ML20077A938
| ML20077A938 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 07/08/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-370-83-27, NUDOCS 8307220499 | |
| Download: ML20077A938 (1) | |
Text
r a
i r
- y, ;
f NRC DEGION "I AgSup: power), MPANY
,I ' '
'A.
e.o. nox aatso CHARLOTTE, N.C. 28242 RAL H. TUCKER res.zenoxz
. :;=_
83 JUL 15 P i: 53 July 8, 1983 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II l
101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 2 Docket No. 50-370
Dear Mr. O'Reilly:
Reportable Occurrence Report R0-370/83-27 was to have been submitted by July 8, 1983. This 30 day reportable occurrence (per T.S. 6.9.1.11) concerns T.S. 3.6.3, "The containment isolation valves specified in Table 3.6-2 shall be operable with isolation times as shown in Table 3.6-2," which was violated on June 9, 1983.
At this time investigation of the incident and preparation of a report are not yet complete. The report will be submitted by July 22, 1983.
Very truly yours,
-# 3. 6 4 ~ g g;y Hal B. Tucker PBN:j fw cc: Document Control Desk Records Center U. S. Nuclear Regulatory Commission Institute of Nuclear Power Operations Washington, D. C.
20555 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Mr. W. T. Orders
/
NRC Resident Inspector s
McGuire Nuclear Ststion l
>l i
1 1
OFFICIAL COPYll n
g' ) %
8307220499 830708
)O PDR ADOCK 05000370-1 J
S PDR e
e
_