MISSISSIPPI POWER & LIGHT COMPANff','f'o gr..
Helping Build Mississippi Q
- llpy, N
P. O. BOX 1640, J ACKSON MISSISSIPPI g205 Aff)
July 8, 1983 k /g p ll 2g
'*" ",,; n ::,1, 7 '"
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Regional Administrator
Dear Mr. O'Reilly:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Special Report 83-051/0 - PGCC Fire Protection Systems Removed From Service AECM-83/0378 Beginning on May 26, 1983, PGCC Halon fire protection systems were removed from service as needed to correct differences between the design documents and the as-built configuration. An LCO was entered in accordance with Technical Specification 3.7.6.4.
All identified differences and the corrective actions will be identified on Material Non-Conformance Report 423-83.
All hardware mcdifications have been completed and retested satisfactorily. The LCO will be lif ted when the work package is closed. This is submitted as a Special Report as the LCO time limit of 14 (fourteen) days was exceeded.
Yours truly, f
- h
}
JPM: sap cc:
Mr. J. B. Richard Mr. R. B. McGehee
<m Mr. T. B. Conner Mr. G. B. Taylor B8 no Mr. Richard C. DeYoung, Director L$
Office of Inspection & Enforcement
{
U. S. Nuclear Regulatory Commission go Washington, D. C.
20555 Ch g pk g4 Document Control Desk om U. S. Nuclear Regulatory Commission
@@m Washington, D. C. 20555
/ fg F Member Middle South Utilities System
/
1