Change (RTS-267),replacing Instrument Setpoint W/Ref to Appropriate Citation in Offsite Dose Assessment Manual & Modifying Operability Requirement & Required Action for Inoperable Offgas Vent Stack RMs + (07:00:55, 15 December 2024)
- ML20077A912 + (07:00:56, 15 December 2024)
- ML20077A900 + (07:00:56, 15 December 2024)
- ML20077A896 + (07:00:57, 15 December 2024)
- ML20077A899 + (07:00:57, 15 December 2024)
- ML20077A894 + (07:00:58, 15 December 2024)
- BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 + (07:00:59, 15 December 2024)
- ML20077A890 + (07:00:59, 15 December 2024)
- PLA-1748, Second Interim Part 21 Rept Re Inadequacies in Bechtel Design Verification of Max Circuit Lengths of Low Voltage Power & Control Cables.Initially Reported on 821215.Next Rept by 831031 + (07:01:00, 15 December 2024)
- ML20077A885 + (07:01:00, 15 December 2024)
- ML20077A863 + (07:01:10, 15 December 2024)
- ML20077A861 + (07:01:12, 15 December 2024)
- ML20077A856 + (07:01:12, 15 December 2024)
- ML20077A851 + (07:01:13, 15 December 2024)
- ML20077A839 + (07:01:27, 15 December 2024)
- ML20077A835 + (07:01:27, 15 December 2024)
- ML20077A830 + (07:01:28, 15 December 2024)
- ML20077A827 + (07:01:28, 15 December 2024)
- ML20077A820 + (07:01:36, 15 December 2024)
- ML20077A811 + (07:01:47, 15 December 2024)
- ML20077A807 + (07:01:50, 15 December 2024)
- ML20077A806 + (07:01:51, 15 December 2024)
- ML20077A799 + (07:01:52, 15 December 2024)
- ML20077A793 + (07:01:53, 15 December 2024)
- 05000334/LER-1983-002-03, 138-kV Bus 1 Lost.Caused by Inadvertent Operation of Bus back-up Timer Relay 62-Z41. Sbfu & Sru Relays Interchanged,Sbfu Relays Modified & Physical Barrier Around Sbfu Switch Installed + (07:01:54, 15 December 2024)
- 05000382/LER-1994-015-01, :on 940916,boric Acid Addition to RCS Occurred. Caused by Personnel Error Due to Lack of Self Checking. Primary Nuclear Plant Operator Counseled Re Improving Human Performance Program + (07:01:56, 15 December 2024)
- 05000259/LER-1983-032-03, /03L-0:on 830612,during Refueling Outage,Trouble Alarm Came in for Control Bay Elevation 593 Fire Protection Panel 1-25-325,zone 14.Caused by Power Loss to Some Smoke Detectors Due to Loose Wires + (07:01:58, 15 December 2024)
- ML20077A782 + (07:01:59, 15 December 2024)
- 05000259/LER-1983-030-03, /03L-0:on 830612,during Refueling Outage,Stack Gas Sample Pump B Tripped Making Both Stack Monitoring Channels Inoperable.Caused by Overcurrent.Pump B Replaced.Failures Being Investigated + (07:02:01, 15 December 2024)
- ML20077A779 + (07:02:01, 15 December 2024)
- ML20077A775 + (07:02:02, 15 December 2024)
- 05000389/LER-1983-029-03, /03L-0:on 830610,while Performing Power Ascension Testing,Auxiliary Feedwater Pump C Failed to Reach Rated Speed.Caused by Erroneous Electrical Overspeed Trips Due to Noise Seen by Air Pax Series 300 Tachometer + (07:02:05, 15 December 2024)
- 05000316/LER-1983-054-03, /03L-0:on 830623,during Normal Operations,Fire Door 386 Between Quad 2 & NESW Valve Gallery Failed to Latch Properly.Caused by Bent Latch Plate.Plate Removed, Straightened & Reinstalled + (07:02:18, 15 December 2024)
- DCL-94-250, Forwards Public Version of Revised Corporate Erpips, Including Rev 13 to 1.1,Rev 8 to 1.2,Rev 5 to 3.1,Rev 12 to 3.2,Rev 6 to 3.5,Rev 6 to 3.6,Rev 14 to 4.3. & Rev 7 to 4.8 + (07:02:19, 15 December 2024)