e TENNES V% ELE UTHORITY CH ATTANOOd A.'TENNES$DJf 37401 400 Chestnut Street Tower II M IO Al').* gly 14, 1983 BLRD-50-438/83-40
.BLRD-50-439/83-34 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - FIELD CABLES NOT TERMINATED IN PENETRATIONS PROPERLY - BLRD-50-438/83-40, BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector L. Watson on June 14, 1983 in accordance with 10 CFR 50.55(e) as NCRs BLN 2383, 2384, 2385, and 2395. Enclosed is our first interim report. We expect to submit our next report by December 29, 1983 If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, anager Nuclear Licensing Enclosure oc (Enclosure):
Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 OFFTCI AL COPYk 9 K/
8307220437 830714 PDR ADOCK 05000438 S
)
An Equal Opportunity Employer
o ENCLOSURE a,
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FIELD CABLES NOT TERMINATED IN PENETRATIONS PROPERLY BLRD-50-438/83-40, BLRD-50-439/83-34 NCRs 2383, 2384, 2385, AND 2395 10 CFR 50.55(e)
FIRST INTERIM REPORT Description of Deficiency NCHs 2383, 2384, and 2385 identify that in several electrical cable penetration terminations the correct application of Raychem tubing, end caps, or cable breakouts was not adhered to per TVA drawings. This has resulted in incorrect lengths of Raychem tubing on cable splices, insufficient distance between Raychem 2-and 3-point cable breakouts, and no end caps on spare conductor.a.
NCR 2395 was issued to identify the 6eneric implication of the three previously mentioned NCRs and a possible generic deficiency in the electrical quality control (EQC) training and inspection program. The apparent cause of these deficiencies is a lack of proper interpretation of TVA drawings by TVA Construction (CONST) craft and EQC inspectors.
Interim Progress NCRs 2383 and 2384 address the inadequate lengths of Raychem tubing. TVA has reinspected the affected cable penetration tersimations and is presently investigating the possibility of using the terminations "as is."
NCR 2385 addresses the lack of Raychem end caps on spare cable penetrations. TVA's Division of Engineering Design (EN DES) is reviewing the recommendation that a work release be generated to check all previous terminations and install end caps on spare conductors as required per applicable TVA drawings. TVA CONST craft personnel and EQC inspectors will be retrained, per Bellefonte Nuclear Plant (BLN) Quality Control Procedure (QCF) 10.29, in the proper application of termination procedures per TVA drawings.
l
^~
.