ML20081B417
| ML20081B417 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/02/1984 |
| From: | LOUISIANA POWER & LIGHT CO. |
| To: | NRC |
| Shared Package | |
| ML20081B415 | List: |
| References | |
| FOIA-83-508 NUDOCS 8403090038 | |
| Download: ML20081B417 (2) | |
Text
r s,
~
^
('
0$
fb A,,5 Y
.2 &
ad G
LouislANA PCWE R & LiG H T/ INTER OPPICE COAAesPONDENCE MNC I
l
Dear strs,
Nre are sorteus probicas at Waterford 111 that sunt be evaluated by the y
N2C which requires tsmediate action.
f*e Ebasco and I.F4L management has f ailed to address and resolve the dettetencies identified by many perseasel including the OA documentatten reytowers that went te de a' }eb right without a
prer'aill. % agesmat has been taking 44ctatena that do not reflect the ij presently approved or any other CA pecstant. They are highly influenced ~by M
Const ructice. Management and LP&t Start-Up.
'd
[
The NaC can easily reccentaa the probleum if they were reel, and evaluated
- f a paritcular subject.
ta my esperience, this project has similar erehteds r j
(Jentified at Itamar, Marble Rill. STF. and Midland.
4 1
Areas of concern that require Lavestigation:
1 1
(1) Osera deficiencies identified durtas the documentation review of all castracts.
i (2) laspectors Qualif teations (ANS154$.2.6 - 197)) - previous )
f fication for related experience, and falafficatios of renesse,ob vert.
s.
Ofercury, peabody, 511ae T&B, Culf, and T&M) sj (1) 41teratiens la GA docunnstation' (Ah1T 545.2.9) - unauthorised aed ne i
substantiating evidence for changes.
Y
.f f4) 5tructura! '4elding and Bolting - both in the field and documentatten.
j 1
($) Ranger def tetencies at T48. Mercurv & F4M.
)
(4; Occumentation ref:ecting the as installed configuration (IJaproper As-j 3uitts).
4 L
(?) NCR's taproperly dispositioned and cleoed without substantiating evidence of corrective action.
1
- 15) Intenidation of QA/QC personnel Ofercurv. 743. and Ebasco)
- 6) Marrving the QA decimentatten between the contractor and E5FA.
There is a long list of items that could be listed, but I thtak esybe yew get Ins general idea. If vou des't anybe " GAP" (!enator L'dall) would be interested.
j s
- )
~
LYON83-508 PDR J
.n
_a
.A (e 'j ']
Fast 2 1 :
9:- d 3 y
p/
this inforsation stri:kly toof tdatial vichta the.NRC Department sad y
j O g
j g inform either thosco or LPet.
v bac; k 4i&
4)r e
y r
t, n e E /
t 1, z. 1y 31 ped,
?di f iM d
I
" Concerned Cit taan" -
y 4
I 1$)
fd.iv CC ioo Coppg, SAP % g g,,
",f w~.. g,
4~ A d
ac
~
i t
e L,o9 u 4 4;g l
{
i 6:
, d ij
-[d t
't$
!c, i-;!
4 y
k;.
a 'la
Lyo N A N D K U R Z ATToR t4E YS AT L Aw tl22 CON N ECTl' UT Avttau t. N W WASHINGTCfJ. D C 20036 v r K E DE Ric LYor, VIRGINI A OrricE JAMESS.MUR2 H7 NORTM F AIRFAs STRECT ALE Jt ANDRIA. VIRGIN t A 22384 (703, 836-530e August 25, 1983 fh OF INIV%(ATX)N M REQUEST Nuclear Regulatory F ZA -D-50 8 Commission Washing ton, D.C.
20555
- 'M [dA 'b Attn:
Freedom of Information Officer Re:
Freedom of Information Act Request Gentlemen:
In accordance with the provisions of the Freedom of Information Act, 5 U.S.C. Section 552, we hereby request the following:
1.
All documents including and relating to the August 11, 1981 interim report of the Advisory Committee on Reactor Safeguards concerning Louisiana Power and Light Company's (LP&L) Waterford III nuclear power plant.
2.
All documents including and relating to the December 6, 1982 report of the Nuclear Regulatory Commission concerning LP&L's Waterford III nuclear power plant.
3.
All documents relating to any Notices of Violations (10 C.F.R. 2.201) Civil Penalties; (10 C.F.R. 2.205), and Orders (10 C.F.R. 2.202 and 2.204) which involve or were im-posed upon LP&L, its agents, employees, contractors, and/or subcontractors in connection with facility construction at LP&L's Waterford III nuclear power plant.
4.
All documents evaluating or discussing in any way construction progress and performance by LP&L,.its agents, employees, contractors, and/or subcontractors in connection with LP&L's Waterford III nuclear power plant.
-&~) f>,'J Y FAA/A$
? ___
- LYON AN D K URZ Nuclear Regulatory Commission August 25, 1983 l
Page Two 5.
All documents evaluating or discussing in any way performance by LP&L, its agents, employees, contractors, and/or subcontractor of quality assurance / quality control requirements in connection with LP&L's Waterford III nuclear power plant.
As used in this request, " document" includes, but is not limited to, correspondence, memoranda, reports, notices, decress, orders, records, computer printouts, schedules, and writings of any kind.
We ask that the requested documents be made available at an identified location within 10 days hereof.
Yours truly, 4
V. Frederic Lyon ~
VFL:swb l
g-
.4 q.6.
- - - - -