Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20081B475 + (13:21:35, 14 December 2024)
- ML20081B472 + (13:21:36, 14 December 2024)
- 1CAN038401, Forwards Supplemental Info Re Core Exit Thermocouples (CET) for Inadequate Core Cooling Interim Operation,Per 840210 Telcon.Cet Sys Complies W/Most NUREG-0737,Item II.F.2 Requirements + (13:21:37, 14 December 2024)
- ML20081B470 + (13:21:37, 14 December 2024)
- ML20081B467 + (13:21:38, 14 December 2024)
- 05000395/LER-1995-001, :on 950210,potential Loss of Automatic Engineered Safety Features Actuation Due to High Energy Line Break in Turbine Bldg Occurred.Nonconformance Notice Was Written to Address Degraded Condition + (13:21:40, 14 December 2024)
- ML20081B460 + (13:21:41, 14 December 2024)
- ML20081B462 + (13:21:41, 14 December 2024)
- JPN-95-012, Responds to NRC on Radiological Concerns & Industrial Safety Deficiencies + (13:21:42, 14 December 2024)
- ST-HL-AE-5036, Application for Amends to Licenses NPF-76 & NPF-80,revising Ref in TS 6.9.1.6.b for Analytical Method Used to Determine Core Operating Limits for Heat Flux Hot Channel Factor for TS 3.2.2 + (13:21:42, 14 December 2024)
- ML20081B439 + (13:21:43, 14 December 2024)
- ML20081B435 + (13:21:44, 14 December 2024)
- ML20081B433 + (13:21:45, 14 December 2024)
- 05000370/LER-1995-001-02, :on 950208,Unit 2 Containment Penetrations Have Been Inoperable in Past Due to Failed Equipment.Caused by Unanticipated Environ Interaction.Replaced Affected Piping + (13:21:47, 14 December 2024)
- JAFP-95-0122, Responds to NRC Re Violation Noted in Insp Rept 50-333/95-03 on 950123-27.Corrective Actions:Portable Alarming Area Radiation Monitor RM-16 Added to Daily Insp & RP Instrument Procedure RP-INST-103 Being Updated + (13:21:48, 14 December 2024)
- ML20081B429 + (13:21:48, 14 December 2024)
- ML20081B428 + (13:21:49, 14 December 2024)
- ML20081B424 + (13:21:50, 14 December 2024)
- ML20081B422 + (13:21:50, 14 December 2024)
- 05000348/LER-1995-003, :on 950206,determined That Train a of Ssps Potentially Susceptible to Failure in Event of Postulated High Energy Steamline Break.Caused by Spss Design. Maintenance/Surveillance Activities Restricted + (13:21:55, 14 December 2024)
- ML20081B407 + (13:21:56, 14 December 2024)
- ML20081B417 + (13:21:56, 14 December 2024)
- ML20081B381 + (13:21:57, 14 December 2024)
- ML20081B377 + (13:21:57, 14 December 2024)
- 05000361/LER-1983-123-03, /03L-0:on 830913,w/Unit 2 in Mode 1 & Unit 3 in Mode 3,insp of Electrical Penetrations Revealed Two Holes in Penetration Seals in Auxiliary Bldg Control Area.Caused by Procedural Deficiencies During Const + (13:21:59, 14 December 2024)
- ML20081B366 + (13:22:00, 14 December 2024)
- 05000362/LER-1983-065-03, /03L-0:on 830905 & 12,w/unit in Mode 2 at Zero Power,High Range in-containment Radiation Monitor 3RI-7820-1 Found in Failed Low Condition & Declared Inoperable.Caused by Faulty Electrical Cable Penetration Path + (13:22:02, 14 December 2024)
- ML20081B359 + (13:22:03, 14 December 2024)
- 05000373/LER-1983-116-03, /03L-0:on 830926,control Rod Drive (CRD) at Core Location 30-19 Indicated Overtravel When Withdrawn to Full Out Position.Caused by Inner Filter Retainer Spring Damage Due to Excessive Crud Buildup + (13:22:04, 14 December 2024)
- ML20081B348 + (13:22:05, 14 December 2024)
- HL-4771, Forwards Rev 13B to FSAR for Ei Hatch Nuclear Plant & Rev 10B to Fire Hazards Analysis & Fire Protection Programs for Plant Hatch Units 1 & 2 + (13:22:06, 14 December 2024)
- 05000249/LER-1983-032-03, /03L-0:on 830921,valve LPCI 1501-11B Closed During Installation of Terminal Jumper.Caused by Technician Inadvertently Placing Terminal Jumper on 903-3 Panel Instead of 903-10 Panel + (13:22:08, 14 December 2024)
- ML20081B340 + (13:22:09, 14 December 2024)
- 05000361/LER-1983-124-03, /03L-0:on 830917 & 23,control Element Assembly Calculator Declared Inoperable Due to Spurious Position from Control Element Assembly 20.Caused by Defective Board & Connector.Equipment Replaced + (13:22:10, 14 December 2024)
- ML20081B333 + (13:22:11, 14 December 2024)
- NG-83-3408, Discusses Scram Discharge Vol short-term Mods in Response to IE Bulletin 80-17.Water Added to Scram Discharge Vol & Vent Procedures & Drain Valve Operability & Closure Time Test Changed from Quarterly to Monthly + (13:22:12, 14 December 2024)
- ML20081B328 + (13:22:16, 14 December 2024)
- ML20081B330 + (13:22:16, 14 December 2024)
- ML20081B323 + (13:22:17, 14 December 2024)
- ML20081B325 + (13:22:17, 14 December 2024)
- 05000362/LER-1983-076-03, /03L-0:on 830907,during Shift Surveillance, Control Element Assembly Calculator 2 Declared Inoperable. Caused by Poorly Seated Circuit Board.Circuit Boards Resealed + (13:22:19, 14 December 2024)
- ML20081B314 + (13:22:20, 14 December 2024)
- ML20081B318 + (13:22:20, 14 December 2024)
- 05000362/LER-1983-073-01, /01T-0:on 830929,charging & Letdown Flows Isolated by Closing Manual Isolation Valves S31208MU084 & S31208MU091 in Violation of Limiting Conditions of Operation.Caused by Personnel Error.Valves Opened on 830930 + (13:22:28, 14 December 2024)
- AECM-83-0668, Final Deficiency Rept PRD-83/12 for Unit 1 & Interim Rept for Unit 2 Re Failure of Agastat GP Series Relays to Switch. Initially Reported on 830902.Deficiency Reportable Per Part 21 for Unit 1.Investigation Ongoing for Unit 2 + (13:22:30, 14 December 2024)
- ML20081B281 + (13:22:30, 14 December 2024)
- ML20081B278 + (13:22:31, 14 December 2024)
- ML20081B277 + (13:22:31, 14 December 2024)
- ML20081B276 + (13:22:32, 14 December 2024)
- 05000362/LER-1983-064-03, W/Unit in Mode 2,ex-core Logarithmic Power Safety Channel C Declared Inoperable & on 830918,channel B Declared Inoperable.Caused by Failed Cable Connectors.Connectors Replaced + (13:22:33, 14 December 2024)
- ML20081B274 + (13:22:34, 14 December 2024)