ML20081B433
| ML20081B433 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/10/1983 |
| From: | Schuyler J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML16340D938 | List: |
| References | |
| NUDOCS 8310270572 | |
| Download: ML20081B433 (3) | |
Text
Q.
j
/
9 CoF" PACIFIC GAS AND E LE C T RI C C O M PANY 77 BEALE STREET, S AN FR ANCISCO, C ALIFORNI A 94106 TELEPHON E (415) 781-4211 t
i October 10, 1983 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-76 Docket No. 50-323 Diablo Canyon Units 1 and 2 Emergency Plan and Implementing Procedures Updates
Dear Mr. Martin:
Ig accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, we are submitting one copy of the updates to the detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan, and one copy of the updates to the Corporate Emergency Response Plan and several of its Implementing Procedures. Updates for both plans are as listed in Attachment 1.
Concurrently, two copies of each update are being submitted to the Document Control Desk.
Some of the updates contain privacy / proprietary information. This privacy / proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Attachment 2.
Kindly acknowledge receipt of the above material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Sincerely, J. G. Schuyler Attachments cclw/att:
R. Fish, NRC (Region Y)
Service List 1
cc w/o att:
G. W. Knighton i
g 7
9310270572 831025 PDR ADOCK 05000275 F
PDR m
f\\
y.
/
ATTACHMENT 1 Updates Included In This Submittal DIABLO CANYON EMERGENCY PLAN IMPLEMENTING PROCEDURES Volume 3A EP G-5, On-The-Spot Change EP OP-0, On-The-Spot-Change EP OP-1, On-The-Spot Changes (2)
EP OP-3A, On-The-Spot Change EP OP-8, Revision 7 EP OP-9, On-The-Spot Change VOLUME 33 EP EF-5, On-The-Spot Change CORPORATE EMERGENCY RESPONSE PLAN Revision 02 CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES 3.1, Revision 2 3.2, Revision 3 3.3, Revision 2 3.5, Revision 2 3.7, Revision 1 4.3, Revision 3 4.4, Revision 2 4.5, Revision 2 4.6, Revision 2 0012G
f'
~. -...
ATTAC}NENT 2 Location of Proprietary / Privacy Information Corporate Emergency Response Plan Procedure:
Pages 3.1, Revision 2 Attachment'2, Page 1 of 1;, Pages 1 & 2 of 2;, Page 1 of 1;, Pages 1, 3 & 4 of 4 3.2, Revision 3, Pages 1 & 2 of 2;, Pages 1 & 2 of 2;, Page 1 of 1;, Page 1, 3 & 4 of 4 3.3, Revision 2, Page 1 of 1;, Pages 1 & 2 of 2;, Pages 1, 3 & 4 of 4 3.5, Revision 2, Pages 1 through 3 of 3;, Pages 1 & 2 of 2;, Pages 1, 3 & 4 of 4 3.7, Revision 1, Page 1 of 1;, Pages 1 & 2 of 2;
- , Pages 1, 3 & 4 of 4 4.3, Revision 3, Pages 1 through 6 of 6;, Pages 1 & 2 of 2;, Pages 1, 3 & 4 of 4 4.4, Revision 2, Pages 1 through 3 of 3;, Page 1 of 1;, Pages 1, 3 & 4 of 4 4.5, Revision 2, Pages 1 & 2 of 2;, Page 1 of 1;, Pages 1, 3 & 4 of 4 4.6, Revision 2, Pages 1 & 2 of 2; l, Pages 1 through 3 of 3;, Pages 1, 3, & 4 of 4 0012G r~-
,.,--..,,.,.-,n.
~
,.Q,,,