ML20079J037
| ML20079J037 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/17/2020 |
| From: | Bates A Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML20079J037 (2) | |
Text
SOUTHERN CALIFORNIA EDISON~
An EDISON INTERNATIONAL'g, Company ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 March 17, 2020
Subject:
Docket Nos. 50-206, 50-361 and 50-362 Nuclear Property Insurance Al Bates Manager, Regulatory Affairs 10 CFR 50.54 San Onofre Nuclear Generating Station Units 1, 2, and 3
Reference:
Letter from A. E. Bates, SCE, to U.S. Nuclear Regulatory Commission, dated April 1, 2019,
Subject:
Nuclear Property Insurance, San Onofre Nuclear Generating Station Units 1, 2, and 3
Dear Sir or Madam:
This letter is the report required by 10 CFR 50.54(w)(3). The following Nuclear Property and Decontamination Liability Insurance will be in effect for the San Onofre Nuclear Generating Station on the April 1, 2020 policy renewal date:
Policy (Amount)
Primary Property and Decontamination Liability Insurance Policy
($130 million)
Source Nuclear Electric Insurance Limited (NEIL Primary)
Please be advised that the revised coverage limit became effective on April 1, 2019 subsequent to the preparation of the referenced April 1, 2019 letter.
The policy providing coverage mentioned above complies with 10 CFR 50.54(w), including provisions for the insurance proceeds to be prioritized for dedicated reactor stabilization/safety and then for decontamination of the site.
There are no commitments contained in this letter.
HD D ~
NMssol N /lt2-1vrv15 S
Document Control Desk If you have any questions or require additional information, please contact me at 949-368-6945.
cc:
S. Morris, Regional Administrator, NRC Region IV R. Chang, NRC Project Manager, San Onofre Units 1, 2, and 3