d OPERATING DATA REPORT Rtvision 2 DOCKET NO.
050-0298 UNIT CNS DATE March 10. 1995 OPERATING STATUS TELEPHONE (402) 825-5829 1.
Unit Name:
Cocoer Nuclear Station Notes 2.
Reporting Period:
December 1994 3.
Licensed Thermal Power (MWt):
2381 4.
Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Net MWe):
778 6.
Maximum Dependable Capacity (Gross MWe):
787 7.
Maximum Dependable Capacity (Net MWe):
764 8.
If Changes Occur in Capacity Ratings (ftems Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
10.
Reasons For Restriction, if Any:
This Month Yr.-to-Date Cumulative 11.
Hoars in Reporting Period 744.0 8.760.0 179.737.0 12.
Number of Hours Reactor Was Critical O.O 3.076 1 133.190.2 13.
Reactor Reserve Shutdown Hours 0.0 0.0 OS.
14.
Hours Generator On-Line 0.0 3.033.0 131.279.3 15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 0.0 6.953.352.0 271.311.244.0 17.
Gross Electric Energy Generated (MWH) 0.0 2.296.447.0 88.118.345.0 10.
Net Electric Energy Generated IMWH) 0.0 2.227.260.0 85.098.438.0 19.
Unit Service Factor 0.0 34.6 73.0 20.
Unit Availability Factor 0.0 34.6 73.0 21.
Unit Capacity Factor (Using MDC Net) 0.0 33.3 62.0 22, Unit Capacity Factor (Using DER Net) 0.0 32.7 60.9 23.
Unit Forced Outage Rate 100.0 65.4 8.0 24.
Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None.
l 25.
If Shut Down At End of Report Period, Estimated Date of Startup:
N/A l
26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9503160134 95o310 PDR ADOCK 05000298 R