ML20079H958
| ML20079H958 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 01/18/1984 |
| From: | SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | |
| Shared Package | |
| ML20079H954 | List: |
| References | |
| NUDOCS 8401240143 | |
| Download: ML20079H958 (1) | |
Text
CONTAINMENT SYSTEMS 3/4.6.5 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS LIMITING CONDITION FOR OPERATION 3.6.5.1 Two independent containment hydrogen monitors shall be OPER' BLE.
A APPLICABILITY:
MODES 1 and 2.
ACTION:
a.With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The previsiens Of Specificatien 0.0.4 &re net applicable fer entry inte
"^de 2 fp- 't-it1:1 critic:1ity, eut nioni tors s no Ne feskore a$ l*QG Y
- b. With bo+h hydro A 6 L E s ta f u s es;f eral f b e'*1 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in a f i
monHor to OPE l ca sf lJ oT ST A NDBV ui f hia +he ne xt 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.5.1 Each hydrogen monitor shall be demonstrated OPERABLE by the performance of 'an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days, and at least
-once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gas containing 19.8 +0.1 volume percent hydrogen, balace nitrogen.
l l
l t
l I
r 8401240143 940118 PDR ADOCK 05000395 i
P PDR l
SUMMER - UNIT 1 J/4 6-21 Amendment No. 4
(
(.
a
>