Suppls 831025 Request for Exemption from Requirements of 10CFR73.55 for Portion of Steam Generator Repair Program. Encl Withheld (Ref 10CFR73.21)
ML20081B422
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/05/1984
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NLS-84-085, NLS-84-85, NUDOCS 8403090094
Download: ML20081B422 (2)


Text

9:

,rf-Carolina Power & Light Company.

MAR 0 51984 s

Director.of Nuclear Reactor Regulation

Attention:

.Mr. Steven A. Varga, Chief ATTEMN Operating Reactors-Branch No. 1 Division of Licensing CONTAINS INFORMATION United States Nuclear Regulatory Commission WHICH IS:

Washington,-DC 20555 I

H.'B. ROBINSON' STEAM ELECTRIC' PLANT, UNIT NO. 2 SAFEGUARDS INFORMATION DOCKET NO. 50-261/ LICENSE NO.-DPR-23 SUPPLEMENT TO REQUEST FOR EXEMPTION FROM THE REQUIREMENTS OP 10 CFR 73.55 UNAUTHORIZED DISCLOSURE SUBJECT

Dear Mr. Varga:

.TO CR!MINAL & CML SANCTIONS

-10 CFR 73.80-

' Summary -

In Carolina Power'& Light' Company's (CP&L) previous letter to you, dated Octob er ' 25, 1983, CP&L requested an exemption from the requirements of 10 CFR 73.55 for a portion of the H. B. Robinson Steam Electric Plant, Unit

-No. 2 (HBR2) steam generator repair program (SGRP). This previous 5-correspondence was discussed with Mr. Charles E. Gaskin of the Office of Nuclear Material Safety and Safeguards in a meeting at HPR2 on December 15,

1983. As a result of this meeting and succeeding events, CP&L is supplementing-this previous information and providing additional information regarding the schedule for this outage now in progress.

Discussion a

t Carolina Power & Light Company's previous correspondence, as noted above, discussed the purpose of-the' exemption request, briefly described the outage (fF

- for which the exemption was requested,. described the security measures or

. compensatory measures to be taken to protect the spent fuel, and referred to

~

the. schedule for the-outage at,that time.. On January 26, 1984, HBR2 was

~

1 forced to shutdown due to steam generator tube leaks. Subsequent inspections indicated that the steam generators had deteriorated to the point that continued operation prior to repair (the SGRP) was impractical.

In view of the preceding, the decision was made to go forward with the SGRP at this time. ~ Present projections are that this outage will require approximately

-47 weeks.' : Based on comments provided by_Mr. Gaskin at the aforementione g, ;.

RESPCMSIBLE DEPARTMENT WHEN SEPARATED FROM ENCLOSURES, PUWT/SECTION M S5

?!

e403o9oo94 e40305 lANDE THis DOCUMENT AS DECONTROLLED-

&MYY a

PDR ADOCK 05000261 F

PDR 1

411 Fayetteville Street

  • P. O. Box 1551. Raleigh, N. C. 27602

,teau ri

c; s

MAR 0 51984 4

s.

meeting we:have modified the details of our previous request. These modifications revolve around the details of the compensatory security measures to be taken while the requested exemption is in effect. The primary change involves the time at which the exemption takes effect and the time at which co _

the normal security program is reinstated. The attached appendix outlines

, Ethese details and supersedes in its entirety the appendix of our previous submittal.

t 1bs the. specifics of the exemption being sought involve Safeguards Information,

^the'information in the attached appendix should be protected in accordance with the provisions of 10 CFR 73.21.

'As stated.previously, CP&L recognizes its responsibility for maintaining an adequate. level of security and is fully prepared to implement the measures

' ~

necessary to protect HBR2 against radiological sabotage or theft of special nuclear-material. Carolina Power & Light Company appreciates your cooperation in the.' consideration of this exemption request and stands ready to meet with you at any time to discuss the details of this matter. As noted earlier the SGRP has already begun. Due to the benefits expected from an early implementation of this exemption, CP&L requests that you expedite the NRC review and approval of this matter.

If there is anything which CP&L can do to assist;in expediting your review of this matter, please contact

David C. Stadler, Project Engineer - Nuclear Licensing (919-836-6739) or John'B Walker,_Jr., Project Specialist - Industrial Security (919-836-7316).

Yours very_truly, J

. E. Utley DCS/cfr' (9552DCS)

Attachment:

- Appendix cc:

Mr. J. P. O'Reilly (NRC-RII) W/A*

Mr'. G. Requa (NRC) p Mr. Steve Weise (NRC-HBR)

\\

N WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED.

I>

  • Only those individuals with W/A (with appendix) following their names are to e

l receive copies of:the letter and Appendix.,All other individuals and files

[,

c receive.the letter only.

's 4

L-.