Interim Deficiency Rept Re HPCS Diesel Generator Electrical Panels Supplied by Ge.Initially Reported on 830615.Ring Lug Terminations Will Be Replaced.Next Rept Will Be Submitted by 840406
ML20077A779
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/15/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8307220434
Download: ML20077A779 (2)


Text

r 3:

I G P.

b L L 'f t !. !! n !o!

><1

'l>is n,

ei r-33 4

.s L

P.o. Box 5000 - CLEVELAND ohio 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG.

- 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCMAR yugy g$, ggg3 Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 HPCS Local Panels E22-S001

[RDC 75(83)]

Dear Mr. Keppler:

This letter serves as an interim report pursuant to 10CFR50.55(e) on the potential significant deficiency concerning the High Pressure Core Spray (HPCS) Diesel Generator Electrical Panels supplied to Perry Nuclear Power Plant by the General Electric Company (CE).

Mr. F. Jablonski of your office was notified on June 15, 1983, by Mr. M. Kritzer for The Cleveland Electric Illuminating Company (CEI) that this potential deficiency was being evaluated by CEI.

This letter contains a description of the deficiency, planned corrective action, and the scheduled date for submittal of our final report.

Description of Deficiency A number of nonconforming conditions attributed to poor workmanship were identified in the HPCS Diesel Electrical Panels.

Some examples of nonconforming items identified in the two panels (1 per unit) are improperly crimped ring lug terminations, temporary wire labels still present, missing inspection covers, no I.D. on terminal strips, paint overspray, broken wire strands and/or no insulation of the barrel to connection point, use of unapproved cable cleats, and the use of unapproved tape. A complete description of the nonconforming aonditions is available on Project Nonconformance Repoit'(NR)

P033-1650 and Gt Field Deviation Disposition Request (FDDR) KL1-735 for the Unit 1 panel and Project NR P033-1651 and GE FDDR KL2-591 for the Unit 2 panel.

9

%?'9 \\\\\\

0307220434 830715 g

PDR ADOCK 05000440 g

PDR JUL 18 ggg3

Mr. J:mes C. Kappist July 15, 1983 Corrective Action The ring lug terminations will be replaced in the Unit 1 and 2 panels in accordance with GE FDDR's KL1-735 and KL2-591, respectively. The remaining items identified on the Project NRs will be reworked or repaired in accordance with the engineering dispositions for NR's P033-1650 and P033-1651.

Our next report on this subject will be submitted by April 6,1984.

incerely, Murray R.

elman Vice President Nuclear Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

- -.