Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079J099 + (04:26:59, 15 December 2024)
- ML20079J095 + (04:27:03, 15 December 2024)
- ML20079J091 + (04:27:04, 15 December 2024)
- RBG-48012, Submittal of Emergency Implementing Procedure Revision + (04:27:04, 15 December 2024)
- ML20079J089 + (04:27:05, 15 December 2024)
- ML20079J090 + (04:27:05, 15 December 2024)
- 05000260/LER-1982-037, Forwards LER 82-037/03L-0 + (04:27:06, 15 December 2024)
- ML20079J087 + (04:27:06, 15 December 2024)
- 3F0184-20, Forwards Second Quarterly Progress Rept,Crystal River Studies & Plan of Study Summary Per Tech Specs,App B, Part Ii,Section 3.2,submitted to EPA + (04:27:07, 15 December 2024)
- ML20079J069 + (04:27:08, 15 December 2024)
- ML20079J072 + (04:27:08, 15 December 2024)
- ML20079J066 + (04:27:12, 15 December 2024)
- ML20079J063 + (04:27:13, 15 December 2024)
- ML20079J060 + (04:27:13, 15 December 2024)
- ML20079J051 + (04:27:14, 15 December 2024)
- ML20079J043 + (04:27:14, 15 December 2024)
- 05000316/LER-1983-123-03, /03L-0:on 831220,output from Bistable 2FB-512B Fluctuated at Trip & Reset Points.Cause Not Stated.Bistable Replaced + (04:27:16, 15 December 2024)
- NLS8400039, Responds to Re Use of Topical Rept Nedo 20566, GE Analytical Model for Loss-of-Coolant Analysis in Accordance W/10CFR50,App K. Rept Provides Basis for Analysis of Core Standby Cooling Sys & Initial LOCA + (04:27:17, 15 December 2024)
- ML20079J037 + (04:27:17, 15 December 2024)
- ML20079J035 + (04:27:18, 15 December 2024)
- 05000316/LER-1983-123, Forwards LER 83-123/03L-0 & LER 83-111/03X-1 + (04:27:22, 15 December 2024)
- ML20079J032 + (04:27:22, 15 December 2024)
- 0CAN018409, Forwards Documentation Supporting 831230 Request for Exemption from Requirement for full-scale Emergency Planning Exercise in 1984,per Region IV Emergency Planning Staff Request + (04:27:23, 15 December 2024)
- ML20079J027 + (04:27:23, 15 December 2024)
- ML20079J021 + (04:27:24, 15 December 2024)
- 05000346/LER-1982-062-03, /03L-0:on 821117,discharge Check Valve CV-186 Stuck During ST 5065.02,rendering Hydrogen Dilution Blower 1-1 Inoperable.Caused by Design/Fabrication Error.New Valve Installed + (04:27:26, 15 December 2024)
- 05000346/LER-1982-062, Forwards LER 82-062/03L-0 + (04:27:27, 15 December 2024)
- ML20079J001 + (04:27:31, 15 December 2024)
- ML20079H999 + (04:27:32, 15 December 2024)
- ML20079H998 + (04:27:32, 15 December 2024)
- ML20079H991 + (04:27:33, 15 December 2024)
- ML20079H992 + (04:27:33, 15 December 2024)
- ML20079H986 + (04:27:34, 15 December 2024)
- ML20079H985 + (04:27:35, 15 December 2024)
- 05000315/LER-1983-125-03, /03L-0:on 831212,one safety-related Fire Door Intentionally Made Inoperable to Perform Corrective Maint on Door Frame.Renovation Project Includes 84 Fire Doors. Tentative Completion Date Is Late 1984 + (04:27:36, 15 December 2024)
- BSEP-84-0052, RO 2-SR-83-33:on 831206,specified 7-day Time Frame for Limiting Condition for Operation Exceeded During Performance of 125-volt Battery Capacity Test.Test Conducted W/Control Bldg Fire Doors 108 & 114 Open.Fire Watch Maintained + (04:27:38, 15 December 2024)
- ML20079H980 + (04:27:38, 15 December 2024)
- ML20079H979 + (04:27:39, 15 December 2024)
- 05000416/LER-1983-191-03, /03L-0:on 831217,standby Fresh Air Unit a Placed in Isolated Mode to Meet Tech Spec Action Requirements Due to Planned Div 2 Electrical Outage on 831210.Caused by Operator Error.Procedures Revised + (04:27:40, 15 December 2024)
- ML20079H971 + (04:27:41, 15 December 2024)
- ML20079H968 + (04:27:42, 15 December 2024)
- ML20079H969 + (04:27:42, 15 December 2024)
- ML20079H966 + (04:27:43, 15 December 2024)
- ML20079H967 + (04:27:43, 15 December 2024)
- 05000293/LER-1983-063-01, /01T-0:on 831219,during Insp of Recirculation Sys Piping Welds,Two Indications Found in 12-inch Lines.Cause Tentatively Attributed to Intergranular Stress Corrosion Cracking.Ring Header Will Be Replaced + (04:27:45, 15 December 2024)
- ML20079H958 + (04:27:46, 15 December 2024)
- ML20079H953 + (04:27:46, 15 December 2024)
- ML20079H952 + (04:27:47, 15 December 2024)
- ML20079H951 + (04:27:47, 15 December 2024)
- 05000416/LER-1982-140-99, /99X-0:on 821112,during Shutdown,Fire Door 1A213 (Entrance to Valve Room 1A220) Blocked Open for Hose Which Supported Local Leak Rate Testing.Fire Watch in Effect.Fire Door Secured Upon Test Completion + (04:27:49, 15 December 2024)
- 05000302/LER-1983-063-01, /01T-0:on 831226,while Performing Routine Surveillance,Level Indicators FS-1-LI & FS-2-LI & Sensing Lines for Fire Svc Tanks Found Frozen.Caused by Unusually Cold Weather.Water Added to Tanks + (04:27:51, 15 December 2024)